All public logs
Jump to navigation
Jump to search
Combined display of all available logs of MediaWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Tiw by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Tim by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Pp-template by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Pp-meta/pagetype by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Pp-meta by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Nmbox by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Languages/Title by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Languages/Lang by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Languages by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:LangSwitch by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:GetFallback by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Documentation/doc by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Documentation by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Doc by file upload (1 revision)
- 14:58, 2 July 2014 Greenes2 talk contribs changed group membership for Rinarda from bureaucrat and administrator to bureaucrat
- 14:57, 2 July 2014 Greenes2 talk contribs changed group membership for Alcantarj from bureaucrat and administrator to bureaucrat
- 14:09, 2 July 2014 Greenes2 talk contribs uploaded File:Fig109-2.png (Final Estimate Cover Letter/Checklist)
- 11:22, 2 July 2014 Greenes2 talk contribs deleted page File:Work continues on the new M-85 (Fort Street) bridge over the Rouge River in Detroit. This project's expected to be finished in late November.jpg (Duplicated file: This one is messed up!)
- 11:18, 2 July 2014 Greenes2 talk contribs uploaded File:Work continues on the new M-85 bridge over the Rouge River in Detroit.jpg (Work continues on the new M-85 bridge over the Rouge River in Detroit.)
- 10:39, 2 July 2014 Greenes2 talk contribs uploaded File:Work continues on the new M-85 (Fort Street) bridge over the Rouge River in Detroit. This project's expected to be finished in late November.jpg (Work continues on the new M-85 (Fort Street) bridge over the Rouge River in Detroit. This project's expected to be finished in late November.)
- 10:38, 2 July 2014 Greenes2 talk contribs uploaded File:Mount Elliot Park on the Detroit riverfront.jpg (Mount Elliot Park on the Detroit riverfront.)
- 10:37, 2 July 2014 Greenes2 talk contribs uploaded File:Progress on the M-231 bridge over the Grand River in Ottawa County.jpg (Progress on the M-231 bridge over the Grand River in Ottawa County)
- 09:51, 2 July 2014 Greenes2 talk contribs uploaded File:ExCMpg3.png (Example Contract Modification Page 3)
- 09:50, 2 July 2014 Greenes2 talk contribs uploaded File:ExCMpg2.png (Example Contract Modification Page 2)
- 09:50, 2 July 2014 Greenes2 talk contribs uploaded File:ExCMpg1.png (Example Contract Modification Page 1)
- 09:49, 2 July 2014 Greenes2 talk contribs deleted page File:ExCMpg1.png (too wide)
- 09:47, 2 July 2014 Greenes2 talk contribs uploaded File:ExCMpg1.png (Example Contract Modification Page 1)
- 08:51, 25 June 2014 Greenes2 talk contribs uploaded File:Crews recently removed bridge beams from M-47 over US-10 near Midland.png (Crews recently removed bridge beams from M-47 over US-10 near Midland)
- 14:17, 17 June 2014 Greenes2 talk contribs uploaded File:Appendix B - Sample Contract Modification.pdf (Sample Contract Modification)
- 14:16, 17 June 2014 Greenes2 talk contribs uploaded File:Appendix A - Approval Path Flow Chart.pdf (Approval Path Flow Chart)
- 15:26, 30 May 2014 Greenes2 talk contribs uploaded File:DownTown Detroit Panorama.png (Downtown Detorit Panorama at the Monument to Joe Louis)
- 08:57, 29 May 2014 Greenes2 talk contribs uploaded File:I-96 Livonia.png (Concrete Paving I-96 in Livonia)
- 16:04, 21 May 2014 Greenes2 talk contribs deleted page 110 - Programs Not Covered by Standard Specifications (Author request: content was: "110 - Programs not Covered by Standard Specification * 110.01 - Engineer Certification Program * 110.02 - Railroad Highway Projects * 110.03 - Delay of Project Due to Utility Conflict * [[110.04 - Final Financ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 204.04 - Demolition Contracts (Author request: content was: "===Demolition Contracts=== There is no reference to this work in the Standard Specifications for Construction. Requirements for demolition work are usually detailed in contracts prepared by the Real Estate Support Area. ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 502.03 - Surface Preperation (Author request: content was: "502 - HMA Construction Practices ==502.03 - SURFACE PREPARATION== ===502.03.1 Aggregate Base=== The ride quality of the surface depends, to a great degree, upon the conditioning and preparation of the aggregate ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 102.03 - Progress Clause (Author request: content was: "102 - PreConstruction Administration '''102.03 - PROGRESS CLAUSE''' The Engineer is responsible for providing the Progress Clause at the OEC meeting. The Progress Clause is an important part of the bidding proposal ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.04 - Final Financial Process (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.06 - FINAL FINANCIAL PROCESS''' After concurrence with the audit report is obtained, and if nec..." (and the only contributor was "[[Special:Contributions/...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.03 - Delay of Project Due to Utility Conflict (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.03 - DELAY OF PROJECT DUE TO A UTILITY CONFLICT''' '''110.03.1 General Information''' When ..." (and the only contributor was "[[Special:Contributions/...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.02 - Railroad Highway Projects (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.02 - RAILROAD HIGHWAY PROJECTS''' Safety deficiencies, evaluation of crossing/separation condit..." (and the only contributor was "[[Special:Contributions/...)
- 16:02, 21 May 2014 Greenes2 talk contribs deleted page 110.01 - Engineer Certification Program (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.01 - ENGINEER CERTIFICATION PROGRAM''' In order to be eligible for certification, the following criteria must be met: * Recommendation for certification b...)
- 16:02, 21 May 2014 Greenes2 talk contribs deleted page 109.09 - Final Estimate Review (Author request: content was: "109 - Measurement and Payment '''109.09 - FINAL ESTIMATE REVIEW''' When the Engineer has determined the final quantities of all pay items, the Region office should be advised that the project is ready for a final est...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.08 - Documents Necessary for Final Payment (Author request: content was: "109 - Measurement and Payment '''109.08 - DOCUMENTS NECESSARY FOR FINAL PAYMENT''' After review by the Region, forms and documents necessary for payment of the final estimate should be submitted as shown below. {| c...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.07 - Final Marked Plans (Author request: content was: "109 - Measurement and Payment '''109.07 - FINAL MARKED PLANS''' Marked plans showing "as constructed" changes should be submitted to the Lansing Design Support Area upon completion of a project. This information is ...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.06 - Final Estimates (Copyright violation: content was: "109 - Measurement and Payment '''109.06 - FINAL ESTIMATES''' The following procedure for processing final estimates will expedite the finalizing of projects and final payment to the Contractor for completed work...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.05 - Overruns (Author request: content was: "109 - Measurement and Payment '''109.05 - OVERRUNS''' '''109.05.1 Overrun Letters''' Overrun letters are usually prepared in Lansing by the Contract Administration Engineer. Overrun letters follow the same proce...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.04 - Reduction in Reserve (Author request: content was: "109 - Measurement and Payment '''109.04 - REDUCTION IN RESERVE''' The computer is programmed to reduce the reserve to 2 percent automatically upon payment of 90 percent of the contract amount. At that time, the cont...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.03 - Acceptance of Work (Author request: content was: "109 - Measurement and Payment '''109.03 - ACCEPTANCE OF WORK''' When the project is substantially completed, a post construction inspection of the project should be performed by the Engineer and senior technician. T...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.02 - Force Account Checklist (Author request: content was: "109 - Measurement and Payment '''109.02 - FORCE ACCOUNT CHECKLIST''' This checklist provides an overview of the documentation required for force account work. More detailed descriptions are provided on the following...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.01 - Force Account Work (Author request: content was: "109 - Measurement and Payment '''109.01 - FORCE ACCOUNT WORK''' Force account basis for payment should be used in accordance with subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/109%20Measurement%20&...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.04 - Guidelines for Assessing Liquidated Damages (Author request: content was: "108 - Prosecution and Progress '''108.04 - GUIDELINES FOR ASSESSING LIQUIDATED DAMAGES''' The Contract Modifications, Form 1100, which follow or accompany the request for extension of contract time, should merely rev...)