All public logs
Jump to navigation
Jump to search
Combined display of all available logs of MediaWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 100 | older 100) (20 | 50 | 100 | 250 | 500)- 14:06, 18 September 2014 Greenes2 talk contribs deleted page 503 - Contractor Quality Control for HMA (Author request: Wiki Clean up of unused pages)
- 14:01, 18 September 2014 Greenes2 talk contribs deleted page Category:Division 2 (Author request)
- 15:20, 16 September 2014 Greenes2 talk contribs uploaded File:Construction Guidance for Pavement Marking Projects.pdf
- 14:41, 16 September 2014 Greenes2 talk contribs deleted page DGTest (Author request)
- 14:36, 16 September 2014 Greenes2 talk contribs deleted page ICMANUAL DRAFT (Author request)
- 14:35, 16 September 2014 Greenes2 talk contribs deleted page Innovative Contracting Manual (Author request)
- 15:25, 5 September 2014 Greenes2 talk contribs deleted page Division 1 Supplemental Information (Author request: Old/conflicting information)
- 13:27, 4 September 2014 Greenes2 talk contribs deleted page 701 - Portland Cement Concrete (Rename of page to follow 2012 SSFC)
- 15:27, 7 August 2014 Greenes2 talk contribs uploaded File:E-sign brochure.pdf (E-sign brochure)
- 15:53, 10 July 2014 Greenes2 talk contribs changed group membership for Guyona from (none) to administrator (Added for job duties)
- 08:04, 9 July 2014 Greenes2 talk contribs deleted page File:Fig715-02.png (Duplicated file)
- 08:01, 9 July 2014 Greenes2 talk contribs uploaded File:Fig715-02.jpg (Figure 715-02 Near white blasted steel surface (SSPC-SP10).)
- 07:59, 9 July 2014 Greenes2 talk contribs deleted page File:Fig715-02.png (Deleted old revision 20140709115647!Fig715-02.png: Duplicated file)
- 07:58, 9 July 2014 Greenes2 talk contribs deleted page File:Fig715-02.png (Deleted old revision 20140709115618!Fig715-02.png: Duplicated file)
- 07:58, 9 July 2014 Greenes2 talk contribs deleted page File:Fig715-02.png (Deleted old revision 20140709115429!Fig715-02.png: Duplicated file)
- 07:56, 9 July 2014 Greenes2 talk contribs uploaded a new version of File:Fig715-02.png (Reverted to version as of 11:51, 9 July 2014)
- 07:56, 9 July 2014 Greenes2 talk contribs uploaded a new version of File:Fig715-02.png (Clearer Picture)
- 07:54, 9 July 2014 Greenes2 talk contribs uploaded a new version of File:Fig715-02.png (Trying to provide a clearer picture)
- 07:51, 9 July 2014 Greenes2 talk contribs uploaded a new version of File:Fig715-02.png (increased picture size)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Module:Yesno by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Module:Namespace detect/data by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Module:Namespace detect/config by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Module:Namespace detect by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Module:Message box/configuration by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Module:Message box by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Module:HtmlBuilder by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Module:Documentation/config by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Module:Documentation by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Module:Category handler by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Module:Arguments by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Uselang by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Tiw by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Tim by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Pp-template by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Pp-meta/pagetype by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Pp-meta by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Nmbox by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Languages/Title by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Languages/Lang by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Languages by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:LangSwitch by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:GetFallback by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Documentation/doc by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Documentation by file upload (1 revision)
- 09:28, 3 July 2014 Greenes2 talk contribs imported Template:Doc by file upload (1 revision)
- 14:58, 2 July 2014 Greenes2 talk contribs changed group membership for Rinarda from bureaucrat and administrator to bureaucrat
- 14:57, 2 July 2014 Greenes2 talk contribs changed group membership for Alcantarj from bureaucrat and administrator to bureaucrat
- 14:09, 2 July 2014 Greenes2 talk contribs uploaded File:Fig109-2.png (Final Estimate Cover Letter/Checklist)
- 11:22, 2 July 2014 Greenes2 talk contribs deleted page File:Work continues on the new M-85 (Fort Street) bridge over the Rouge River in Detroit. This project's expected to be finished in late November.jpg (Duplicated file: This one is messed up!)
- 11:18, 2 July 2014 Greenes2 talk contribs uploaded File:Work continues on the new M-85 bridge over the Rouge River in Detroit.jpg (Work continues on the new M-85 bridge over the Rouge River in Detroit.)
- 10:39, 2 July 2014 Greenes2 talk contribs uploaded File:Work continues on the new M-85 (Fort Street) bridge over the Rouge River in Detroit. This project's expected to be finished in late November.jpg (Work continues on the new M-85 (Fort Street) bridge over the Rouge River in Detroit. This project's expected to be finished in late November.)
- 10:38, 2 July 2014 Greenes2 talk contribs uploaded File:Mount Elliot Park on the Detroit riverfront.jpg (Mount Elliot Park on the Detroit riverfront.)
- 10:37, 2 July 2014 Greenes2 talk contribs uploaded File:Progress on the M-231 bridge over the Grand River in Ottawa County.jpg (Progress on the M-231 bridge over the Grand River in Ottawa County)
- 09:51, 2 July 2014 Greenes2 talk contribs uploaded File:ExCMpg3.png (Example Contract Modification Page 3)
- 09:50, 2 July 2014 Greenes2 talk contribs uploaded File:ExCMpg2.png (Example Contract Modification Page 2)
- 09:50, 2 July 2014 Greenes2 talk contribs uploaded File:ExCMpg1.png (Example Contract Modification Page 1)
- 09:49, 2 July 2014 Greenes2 talk contribs deleted page File:ExCMpg1.png (too wide)
- 09:47, 2 July 2014 Greenes2 talk contribs uploaded File:ExCMpg1.png (Example Contract Modification Page 1)
- 08:51, 25 June 2014 Greenes2 talk contribs uploaded File:Crews recently removed bridge beams from M-47 over US-10 near Midland.png (Crews recently removed bridge beams from M-47 over US-10 near Midland)
- 14:17, 17 June 2014 Greenes2 talk contribs uploaded File:Appendix B - Sample Contract Modification.pdf (Sample Contract Modification)
- 14:16, 17 June 2014 Greenes2 talk contribs uploaded File:Appendix A - Approval Path Flow Chart.pdf (Approval Path Flow Chart)
- 15:26, 30 May 2014 Greenes2 talk contribs uploaded File:DownTown Detroit Panorama.png (Downtown Detorit Panorama at the Monument to Joe Louis)
- 08:57, 29 May 2014 Greenes2 talk contribs uploaded File:I-96 Livonia.png (Concrete Paving I-96 in Livonia)
- 16:04, 21 May 2014 Greenes2 talk contribs deleted page 110 - Programs Not Covered by Standard Specifications (Author request: content was: "110 - Programs not Covered by Standard Specification * 110.01 - Engineer Certification Program * 110.02 - Railroad Highway Projects * 110.03 - Delay of Project Due to Utility Conflict * [[110.04 - Final Financ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 204.04 - Demolition Contracts (Author request: content was: "===Demolition Contracts=== There is no reference to this work in the Standard Specifications for Construction. Requirements for demolition work are usually detailed in contracts prepared by the Real Estate Support Area. ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 502.03 - Surface Preperation (Author request: content was: "502 - HMA Construction Practices ==502.03 - SURFACE PREPARATION== ===502.03.1 Aggregate Base=== The ride quality of the surface depends, to a great degree, upon the conditioning and preparation of the aggregate ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 102.03 - Progress Clause (Author request: content was: "102 - PreConstruction Administration '''102.03 - PROGRESS CLAUSE''' The Engineer is responsible for providing the Progress Clause at the OEC meeting. The Progress Clause is an important part of the bidding proposal ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.04 - Final Financial Process (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.06 - FINAL FINANCIAL PROCESS''' After concurrence with the audit report is obtained, and if nec..." (and the only contributor was "[[Special:Contributions/...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.03 - Delay of Project Due to Utility Conflict (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.03 - DELAY OF PROJECT DUE TO A UTILITY CONFLICT''' '''110.03.1 General Information''' When ..." (and the only contributor was "[[Special:Contributions/...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.02 - Railroad Highway Projects (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.02 - RAILROAD HIGHWAY PROJECTS''' Safety deficiencies, evaluation of crossing/separation condit..." (and the only contributor was "[[Special:Contributions/...)
- 16:02, 21 May 2014 Greenes2 talk contribs deleted page 110.01 - Engineer Certification Program (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.01 - ENGINEER CERTIFICATION PROGRAM''' In order to be eligible for certification, the following criteria must be met: * Recommendation for certification b...)
- 16:02, 21 May 2014 Greenes2 talk contribs deleted page 109.09 - Final Estimate Review (Author request: content was: "109 - Measurement and Payment '''109.09 - FINAL ESTIMATE REVIEW''' When the Engineer has determined the final quantities of all pay items, the Region office should be advised that the project is ready for a final est...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.08 - Documents Necessary for Final Payment (Author request: content was: "109 - Measurement and Payment '''109.08 - DOCUMENTS NECESSARY FOR FINAL PAYMENT''' After review by the Region, forms and documents necessary for payment of the final estimate should be submitted as shown below. {| c...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.07 - Final Marked Plans (Author request: content was: "109 - Measurement and Payment '''109.07 - FINAL MARKED PLANS''' Marked plans showing "as constructed" changes should be submitted to the Lansing Design Support Area upon completion of a project. This information is ...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.06 - Final Estimates (Copyright violation: content was: "109 - Measurement and Payment '''109.06 - FINAL ESTIMATES''' The following procedure for processing final estimates will expedite the finalizing of projects and final payment to the Contractor for completed work...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.05 - Overruns (Author request: content was: "109 - Measurement and Payment '''109.05 - OVERRUNS''' '''109.05.1 Overrun Letters''' Overrun letters are usually prepared in Lansing by the Contract Administration Engineer. Overrun letters follow the same proce...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.04 - Reduction in Reserve (Author request: content was: "109 - Measurement and Payment '''109.04 - REDUCTION IN RESERVE''' The computer is programmed to reduce the reserve to 2 percent automatically upon payment of 90 percent of the contract amount. At that time, the cont...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.03 - Acceptance of Work (Author request: content was: "109 - Measurement and Payment '''109.03 - ACCEPTANCE OF WORK''' When the project is substantially completed, a post construction inspection of the project should be performed by the Engineer and senior technician. T...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.02 - Force Account Checklist (Author request: content was: "109 - Measurement and Payment '''109.02 - FORCE ACCOUNT CHECKLIST''' This checklist provides an overview of the documentation required for force account work. More detailed descriptions are provided on the following...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.01 - Force Account Work (Author request: content was: "109 - Measurement and Payment '''109.01 - FORCE ACCOUNT WORK''' Force account basis for payment should be used in accordance with subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/109%20Measurement%20&...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.04 - Guidelines for Assessing Liquidated Damages (Author request: content was: "108 - Prosecution and Progress '''108.04 - GUIDELINES FOR ASSESSING LIQUIDATED DAMAGES''' The Contract Modifications, Form 1100, which follow or accompany the request for extension of contract time, should merely rev...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.03 - Extension of Time and Liquidated Damages (Author request: content was: "108 - Prosecution and Progress '''108.03 - EXTENSION OF TIME AND LIQUIDATED DAMAGES''' Conditions for granting additional time are discussed in subsections [http://mdotcf.state.mi.us/public/specbook/files/2012/108%20...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.02 - Biweekly Construction Progress Report (Author request: content was: "108 - Prosecution and Progress '''108.02 - BIWEEKLY CONSTRUCTION PROGRESS REPORT''' The ''Biweekly Construction Progress Report, Form 1102A'', is used to record progress of the work on a project. Its purpose is to a...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.01 - Payment for Delivered Materials (Author request: content was: "108 - Prosecution and Progress '''108.01 - PAYMENT FOR DELIVERED MATERIALS''' Materials specifically produced or purchased for the project and stockpiled for use on the project may be paid for on the biweekly/weekly ...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 105.04 - Statement of Material & Labor Used (Author request: content was: "105 - Control of Materials '''105.04 - STATEMENT OF MATERIALS AND LABOR USED''' The Statement of Materials and Labor Used, FHWA-47 report, is used to document total quantities and cost of all materials and supplies p...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.03 - Monthly Report on Material Inspection (Author request: content was: "105 - Control of Materials '''105.03 - MONTHLY REPORT ON MATERIAL INSPECTION''' VISUAL INSPECTION - All materials should be visually inspected (VI) prior to incorporation into the project. Materials may be accepted ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.02 - Transfer of Tested Materials (Author request: content was: "105 - Control of Materials '''105.02 - TRANSFER OF TESTED MATERIAL''' When transferring construction materials which were tested and accepted for a specific project but are to be used on another project, it is not ne...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.01 - General Information (Author request: content was: "105 - Control of Materials '''105.01 - GENERAL INFORMATION''' All materials incorporated into the project must be tested by MDOT, certified by the manufacturer as meeting the applicable specifications, selected from ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.12 - Supplies and Equipment Paint Colors (Author request: content was: "104 - Construction Surveying '''104.12 - SUPPLIES AND EQUIPMENT PAINT COLORS''' When painting removal items, grades, witness stakes, etc., only certain colors are to be used. The color that has been set aside for su...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.11 - Consultant/Contractor Staking Quality Assurance Guidelines (Author request: content was: "104 - Construction Surveying '''104.11 - CONSULTANT/CONTRACTOR STAKING QUALITY ASSURANCE GUIDELINES''' The number of checks noted below are considered to be the minimum to be taken over the life of the project. When...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.10 - Reporting Sturcture Clearances (Author request: content was: "104 - Construction Surveying '''104.10 - REPORTING STRUCTURE CLEARANCES''' It is necessary to measure and report altered clearances. This needs to be done in the case of new construction, or improvement of existing ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.09 - Bridge Staking (Author request: content was: "104 - Construction Surveying '''104.09 - BRIDGE STAKING''' The Engineer will furnish a stakeout diagram or a baseline and reference point coordinates for each bridge and box culvert. Information on the stakeout diag...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.08 - Construction Staking (Author request: content was: "104 - Construction Surveying '''104.08 - CONSTRUCTION STAKING''' All construction staking and information given to the Contractor shall be properly documented. The crew chief or Engineer shall advise the Contractor ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.07 - Cross Sections (Author request: content was: "104 - Construction Surveying '''104.07 - CROSS SECTIONS''' The purpose of cross sectioning is to determine accurate information from which to compute earthwork quantities. Before starting, the crew chief should inst...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.06 - Vertical Curves (Author request: content was: "104 - Construction Surveying '''104.06 - VERTICAL CURVES''' MDOT generally uses equal tangent vertical curves. An equal tangent vertical curve sketch is shown in '''''Figure 104-20'''''. File:Figure104.06-1.JPG|thu...)
- 15:52, 21 May 2014 Greenes2 talk contribs deleted page 104.05 - Vertical Control (Author request: content was: "104 - Construction Surveying '''104.05 - VERTICAL CONTROL''' Before any level work is done on a project, the bench marks shown on the plans must be checked for elevation and location. It is the policy of the departm...)
- 15:52, 21 May 2014 Greenes2 talk contribs deleted page 104.04 - Right-of-Way (Author request: content was: "104 - Construction Surveying '''104.04 - RIGHT-OF-WAY''' ROW limits should be established before construction begins. Stakes marking the ROW line should be set on both sides of the construction centerline at 100 foo...)
- 15:52, 21 May 2014 Greenes2 talk contribs deleted page 104.03 - Horizontal Curves (Author request: content was: "104 - Construction Surveying '''104.03 - HORIZONTAL CURVES''' Before running horizontal curves or spirals, the data should be checked and deflection angles and chord lengths computed. If coordinates are going to be ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 104.02 - Horizontal Control (Author request: content was: "104 - Construction Surveying '''104.02 - HORIZONTAL CONTROL''' Horizontal control begins with locating the control points, traverse points, mapping points, section corners, etc., set by Design surveys. These points ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 104.01 - General (Author request: content was: "104 - Construction Surveying '''104.01 - GENERAL''' To ensure uniformity and to reduce errors the procedures, methods and policies presented in this section should be followed. A large portion of engineering costs i...)