Deletion log
Jump to navigation
Jump to search
Below is a list of the most recent deletions.
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.16 - MDOT Standard Practice for Random Sampling of HMA Materials (Author request: content was: "502 - HMA Construction Practices '''502.16 - MDOT STANDARD PRACTICE FOR RANDOM SAMPLING OF HMA MATERIALS''' '''502.16.1 SCOPE''' This practice covers the determination of random locations at which samples of cons...)
- 14:46, 21 May 2014 Greenes2 talk contribs deleted page 502.17 - Temporary Patching with HMA Mixtures (Author request: content was: "502 - HMA Construction Practices '''502.17 - TEMPORARY PATCHING WITH HMA MIXTURE''' '''502.17.1''' The HMA mixture used for patching should be the top course mixture called for on the plans, or in the proposal. ...)
- 14:46, 21 May 2014 Greenes2 talk contribs deleted page 502.18 - Glossary of Paving Terms (Author request: content was: "502 - HMA Construction Practices '''502.18 - GLOSSARY OF PAVING TERMINOLOGY''' * AGGREGATE - Various hard, inert materials such as sand, gravel, pebbles, etc., used as the bulk material in asphaltic mixes. * ANGLE O...)
- 14:46, 21 May 2014 Greenes2 talk contribs deleted page 505 - Overband Crack Seal (Author request: content was: "505 - Overband Crack Seal - Reserved -")
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.01 - Materials (Author request: content was: "506 - Slurry Seal '''506.01 - MATERIALS''' The asphalt emulsion must be certified and supplied by an approved supplier. The mix design and quality control testing is the responsibility of the Contractor. The MDOT i...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.02 - Equipment (Author request: content was: "506 - Slurry Seal '''506.02 - EQUIPMENT''' Equipment shall be safe, environmentally acceptable and capable of producing a specification product. A typical product will have some, or all, of the following equipment o...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.03 - Pre-Paving Meeting (Author request: content was: "506 - Slurry Seal '''506.03 - PRE-PAVING MEETING''' A pre-paving conference between the Contractor and the Engineer should be held on site prior to beginning work. {| class="wikitable" |- | colspan="2" | <center>'...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.04 - Construction (Author request: content was: "506 - Slurry Seal '''506.04 - CONSTRUCTION''' '''506.04.1 Site Preparation''' All loose materials, vegetation, dirt, mud and other objectionable material shall be removed from the surface prior to placing the mi...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.05 - Delayed Acceptance (Author request: content was: "506 - Slurry Seal '''506.05 - DELAYED ACCEPTANCE''' The Contractor is responsible for placing a uniform product. This type of work has a 30 day delayed acceptance procedure so that any major problems will be correct...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.01 - Materials (Author request: content was: "507 - Micro Surfacing '''507.01 - MATERIALS''' Micro-surfacing should be used only for filling rutted pavements. All other applications are inappropriate. However, if called for on the plans or proposal, the follow...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.02 - Equipment (Author request: content was: "507 - Micro Surfacing '''507.02 - EQUIPMENT''' '''507.02.1 Mixing Machine''' The mixing machine shall be equipped with a positive connection conveyer belt aggregate delivery system and an inter-connected positiv...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.03 - Pre-Paving Meeting (Author request: content was: "507 - Micro Surfacing '''507.03 - PRE-PAVING MEETING''' A pre-paving conference between the Contractor and the Engineer should be held on site prior to beginning work. {| class="wikitable" |- | colspan="2" | <cent...)
- 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.04 - Construction (Author request: content was: "507 - Micro Surfacing '''507.04 - CONSTRUCTION''' Before placing the mixture, the Contractor shall thoroughly clean the existing surface of all loose materials, vegetation, dirt, dust, mud and other objectionable mat...)
- 14:42, 21 May 2014 Greenes2 talk contribs deleted page 507.05 - Delayed Acceptance (Author request: content was: "507 - Micro Surfacing '''507.05 - DELAYED ACCEPTANCE''' The Contractor is responsible for placing a uniform product. This type of work has a 30 day delayed acceptance procedure so that any major problems will be cor...)
- 14:42, 21 May 2014 Greenes2 talk contribs deleted page 508.02 - Equipment (Author request: content was: "508 - Chip Seals '''508.02 - EQUIPMENT''' Equipment shall be safe, environmentally acceptable and capable of producing a product that meets the specifications. The pressure distributor shall meet the same requiremen...)
- 14:42, 21 May 2014 Greenes2 talk contribs deleted page 508.01 - Materials (Author request: content was: "508 - Chip Seals '''508.01 - MATERIALS''' The asphalt emulsion must be a certified product and be supplied by a certified supplier. The Contractor must maintain quality control and uniformity in testing procedures. ...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 508.03 - Pre-Paving Meeting (Author request: content was: "508 - Chip Seals '''508.03 - PRE-PAVING MEETING''' A pre-paving conference between the Contractor and the Engineer should be held on site prior to beginning work. {| class="wikitable" |- | colspan="2" | <center>''...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 508.04 - Construction (Author request: content was: "508 - Chip Seals '''508.04 - CONSTRUCTION''' The surface shall have all dirt, debris and vegetation removed. The asphalt emulsion shall not be placed until the surface is approved by the Engineer. The asphalt emuls...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 508.05 - Delayed Acceptance (Author request: content was: "508 - Chip Seals '''508.05 - DELAYED ACCEPTANCE''' This type of project has a 30 day delayed acceptance procedure. Any major problems with the project will have to be corrected before the project will be accepted. ...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 813.02 - Concrete Slope Paving and Headers (Author request: content was: "813 - Slope Protection '''813.02 - CONCRETE SLOPE PAVING AND HEADERS''' Forms must extend the full depth of the concrete for slope paving. Slope paving hea..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 803.02 - Construction (Author request: content was: "803 - Concrete Sidewalk, Ramps, and Steps '''803.02 - CONSTRUCTION''' The concrete should be struck off, spaded along any fixed forms and floated to a smoot..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 802.02 - Construction (Author request: content was: "802 - Concrete Curb, Gutter, and Dividers '''802.02 - CONSTRUCTION''' Projects with large amounts of curb and gutter will almost always be constructed by th..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 802.01 - General (Author request: content was: "802 - Concrete Curb, Gutter, and Dividers '''802.01 - GENERAL''' Three methods are in general use to construct curb or curb and gutter slipformed, fixed for..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 602.05 - Placing and Finishing Concrete (Author request: content was: "602 - Concrete Pavement Construction '''602.05 - PLACING AND FINISHING CONCRETE''' The specifications set forth the equipment requirements necessary in the ..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 602.03 - Instructions to Concrete Pavement Inspectors (Author request: content was: "602 - Concrete Pavement Construction '''602.03 - INSTRUCTIONS TO CONCRETE PAVEMENT INSPECTORS''' The construction of PCC pavement is a highly mechanized ope..." (and the only contributor was "[[Special:Contributions/...)
- 14:39, 21 May 2014 Greenes2 talk contribs deleted page 602.02 - Concrete Testing Procedures (Author request: content was: "602 - Concrete Pavement Construction '''602.02 - CONCRETE TESTING PROCEDURES''' Quality control testing for concrete QC/QA construction projects will be gov..." (and the only contributor was "[[Special:Contributions/...)
- 14:38, 21 May 2014 Greenes2 talk contribs deleted page 601.07 - Inspection and Control on Small Quantities of Concrete (Author request: content was: "601 - PCC Pavement Mixtures '''601.07 - INSPECTION AND CONTROL ON SMALL QUANTITIES OF CONCRETE''' Small quantities are defined as daily production of less t..." (and the only contributor was "[[Special:Contributions/...)
- 14:38, 21 May 2014 Greenes2 talk contribs deleted page 601.06 - Documentation (Author request: content was: "601 - PCC Pavement Mixtures '''601.06 - DOCUMENTATION''' '''601.06.1 Concrete Tickets''' The Contractor/concrete producer will have computer-generated ..." (and the only contributor was "[[Special:Contributions/...)
- 14:38, 21 May 2014 Greenes2 talk contribs deleted page 601.05 - Mix Computation (Author request: content was: "601 - PCC Pavement Mixtures '''601.05 - MIX COMPUTATION''' '''601.05.1 Unit Weight - Coarse Aggregate''' The coarse aggregate unit weight can be found ..." (and the only contributor was "[[Special:Contributions/...)
- 14:38, 21 May 2014 Greenes2 talk contribs deleted page 601.03 - NRMCA Plant Certification (Author request: content was: "601 - PCC Pavement Mixtures '''601.03 - NRMCA PLANT CERTIFICATION''' Portable and stationary concrete batch plant facilities supplying Portland cement concr..." (and the only contributor was "[[Special:Contributions/...)
- 14:38, 21 May 2014 Greenes2 talk contribs deleted page 605.03 - Reviewing Mix Designs (Author request: content was: "605 - Contractor Quality Assurance for Concrete '''605.03 - REVIEWING MIX DESIGNS''' Regardless of the method of verification selected by the Contractor, all mix designs must be accompanied by strength test results. ...)
- 14:37, 21 May 2014 Greenes2 talk contribs deleted page 605.04 - Concrete QA Pay Adjustment (Author request: content was: "605 - Contractor Quality Assurance for Concrete '''605.04 - Concrete QA Pay Adjustment''' file:Figure 605.03-6.JPG|center|thumb|500px|Figure 605-4 - Portl..." (and the only contributor was "[[Special:Contributions/Ri...)
- 14:37, 21 May 2014 Greenes2 talk contribs deleted page 605.02 - Responsibilities (Author request: content was: "605 - Contractor Quality Assurance for Concrete '''605.02 - RESPONSIBILITIES ''' The responsibilities of each party must be clear at the start of the project. '''605.02.1 Contractor Responsibilities''' Provid...)
- 14:37, 21 May 2014 Greenes2 talk contribs deleted page 605.01 - General (Author request: content was: "605 - Contractor Quality Assurance for Concrete '''605.01 - GENERAL''' Quality assurance for concrete is a statistically based procedure intended for use with standard grades of Portland cement concrete which have be...)
- 14:37, 21 May 2014 Greenes2 talk contribs deleted page 604.07 - Retest and Coring (Author request: content was: "604 - Contractor Quality Control for Concrete '''604.07 - RETEST AND CORING''' The Special Provision provides for retesting or coring a lot of concrete, if the strength requirements are not verified by initial compre...)
- 14:37, 21 May 2014 Greenes2 talk contribs deleted page 604.06 - Calculating Adjustments (Author request: content was: "604 - Contractor Quality Control for Concrete '''604.06 - CALCULATING ADJUSTMENTS''' The concrete quality assurance Special Provision provides step-by-step calculations for figuring the payment on each lot of concret...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 604.05 - Reviewing Mix Designs (Author request: content was: "604 - Contractor Quality Control for Concrete '''604.05 - REVIEWING MIX DESIGNS''' The Contractor is responsible for providing mix designs for all concrete covered by the concrete QC/QA program. Before production be...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 604.04 - Contractor Quality Control for Pavement Warranties (Author request: content was: "604 - Contractor Quality Control for Concrete '''604.04 - CONTRACTOR QUALITY CONTROL FOR CONCRETE PAVEMENT WARRANTIES''' Special provisions currently govern requirements for Contractor Quality Control on projects con...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 604.03 - Quality Control Plan (Author request: content was: "604 - Contractor Quality Control for Concrete '''604.03 - QUALITY CONTROL PLAN''' The Quality Control Plan must: * Stress quality and commitment to job control. * Provide written assurance that all work will be perf...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 604.02 - Responsibilities (Author request: content was: "604 - Contractor Quality Control for Concrete '''604.02 - RESPONSIBILITIES''' The responsibilities of each party must be clear at the start of the project. '''604.02.1 Contractor Responsibilities''' Develop and...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 604.01 - General (Author request: content was: "604 - Contractor Quality Control for Concrete '''604.01 - GENERAL''' Contractor Quality Control for Concrete requires that the Contractor provide and maintain a Quality Control Plan, listing all the personnel, equipm...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 603.12 - Capital Preventative Maintenance - Performance Warranties (Author request: content was: "603 - Concrete Pavement Restoration '''603.12 - CAPITAL PREVENTIVE MAINTENANCE - PERFORMANCE WARRANTIES''' Special provisions currently govern requirements for performance warranties on all Capital Preventive Mainten...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 603.11 - Dowel Bar Retrofit (DBR) (Author request: content was: "603 - Concrete Pavement Restoration '''603.11 - DOWEL BAR RETROFIT (DBR)''' Dowel bar retrofit commonly referred to as DBR is a repair procedure typically used on concrete pavement that exhibits intermittent transver...)
- 14:36, 21 May 2014 Greenes2 talk contribs deleted page 603.10 - Sand Patch Test (ASTM 965.96E) (Author request: content was: "603 - Concrete Pavement Restoration '''603.10 - SAND PATCH TEST ASTM 965-96E''' Measuring Pavement Macro Texture Depth Procedure as follows: * Select a dry homogeneous area that contains no unique features. * Clean ...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.09 - Diamond Grinding (Author request: content was: "603 - Concrete Pavement Restoration '''603.09 - DIAMOND GRINDING''' Diamond grinding is used to restore the surface longitudinal profile and improved ride quality of a PCC pavement. And many times is done in conjunc...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.08 - Sealing Joints and Opening to Traffic (Author request: content was: "603 - Concrete Pavement Restoration '''603.08 - SEALING JOINTS AND OPENING TO TRAFFIC''' Longitudinal bulkhead joints, joints in base course repairs, joints in repairs constructed in preparation for HMA overlays and ...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.07 - Strength Requirements (Author request: content was: "603 - Concrete Pavement Restoration '''603.07 - STRENGTH REQUIREMENTS''' The concrete repairs may be opened to traffic when the concrete has attained a flexural strength of 500 psi (3.5 MPa) for repairs constructed w...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.06 - Palcing and Finishing Concrete (Author request: content was: "603 - Concrete Pavement Restoration '''603.06 - PLACING AND FINISHING CONCRETE''' Concrete will be placed usually the same day the existing concrete is removed and cast full depth in a single pour. Immediately befor...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.05 - Joints (Author request: content was: "603 - Concrete Pavement Restoration '''603.05 - JOINTS''' In general, according to Standard Plan R-44 Series, the repair will have a Tied Joint (Trg) at the leading edge and a Contraction Joint (Crg), or Expansion Jo...)
- 14:34, 21 May 2014 Greenes2 talk contribs deleted page 603.04 - Removing Old Concrete (Author request: content was: "603 - Concrete Pavement Restoration '''603.04 - REMOVING OLD CONCRETE''' Before removal, the concrete will be sawed full depth according to the details shown on the plans or in the proposal. This must be done with m...)