Deletion log
Jump to navigation
Jump to search
Below is a list of the most recent deletions.
(newest | oldest) View (newer 100 | older 100) (20 | 50 | 100 | 250 | 500)- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.10 - Failure to Sign (Author request: content was: "103 - Post Award Administration '''103.10 - FAILURE TO SIGN''' When a Contractor fails to sign a change contract modification, the contract modification should be submitted unsigned after 21 calendar days. If a Cont...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.09 - Balancing Quantities (Author request: content was: "103 - Post Award Administration '''103.09 - BALANCING QUANTITIES''' Balancing Contract Modifications should be prepared as soon as contract items are completed. Do not delay submitting Contract Modifications until t...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.08 - FHWA Approval (Author request: content was: "103 - Post Award Administration '''103.08 - FHWA APPROVAL''' Federally funded projects are considered in two categories, EXEMPT or NONEXEMPT. An EXEMPT project does not require FHWA review and oversight. A NONEXEMP...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.07 - Basis of Payment for Extra Work (Author request: content was: "103 - Post Award Administration '''103.07 - BASIS OF PAYMENT FOR EXTRA WORK''' Documenting the basis of payment on the contract modification for extra work is necessary. Payment can be based on negotiated unit price...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.06 - Distribution (Author request: content was: "103 - Post Award Administration '''103.06 - DISTRIBUTION''' For ''FieldManager'' Version 3.0 and above the Contract Modification is approved and authorized at the Region level. If the Contract Modification does not ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.01 - Work Order (Author request: content was: "103 - Post Award Administration '''103.01 - WORK ORDER''' The Work Order, Form 1137, is a written order signed by the Engineer and requiring performance by the Contractor. Signed work orders have contractual status....)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.05 - Preparing COntract Revisions (Author request: content was: "103 - Post Award Administration '''103.05 - PREPARING CONTRACT MODIFICATIONS''' Contract modifications are usually prepared by the Engineer. If possible, contract modifications should be approved before the work is ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.04 - Decimal Values (Author request: content was: "103 - Post Award Administration '''103.04 - DECIMAL VALUES''' Quantities for Contract Modifications should be computed to the same decimal values shown in the summary of quantities in the contract or proposal, or tot...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.03 - Types of Contract Revisions (Author request: content was: "103 - Post Award Administration '''103.03 - TYPES OF CONTRACT MODIFICATIONS''' '''103.03.1 Changes in Contract''' A change in the contract alters the quantity of existing contract items. This includes items bid ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.02 - Contract Revisions (Author request: content was: "103 - Post Award Administration '''103.02 - CONTRACT MODIFICATIONS''' The Standard Specifications for Construction define a contract modification as the regulation form prepared as a recommendation for changes in, ad...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 102.04 - PreConstruction Meeting (Author request: content was: "102 - PreConstruction Administration '''102.04 - PRECONSTRUCTION MEETING''' A preconstruction meeting will be initiated by the Engineer when authorized or once the confirmed low bidder is announced. Representatives ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page Kari test page (Author request: content was: "<center>For copies of this manual contact the MDOT Publications Office</center> <center>Telephone: (517) 322-1676 Fax: (517) 322-1395</center> <center></..." (and the only contributor was "[[Special:Contributions/Obri...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 102.02 - Plans, Proposals, Input, Review, and Evaluation (Author request: content was: "102 - PreConstruction Administration '''102.02. - PLANS, PROPOSAL, INPUT, REVIEW AND EVALUATION''' With the advent of Plan Review Reengineering, the Engineer assigned to the construction of the project is now involve...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 102.01 - Contractor Evaluations and Prequalification (Author request: content was: "102 - PreConstruction Administration '''102.01 - CONTRACTOR EVALUATIONS AND PREQUALIFICATION''' At a minimum, Contractor evaluations for the last two construction seasons are reviewed when the Contractor applies for ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 101.10 - Controlling Consultant Costs (Author request: content was: "101 - General Project Administration '''101.10. - CONTROLLING CONSULTANT COSTS''' The Regions are charged with knowing their costs and controlling their construction engineering costs. As several consultant construc...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.05 - Certified Payrolls (Author request: content was: "101 - General Project Administration '''101.05 - CERTIFIED PAYROLLS''' '''101.05.1 State Funded Projects ''' Certified weekly payrolls covering the Contractor’s and the Subcontractors’ work forces will not be...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.03 - Field Manager (Author request: content was: "101 - General Project Administration '''101.03 - FIELDMANAGER''' [http://michigan.gov/mdot/0,1607,7-151-9625_47921---,00.html FieldManager] is a construction management system employed by over 1000 users to manage an...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.02 - Project Records (Author request: content was: "101 - General Project Administration '''101.02 - PROJECT RECORDS''' To ensure uniform record keeping of project documents, a standard filing system is followed in each project office. These procedures will be follow...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.09 - Disadvantaged Business Enterprises (DBE's) (Author request: content was: "101 - General Project Administration '''101.09 - DISADVANTAGED BUSINESS ENTERPRISES (DBE’s)''' DBE’s are defined as those prime and subcontractors, truckers, materials suppliers and other service providers who ar...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.08 - On the Job Training (Author request: content was: "101 - General Project Administration '''101.08 - ON-THE-JOB TRAINING''' As of January 1, 2001, MDOT has implemented a new OJT Pilot Program designed to provide training in the skilled construction trade classifica...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.07 - Equal Employment Opportunity (Author request: content was: "101 - General Project Administration '''101.07 - EQUAL EMPLOYMENT OPPORTUNITY''' For these regulations, minorities are defined as Black, Asian or Pacific Islanders, Native American and Hispanic. Compliance with the ...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.06 - Davis-Bacon Provisions (Author request: content was: "101 - General Project Administration '''101.06 - DAVIS-BACON PROVISIONS''' '''101.06.1 Truck Drivers - Owner/Operators''' These individuals are not subject to the wage rates prescribed by the Department of Labor....)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.04 - Inspector's Daily Reports (Author request: content was: "101 - General Project Administration '''101.04 - INSPECTOR’S DAILY REPORT (IDR)''' Perhaps the single most important type of project documentation is the Inspector’s Daily Report (IDR) and its variations. Becaus...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.01 - Project Authority (Author request: content was: "101 - General Project Administration '''101.01 - PROJECT AUTHORITY''' It is important that users of the manual understand their role in ensuring that specifications are adhered to in completing the project. Each per...)
- 15:36, 21 May 2014 Greenes2 talk contribs deleted page 210.06 - Dust Control (Author request: content was: "210 - Environmental '''210.06 - DUST CONTROL''' Dust control is very important, especially during the earthwork phase of construction. Adequate dust control measures will be maintained by the Contractor so as not to...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.05 - Contractor Yards (Author request: content was: "210 - Environmental '''210.05 - CONTRACTOR YARDS''' As mentioned in Section 205 of this manual, under Borrow/Use of Excess Property, the Contractor is not allowed to use sta...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.04 - Discovery of Bones, Archeological, and Historical Findings (Author request: content was: "210 - Environmental '''210.04 - DISCOVERY OF BONES, ARCHAEOLOGICAL AND HISTORICAL FINDINGS''' Subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/107%20Legal%20Rel,%20Resp%20to%20Public.pdf 107.09] of th...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.03 - Hazardous Waste Site Identification Numbers (MIK Numbers) (Author request: content was: "210 - Environmental '''210.03 - HAZARDOUS WASTE SITE IDENTIFICATION NUMBERS (MIK NUMBERS)''' In the past, when waste site identification numbers, formerly MIK numbers, were needed, they were obtained from the Environ...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.02 - Removal of Underground Storage Tanks (Author request: content was: "210 - Environmental '''210.02 - REMOVAL OF UNDERGROUND STORAGE TANKS''' MDOT has the responsibility to remove any underground storage tanks (USTs) found within the ROW, even if not in direct conflict with the propose...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.01 - General (Author request: content was: "210 - Environmental '''210.01 - GENERAL''' This section of the manual is not intended to be an all-inclusive environmental guidance document, but addresses those environmental issues that are commonly associated with...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 209.01 - General (Author request: content was: "209 - Project Cleanup '''209.01 - GENERAL''' This work consists of cleaning up the project, including roadsides, prior to final acceptance. Cleanup applies to the area within the ROW not in excess of 50 feet (15 met...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 208.05 - Non-Compliance Progressive Steps (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.05 - NON-COMPLIANCE PROGRESSIVE STEPS''' '''208.05.01''' The following are suggested progressive steps to take if a Contractor fails to comply with eithe...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 208.02 - Soil Erosion and Sedimentation Control Guidelines (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.02 - SOIL EROSION AND SEDIMENTATION CONTROL GUIDELINES''' '''208.02.01''' Notification: While individual permits are not necessary, the Engineer is requi...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.04 - Winter Shutdown (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.04 - WINTER SHUTDOWN''' '''208.04.01''' MDOT is able to suspend NPDES inspections during the winter on those projects that satisfy all of the following c...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.03 - National Pollutuion Discharge Eliminaton System (NPDES) Guidelines (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.03 - NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GUIDELINES''' '''208.03.01''' The proposal for projects subject to NPDES regulations, earth disturba...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.01 - General (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.01 - GENERAL''' '''208.01.01''' MDOT is responsible to provide transportation services in an environmentally sensitive manner. To that end, the followi...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 207.01 - General (Author request: content was: "207 - Obliterating Roadway '''207.01 - GENERAL''' Obliterating roadway applies only on those portions of the existing or temporary roadway outside the limits of the new roadway. The ditches will be filled and roadwa...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.04 - Suitability of Foundation Material (Author request: content was: "206 - Excavation and Backfill for Structures '''206.04 - SUITABILITY OF FOUNDATION MATERIAL''' Final excavation for the foundation to grade will not be made until just before the concrete is to be placed. Concrete w...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.03 - Excavation for Structures (Author request: content was: "206 - Excavation and Backfill for Structures '''206.03 - EXCAVATION FOR STRUCTURES''' Foundation excavation is set up for the excavation of all materials, except rock, encountered within the foundation excavation lim...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.02 - Backfill for Structures (Author request: content was: "206 - Excavation and Backfill for Structures '''206.02 - BACKFILL FOR STRUCTURES''' Backfill for structures that are bridges, grade separations, pump houses and retaining walls shall be Granular Material Class II, un...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 206.01 - Preparing Abutment Areas (Author request: content was: "206 - Excavation and Backfill for Structures '''206.01 - PREPARING ABUTMENT AREA''' The importance of the proper construction of bridge abutment embankments cannot be overemphasized. The abutments are rigid structur...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.15 - Measurement of Earthwork (Author request: content was: "205 - Roadway Earthwork '''205.15 - MEASUREMENT OF EARTHWORK''' If no changes occur during construction and there are no known design errors, final quantities for earth excavation, embankment CIP and top 3 feet (1 m)...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.14 - Machine Grading (Author request: content was: "205 - Roadway Earthwork '''205.14 - MACHINE GRADING''' Machine grading is used only when light grading, such as may be accomplished with a blade grader, is required to develop the desired section. This item includes...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.13 - Wetland Construction (Author request: content was: "205 - Roadway Earthwork '''205.13 - WETLAND CONSTRUCTION''' If a wetland is to be constructed in association with a project for mitigation purposes, there will generally be plan sheets detailing the construction requ...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.12 - Borrow/Use of Excess Property (Author request: content was: "205 - Roadway Earthwork '''205.12 - BORROW/USE OF EXCESS PROPERTY''' Earth material found outside the grading limits is considered borrow material. This can include material either inside or outside the ROW. Unless...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.11 - Trimming and Finishing Earth Grade (Author request: content was: "205 - Roadway Earthwork '''205.11 - TRIMMING AND FINISHING EARTH GRADE''' After the earth grade has been constructed to the required grade, all stones and rocks more than 3 inches (80 mm) in diameter appearing on the...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.10 - Test Rolling (Author request: content was: "205 - Roadway Earthwork '''205.10 - TEST-ROLLING''' Test-rolling the grade is a very important procedure for determining uniform stability of the subgrade. Perhaps the most important subgrade quality to attain is st...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.09 - Swamp Treatment (Author request: content was: "205 - Roadway Earthwork '''205.09 - SWAMP TREATMENT''' All swamp areas should be shown on plans with a specific method of treatment indicated. All low, poorly drained areas not shown as peat or muck should neverthel...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.08 - Constructing Embankments (Author request: content was: "205 - Roadway Earthwork '''205.08 - CONSTRUCTING EMBANKMENTS''' Embankments are generally constructed by three methods. (The last method will be discussed under Swamp Treatment. * Controlled density method. * 12 i...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.07 - Disposing of Surplus and Unsuitable Material (Author request: content was: "205 - Roadway Earthwork '''205.07 - DISPOSING OF SURPLUS AND UNSUITABLE MATERIAL''' The Contractor will be responsible for disposal of all surplus and unsuitable material. If it is disposed of in a storage area, spe...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.06 - Constructing Ditches (Author request: content was: "205 - Roadway Earthwork '''205.06 - CONSTRUCTING DITCHES''' Removal of material from ditches is generally classed as earth excavation as ditches are normally excavated along with general road cut using typical earth ...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.05 - Subgrade Undercutting (Author request: content was: "205 - Roadway Earthwork '''205.05 - SUBGRADE UNDERCUTTING''' There are three types of subgrade undercutting, all of which include backfilling and compaction. * Type I will be backfilled with selected clay or other s...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.04 - Blasting (Author request: content was: "205 - Roadway Earthwork '''205.04 - BLASTING''' Before using explosives on a project, the Contractor is to furnish the Engineer with a copy of the "rider" or clause in the insurance policy as evidence that there is a...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.03 - Rock Excavation (Author request: content was: "205 - Roadway Earthwork '''205.03 - ROCK EXCAVATION''' This work consists of the removal of solid rock or cemented soils that do not soften when wet or cannot be excavated without continuous drilling, blasting or con...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.02 - Preparing Roadway Foundation (Author request: content was: "205 - Roadway Earthwork '''205.02 - PREPARING ROADWAY FOUNDATION''' The roadway foundation must be properly prepared to provide uniform support and a stable structure. During embankment construction, the following o...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.01 - Earth Excavation (Author request: content was: "205 - Roadway Earthwork '''205.01 - EARTH EXCAVATION''' Section [http://mdotcf.state.mi.us/public/specbook/files/2012/205%20Roadway%20Earthwork.pdf 205] of the Standard Specifications for Construction details constru...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.03 - Hot Mix Asphalt (HMA) Pavements and Driveways (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.03 - HOT MIX ASPHALT (HMA) PAVEMENTS AND DRIVEWAYS''' For removal of HMA pavements and driveways: If the HMA surface removed is 5 inches (130 mm) or less ...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.02 - Structures (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.02 - STRUCTURES''' All structures and attached parts and connections shown on the plans to be removed will be entirely removed. Structures requiring remov...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.01 - Documentation (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.01 - DOCUMENTATION''' Identifying, measuring and recording removal items on an IDR (or on Form 1122A) are very important. If the Contractor chooses to dis...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 203.02 - Culvert of Sewer (Author request: content was: "203 - Removing Drainage Structures, Culverts, and Sewers '''203.02 - CULVERT OR SEWER''' When a culvert pipe and/or sewer pipe is to be removed, the culvert pipe and/or sewer pipe (and end treatments) are to be compl...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 203.01 - Drainage Structures (Author request: content was: "203 - Removing Drainage Structures, Culverts, and Sewers '''203.01 - DRAINAGE STRUCTURES''' When removing or abandoning a drainage structure, any live sewers connected to them will be rebuilt and properly connected t...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 202.02 - Instructions for Removing Corduroy (Author request: content was: "202 - Removing Trees, Stumps, and Corduroy '''202.02 - INSTRUCTIONS FOR REMOVING CORDUROY''' When corduroy is found within 4 feet (1.2 m) below plan grade, its removal will be by the foot (meter) measured along the r...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 202.01 - Instructions for Removing Trees and Stumps (Author request: content was: "202 - Removing Trees, Stumps, and Corduroy '''202.01 - INSTRUCTIONS FOR REMOVING TREES AND STUMPS''' These items will apply to locations outside the areas to be paid as '''Clearing'''. Work in progress and work comp...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 201.01 - General (Author request: content was: "201 - Clearing '''201.01 - GENERAL''' Before beginning any construction operation, refer to subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/107%20Legal%20Rel,%20Resp%20to%20Public.pdf 107.15], Compli...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.04 - Weighing Materials (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.04 - WEIGHING MATERIALS''' Materials paid for by weight are required to be weighed on an approved scale system. There are permanent and portable scale systems. '''307...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.03 - Measurement and Payment (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.03 - MEASUREMENT AND PAYMENT''' Where trenching is required on both sides of the road, each side will be measured separately along the road centerline. When shoulders ...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.02 - Construction (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.02 - CONSTRUCTION''' '''307.02.1 Trenching''' When trenching is proposed, the operations will not be performed beyond the distance that will be backfilled and comp...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 301.03 - Measurement and Payment (Author request: content was: "301 - Subbase '''301.03 - MEASUREMENT AND PAYMENT''' Plan quantity plus or minus any known changes, if agreed to by the Engineer and Contractor, as a basis for final quantity for subbase, is encouraged whenever possi...)
- 15:24, 21 May 2014 Greenes2 talk contribs deleted page 305.01 - General (Author request: content was: "305 - HMA Base Crushing and Shaping '''305.01 - GENERAL''' '''305.01.1 Equipment''' The age of the equipment being used by the Contractor will have an effect on the amount of additional crushed material through ...)
- 15:24, 21 May 2014 Greenes2 talk contribs deleted page 307.01 - General (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.01 - GENERAL''' For all trenching, shoulder and approach operations that cannot be completed at the end of the day, the Contractor will place and maintain traffic contr...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 306.01 - General (Author request: content was: "306 - Aggregate Surface Course '''306.01 - GENERAL''' Compliance with density requirements for aggregate surface course construction is just as important as for aggregate base construction. Poor compactive efforts a...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.04 - Inspection (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.04 - INSPECTION''' The inspector should study the staging details very carefully. In situations where the road must be reopened for traffic, the rubblizing Contractor a...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.03 - Materials (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.03 - MATERIALS''' Filler aggregate will meet the Open-graded Aggregate 3G Specification, Section [http://mdotcf.state.mi.us/public/specbook/files/2012/902%20Aggregate.pd...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.02 - Equipment (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.02 - EQUIPMENT''' Equipment will be as listed in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/304%20Rubbilizing%20PCC%20Pavt.pdf 304.03] of the Stand...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.01 - Description (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.01 - DESCRIPTION''' This work will consist of rubblizing existing concrete pavements to be used as a base course for Hot Mix Asphalt (HMA) pavements.")
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 303.01 - General (Author request: content was: "303 - Open Graded Drainage Course '''303.01 - GENERAL''' The plans and proposal should be reviewed for notes or special provisions pertaining to open graded drainage course (OGDC). OGDC is intended to provide a stab...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.03 - Measurement and Payment (Author request: content was: "302 - Aggregate Base Courses '''302.03 - MEASUREMENT AND PAYMENT''' '''302.03.1 Payment by Square Yard (Square Meter)''' The following criteria should be adhered to with payment by the square yard (square meter)...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.02 - Construction (Author request: content was: "302 - Aggregate Base Courses '''302.02 - CONSTRUCTION''' '''302.02.1 Placing and Compacting''' Some cross sections are designed with a “step” in the subbase and a different aggregate depth in the shoulder ar...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.01 - Materials (Author request: content was: "302 - Aggregate Base Courses '''302.01 - MATERIALS''' Aggregates from dense graded series 21AA, 21A and 22A will be used for aggregate bases as per subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/902...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 301.02 - Construction (Author request: content was: "301 - Subbase '''301.02 - CONSTRUCTION''' '''301.02.1 Procedure''' The subbase will be placed on an approved subgrade surface that meets density and cross section requirements. Verify that subgrade has been exam...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 301.01 - Materials (Author request: content was: "301 - Subbase '''301.01 - MATERIALS''' Granular Material Class II will be used for constructing subbase.")
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 405.01 - General (Author request: content was: "405 - Pump Station Construction '''405.01- GENERAL''' Pump station construction is extremely specialized work. For this reason, if a pump station is to be constructed, Section [http://mdotcf.state.mi.us/public/specb...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.03 - Measurement (Author request: content was: "404 - Underdrain '''404.03 - MEASUREMENT''' The inspector must measure and record trench dimensions to ensure that specification widths and depths are being obtained. Underdrains, edgedrains and bank drains are meas...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.02 - Materials (Author request: content was: "404 - Underdrain '''404.02 - MATERIALS''' Subgrade underdrains are slotted or perforated drains placed near the edge of the traveled way for the purpose of lowering a high groundwater condition or draining a granular...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.01 - General (Author request: content was: "404 - Underdrain '''404.01 - GENERAL''' It is very difficult to determine the extent and volume of groundwater infiltration. Experienced Region Soils personnel usually make this determination. The inspector should ...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 403.04 - Adjusting Drainage Sturctures (Author request: content was: "403 - Drainage Structures '''403.04 - ADJUSTING DRAINAGE STRUCTURES''' Refer to subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/403%20Drainage%20Structures.pdf 403.04] of the Standard Specifications ...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 403.03 - Backfilling Drainage Sturctures (Author request: content was: "403 - Drainage Structures '''403.03 - BACKFILLING DRAINAGE STRUCTURES''' Backfilling is to be done in accordance with subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/401%20Pipe%20Culverts.pdf 401.03]...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 403.02 - Construction Methods (Author request: content was: "403 - Drainage Structures '''403.02. - CONSTRUCTION METHODS''' Excavation for drainage structures is to be performed in accordance with subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/206%20Exc,%20Ba...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 403.01 - General (Author request: content was: "403 - Drainage Structures '''403.01 - GENERAL''' Drainage structures refer to manholes, catch basins, leaching basins, inlets and drop inlets as detailed on Standard Plan R-1 series or on project plans. A drainage s...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.08 - Illicit Connections (Author request: content was: "402 - Storm Sewers '''402.08 - ILLICIT CONNECTIONS''' If unusual or suspicious connections to MDOT’s storm sewer system are found during a construction project (e.g. the presence of a sudsy discharge or oily discha...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.07 - Sewer Taps (Author request: content was: "402 - Storm Sewers '''402.07 - SEWER TAPS''' Connections to storm sewers owned by counties, municipalities or drain commissions shall be according to the regulations of the owner and according to the plans and specif...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.06 - Sewer Pipe Jacked in Place (Author request: content was: "402 - Storm Sewers '''402.06 - SEWER PIPE JACKED-IN-PLACE''' Follow the requirements of subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/401%20Pipe%20Culverts.pdf 401.03] of the Standard Specification...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.05 - Inspection After Installation (Author request: content was: "402 - Storm Sewers '''402.05 - INSPECTION AFTER INSTALLATION''' All of the general inspection points in the previous section on culverts apply to sewer pipes. '''402.05.1 Mandrel Testing''' If smooth lined corr...)
- 15:11, 21 May 2014 Greenes2 talk contribs deleted page 402.04 - Backfilling Sewer Pipe (Author request: content was: "402 - Storm Sewers '''402.04 - BACKFILLING SEWER PIPE''' Backfilling sewer pipe will be as specified in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/401%20Pipe%20Culverts.pdf 401.03] of the Standa...)
- 15:11, 21 May 2014 Greenes2 talk contribs deleted page 402.03 - Installation (Author request: content was: "402 - Storm Sewers '''402.03 - INSTALLATION''' Construction methods shall be according to the health and safety requirements in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/104%20Control%20of%20Wo...)
- 15:11, 21 May 2014 Greenes2 talk contribs deleted page 402.02 - Materials Inspection (Author request: content was: "402 - Storm Sewers '''402.02. - MATERIALS INSPECTION''' Some concrete storm sewer pipe does not contain reinforcement and therefore requires careful handling. Any pipe damaged in transit or by handling should be rej...)
- 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.06 - Pipe Culverts Jacked in Place (Author request: content was: "401 - Culverts '''401.06 - PIPE CULVERTS JACKED-IN-PLACE''' Pipe culverts jacked-in-place are used when it is desired to place a drainage feature without disturbing the roadbed or railroad above the pipe. The excava...)
- 15:10, 21 May 2014 Greenes2 talk contribs deleted page 402.01 - General (Author request: content was: "402 - Storm Sewers '''402.01 - GENERAL''' The inspector’s preliminary investigation should determine if the storm sewer is correctly staked and the storm sewer is the type, size and class called for in the plans, o...)
- 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.05 - Inspection after Installation (Author request: content was: "401 - Culverts '''401.05 - INSPECTION AFTER INSTALLATION''' Culvert sections showing signs of settlement or poor alignment shall, as directed by the Engineer, be taken up and relaid at the Contractor’s expense. An...)
- 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.04 - Backfilling Culverts (Author request: content was: "401 - Culverts '''401.04 - BACKFILLING CULVERTS''' It is important to backfill the pipe as soon as possible after placement so that runoff is directed through and not alongside the pipe. This will reduce the possibi...)