Deletion log
Jump to navigation
Jump to search
Below is a list of the most recent deletions.
(newest | oldest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.03 - Measurement and Payment (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.03 - MEASUREMENT AND PAYMENT''' Where trenching is required on both sides of the road, each side will be measured separately along the road centerline. When shoulders ...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.02 - Construction (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.02 - CONSTRUCTION''' '''307.02.1 Trenching''' When trenching is proposed, the operations will not be performed beyond the distance that will be backfilled and comp...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 301.03 - Measurement and Payment (Author request: content was: "301 - Subbase '''301.03 - MEASUREMENT AND PAYMENT''' Plan quantity plus or minus any known changes, if agreed to by the Engineer and Contractor, as a basis for final quantity for subbase, is encouraged whenever possi...)
- 15:24, 21 May 2014 Greenes2 talk contribs deleted page 305.01 - General (Author request: content was: "305 - HMA Base Crushing and Shaping '''305.01 - GENERAL''' '''305.01.1 Equipment''' The age of the equipment being used by the Contractor will have an effect on the amount of additional crushed material through ...)
- 15:24, 21 May 2014 Greenes2 talk contribs deleted page 307.01 - General (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.01 - GENERAL''' For all trenching, shoulder and approach operations that cannot be completed at the end of the day, the Contractor will place and maintain traffic contr...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 306.01 - General (Author request: content was: "306 - Aggregate Surface Course '''306.01 - GENERAL''' Compliance with density requirements for aggregate surface course construction is just as important as for aggregate base construction. Poor compactive efforts a...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.04 - Inspection (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.04 - INSPECTION''' The inspector should study the staging details very carefully. In situations where the road must be reopened for traffic, the rubblizing Contractor a...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.03 - Materials (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.03 - MATERIALS''' Filler aggregate will meet the Open-graded Aggregate 3G Specification, Section [http://mdotcf.state.mi.us/public/specbook/files/2012/902%20Aggregate.pd...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.02 - Equipment (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.02 - EQUIPMENT''' Equipment will be as listed in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/304%20Rubbilizing%20PCC%20Pavt.pdf 304.03] of the Stand...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.01 - Description (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.01 - DESCRIPTION''' This work will consist of rubblizing existing concrete pavements to be used as a base course for Hot Mix Asphalt (HMA) pavements.")
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 303.01 - General (Author request: content was: "303 - Open Graded Drainage Course '''303.01 - GENERAL''' The plans and proposal should be reviewed for notes or special provisions pertaining to open graded drainage course (OGDC). OGDC is intended to provide a stab...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.03 - Measurement and Payment (Author request: content was: "302 - Aggregate Base Courses '''302.03 - MEASUREMENT AND PAYMENT''' '''302.03.1 Payment by Square Yard (Square Meter)''' The following criteria should be adhered to with payment by the square yard (square meter)...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.02 - Construction (Author request: content was: "302 - Aggregate Base Courses '''302.02 - CONSTRUCTION''' '''302.02.1 Placing and Compacting''' Some cross sections are designed with a “step” in the subbase and a different aggregate depth in the shoulder ar...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.01 - Materials (Author request: content was: "302 - Aggregate Base Courses '''302.01 - MATERIALS''' Aggregates from dense graded series 21AA, 21A and 22A will be used for aggregate bases as per subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/902...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 301.02 - Construction (Author request: content was: "301 - Subbase '''301.02 - CONSTRUCTION''' '''301.02.1 Procedure''' The subbase will be placed on an approved subgrade surface that meets density and cross section requirements. Verify that subgrade has been exam...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 301.01 - Materials (Author request: content was: "301 - Subbase '''301.01 - MATERIALS''' Granular Material Class II will be used for constructing subbase.")
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 405.01 - General (Author request: content was: "405 - Pump Station Construction '''405.01- GENERAL''' Pump station construction is extremely specialized work. For this reason, if a pump station is to be constructed, Section [http://mdotcf.state.mi.us/public/specb...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.03 - Measurement (Author request: content was: "404 - Underdrain '''404.03 - MEASUREMENT''' The inspector must measure and record trench dimensions to ensure that specification widths and depths are being obtained. Underdrains, edgedrains and bank drains are meas...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.02 - Materials (Author request: content was: "404 - Underdrain '''404.02 - MATERIALS''' Subgrade underdrains are slotted or perforated drains placed near the edge of the traveled way for the purpose of lowering a high groundwater condition or draining a granular...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.01 - General (Author request: content was: "404 - Underdrain '''404.01 - GENERAL''' It is very difficult to determine the extent and volume of groundwater infiltration. Experienced Region Soils personnel usually make this determination. The inspector should ...)