Deletion log

Jump to navigation Jump to search

Below is a list of the most recent deletions.

Logs
(newest | oldest) View ( | ) (20 | 50 | 100 | 250 | 500)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.03 - Installation (Author request: content was: "401 - Culverts '''401.03 - INSTALLATION''' Culverts should be placed on suitable foundation material. Soft or spongy materials do not provide a firm bed for the pipe culvert. Excavation for culverts will be in acco...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.01 - General (Author request: content was: "401 - Culverts '''401.01 - GENERAL''' The inspector’s preliminary investigation should determine if the culvert is correctly staked and the pipe is the type, size and class as called for on the plans, or as allowed...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.02 - Materials Inspection (Author request: content was: "401 - Culverts '''401.02 - MATERIALS INSPECTION''' The inspector should visually inspect the culvert pipe periodically and should reject any damaged pipe, even if it is certified by the manufacturer, or is from teste...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 501.01 - Safety (Author request: content was: "501 - HMA Mixtures '''501.01 - SAFETY''' HMA mixtures consist of a blend of asphalt binder and aggregates mixed in an asphalt plant. When specified, special additives may be required. The old saying “Safety is Ev...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 715.06 - Coating System (Author request: content was: "'''715.06 - COATING SYSTEM''' Coating will be done in three steps consisting of an organic-rich primer, an intermediate coat and a urethane top coat. The ..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 712.03 - Measuring and Calibration (Author request: content was: "'''712.03 - MEASURING AND CALIBRATION''' Prior to casting any overlay mixture, the finishing machine will be passed over the deck to check for plan thickne..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:09, 21 May 2014 Greenes2 talk contribs deleted page 707.05 - Welding (Author request: content was: "'''707.05 - WELDING''' '''707.05.1 '''Field Welding''' Field welding and nondestructive testing will be performed according to subsection 707.03.D.10 of..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:09, 21 May 2014 Greenes2 talk contribs deleted page 707.04 - High Strength Steel Bolts (Author request: content was: "'''707.04 - HIGH STRENGTH STEEL BOLTS''' When heavy hexagon bolts and heavy semifinished hexagon nuts are used, a hardened washer must be assembled under t..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 707.03 - Erection (Author request: content was: "'''707.03 - ERECTION''' The first field erection operation is the placing of masonry plates. '''707.03.1 '''Masonry Plates''' These plates are pla..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 706.02 - Supersturcture (Author request: content was: "'''706.02 - SUPERSTRUCTURE''' '''706.02.1 '''Form Bracing''' The material to be used and the construction of ordinary forms is outlined clearly in the s..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 705.08 - Bearing Capacity (Author request: content was: "'''705.0''''''8 - BEARING CAPACITY''' '''705.08.1 '''Dynamic Formula''' Bearing capacity of foundation piling will be determined either by the stati..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 501.02 - Materials (Author request: content was: "501 - HMA Mixtures '''501.02 - MATERIALS''' It is very important to know what special provisions are contained in the proposal. Mixture types to be used and the sampling and testing procedures vary depending on the ...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 705.07 - Record Keeping (Author request: content was: "'''705.07 - RECORD-KEEPING''' '''705.07.1 '''Test Pile Records ''' Test pile records will be kept on Form 1157. <center></center> <center>File:F..." (and the only contributor was "[[Special:Contributions/Alcant...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 705.04 - Test Piles (Author request: content was: "'''705.04 - TEST PILES''' '''705.04.1 '''Test Piles ''' Will be driven prior to the regular piling so the results can be used as a guide in ordering..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 705.02 - Equipment (Author request: content was: "'''705.02 - EQUIPMENT''' '''705.02.1 '''Pile Hammers''' Vibratory equipment may be used for sticking piles, but not for advancing piles. Drop ham..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 703.04 - Mixture Requirements (Author request: content was: "'''703.04 - MIXTURE REQUIREMENTS''' The mixture proportions will be as shown in Table 703-1 of the Standard Specifications for Construction, reprinted here f..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:07, 21 May 2014 Greenes2 talk contribs deleted page 703.02 - Materials (Author request: content was: "'''703.02 - MATERIALS''' File:Table 703.02-1.jpg" (and the only contributor was "Alcantarj"))
  • 15:07, 21 May 2014 Greenes2 talk contribs deleted page 702.03 - Mixture Requirements (Author request: content was: "'''702.03 - MIXTURE REQUIREMENTS''' '''702.03.1 '''Standard Mortars and Grouts''' The cement and fine aggregates will be proportioned by weight for batc..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:07, 21 May 2014 Greenes2 talk contribs deleted page 702.02 - Materials (Author request: content was: "'''702.02 - MATERIALS''' File:Table 702.02-1.jpg Mortars and grouts: - may be remixed but will not be retempered or used after they have begun to s..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:07, 21 May 2014 Greenes2 talk contribs deleted page 701.07 - Sampling and Testing Concrete (Author request: content was: "'''701.07 - SAMPLING AND TESTING CONCRETE''' Samples will be taken according to MTM 207. '''701.07.1 '''Determining Air Content''' Freshly Mixed Concret..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:07, 21 May 2014 Greenes2 talk contribs deleted page 501.03 - Hot Mix Plants (Author request: content was: "501 - HMA Mixtures '''501.03 - HOT MIX PLANTS''' HMA mixtures being supplied to MDOT projects must be produced at a certified facility. Plants are certified in accordance with the MDOT Manual for the Certification o...)
  • 15:07, 21 May 2014 Greenes2 talk contribs deleted page 701.05 - Concrete Mixture Requirements (Author request: content was: "'''701.05 - CONCRETE MIXTURE REQUIREMENTS''' The Contractor is responsible for determining the concrete mixture proportions (mix design) on projects contai..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:07, 21 May 2014 Greenes2 talk contribs deleted page 701.04 - Ready-Mixed Concrete (Author request: content was: "'''701.04 - READY-MIXED CONCRETE''' Ready mixed concrete is batched and delivered as central mixed or truck mixed concrete. '''701.04.1 '''Types of Concr..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:07, 21 May 2014 Greenes2 talk contribs deleted page 701.03 - Stockpiling Aggregates (Vandalism: content was: "'''701.03 - STOCKPILING AGGREGATE''' The following actions will be adhered to when furnishing and handling aggregate: Fine and Coarse - Will be furnishe..." (and the only contributor was "[[Special:Contributions/Alcantarj...)
  • 15:07, 21 May 2014 Greenes2 talk contribs deleted page 715.05 - Steel Preperation (Author request: content was: "'''715.05 - STEEL PREPARATION''' '''715.05.1 '''Cleaning Requirements''' The top of the bottom flange will be scraped to remove accumulated dirt and..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:07, 21 May 2014 Greenes2 talk contribs deleted page 715.04 - Type 4-Field Painted Steel (Author request: content was: "'''715.04 - TYPE 4 - FIELD PAINTED STEEL''' '''715.04.1 '''Requirements''' Abrasive blast cleaning of existing steel structures requires environment..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:05, 21 May 2014 Greenes2 talk contribs deleted page 715.03 - Type 4S-Shop Painted Steel (Author request: content was: "'''715.03 - TYPE 4S - SHOP PAINTED STEEL''' '''715.03.1 '''Requirements''' See [http://mdotcf.state.mi.us/public/specbook/files/2012/716 Shop Clean,..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:05, 21 May 2014 Greenes2 talk contribs deleted page 715.02 - Health and Safety (Author request: content was: "'''715.02 - HEALTH AND SAFETY''' Exposure assessments, exposure monitoring, hygiene facilities and training involved with the removal of lead-based coating..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:05, 21 May 2014 Greenes2 talk contribs deleted page 715.01 - General (Author request: content was: "'''715.01 - GENERAL''' MDOT has two standard painting systems. New structural steel is completely shop painted with a three-coat system, referred to as Ty..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:05, 21 May 2014 Greenes2 talk contribs deleted page 713.09 - Heat Straightening Damaged Structural Steel (Author request: content was: "'''713.09 - HEAT STRAIGHTENING DAMAGED STRUCTURAL STEEL''' See [http://mdotcf.state.mi.us/public/specbook/files/2012/713 Br Rehab - Steel.pdf Section 713] ..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:05, 21 May 2014 Greenes2 talk contribs deleted page 713.08 - Sealing the Perimeter of Beam Plates (Author request: content was: "'''713.08 - SEALING THE PERIMETER OF BEAM PLATES''' The sealant shall be applied around the perimeter of bolted or riveted plates or angle on a steel beam ..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:05, 21 May 2014 Greenes2 talk contribs deleted page 713.07 - Retrofit Structural Steel (Author request: content was: "'''713.07 - RETROFIT STRUCTURAL STEEL''' See [http://mdotcf.state.mi.us/public/specbook/files/2012/713 Br Rehab - Steel.pdf Section 713] of the Standard Sp..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:05, 21 May 2014 Greenes2 talk contribs deleted page 713.06 - Bearing Stiffeners at Temporary Supports (Author request: content was: "'''713.06 - BEARING STIFFENERS AT TEMPORARY SUPPORTS''' See [http://mdotcf.state.mi.us/public/specbook/files/2012/713 Br Rehab - Steel.pdf Section 713] of ..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:05, 21 May 2014 Greenes2 talk contribs deleted page 713.05 - Pin and Hanger Replacement (Author request: content was: "'''713.05 - PIN AND HANGER REPLACEMENT''' Measurement and Removal of Existing Hangar Assemblies - see [http://mdotcf.state.mi.us/public/specbook/files/2012..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:56, 21 May 2014 Greenes2 talk contribs deleted page 713.04 - Column Type Supports and Suspension Type Supports (Author request: content was: "'''713.04 - COLUMN-TYPE SUPPORTS AND SUSPENSION-TYPE SUPPORTS''' See [http://mdotcf.state.mi.us/public/specbook/files/2012/713 Br Rehab - Steel.pdf Section..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:56, 21 May 2014 Greenes2 talk contribs deleted page 713.03 - Temporary Supports for Girder Ends (Author request: content was: "'''713.03 - TEMPORARY SUPPORTS FOR GIRDER ENDS''' Temporary supports for girder ends may either be as shown on the plans or an alternate design proposed by..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:56, 21 May 2014 Greenes2 talk contribs deleted page 713.02 - Shop Plans (Author request: content was: "'''713.02 - SHOP PLANS''' See Section 707 of this manual." (and the only contributor was "Alcantarj"))
  • 14:56, 21 May 2014 Greenes2 talk contribs deleted page 713.01 - Furnishing and Fabricating Sturctural Steel (Author request: content was: "'''713.01 - FURNISHING AND FABRICATING STRUCTURAL STEEL''' Furnishing and fabricating structural steel additions and replacements for existing structures a..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:55, 21 May 2014 Greenes2 talk contribs deleted page 712.10 - Substurcture Repair (Author request: content was: "'''712.10 - SUBSTRUCTURE REPAIR''' Areas to be patched or filled will be saw cut to a minimum edge depth of 1/2 inch (15 mm), and the concrete unsound..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:55, 21 May 2014 Greenes2 talk contribs deleted page 501.04 - Pre-Production Meeting (Author request: content was: "501 - HMA Mixtures '''501.04 - PRE-PRODUCTION MEETING''' A pre-production meeting should be held before work commences on a project. During this meeting, the overall goals and expectations are set for the project. ...)
  • 14:55, 21 May 2014 Greenes2 talk contribs deleted page 712.09 - Mixing, Placing, Finishing, and Curing Concrete Patches (Author request: content was: "'''712.09 - MIXING, PLACING, FINISHING, AND CURING CONCRETE PATCHES''' See [http://mdotcf.state.mi.us/public/specbook/files/2012/712 Br Rehab - Concrete.pd..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:55, 21 May 2014 Greenes2 talk contribs deleted page 712.08 - Weather Limitations (Author request: content was: "'''712.08 - WEATHER LIMITATIONS''' See [http://mdotcf.state.mi.us/public/specbook/files/2012/712 Br Rehab - Concrete.pdf Section 712] of the Standard Speci..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:55, 21 May 2014 Greenes2 talk contribs deleted page 712.07 - Testing of Silica Fume Concrete (Author request: content was: "'''712.07 - TESTING OF SILICA FUME CONCRETE''' Slump and air tests will be taken on the mixture throughout the pour." (and the only contributor was "Alcantarj"))
  • 14:54, 21 May 2014 Greenes2 talk contribs deleted page 501.05 - Plant Procedures (Author request: content was: "501 - HMA Mixtures '''501.05 - PLANT PROCEDURES''' Every HMA paving project must have an approved mix design for each mixture used on the project. The design may have been approved for another project; however, a JM...)
  • 14:54, 21 May 2014 Greenes2 talk contribs deleted page 712.06 - Mixing, Placing, Finishing, and Curing of SFMC Concrete Overlays (Author request: content was: "'''712.06 - MIXING, PLACING, FINISHING, AND CURING SFMC CONCRETE OVERLAYS''' See [http://mdotcf.state.mi.us/public/specbook/files/2012/712 Br Rehab - Concr..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:54, 21 May 2014 Greenes2 talk contribs deleted page 712.05 - Testing of Latex Modified Concrete (LMC) (Author request: content was: "'''712.05 - TESTING OF LATEX MODIFIED CONCRETE (LMC)''' Slump, air and yield tests will be run on all trucks the first time around. Random testing will be..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:54, 21 May 2014 Greenes2 talk contribs deleted page 712.04 - Placing Latex Modified Concrete (LMC) (Author request: content was: "'''712.04 - PLACING LATEX MODIFIED CONCRETE (LMC)''' The deck must be thoroughly wetted one hour before the pour. All freestanding water should be blown o..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:54, 21 May 2014 Greenes2 talk contribs deleted page 712.02 - Equipment for Hydro-Demolishing (Author request: content was: "'''712.02 - EQUIPMENT FOR HYDRO-DEMOLISHING''' Equipment Description - see [http://mdotcf.state.mi.us/public/specbook/files/2012/712 Br Rehab - Concrete.pd..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:54, 21 May 2014 Greenes2 talk contribs deleted page 712.01 - Bridge Deck Overlays (Author request: content was: "'''712.01 - BRIDGE DECK OVERLAYS''' Existing deck elevations will be taken to establish grades for the overlay course. Preparation of new decks for the ..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:54, 21 May 2014 Greenes2 talk contribs deleted page 501.06 - Documentation (Author request: content was: "501 - HMA Mixtures '''501.06 - DOCUMENTATION''' It is required that accurate and complete records be kept for all paving projects. This is true for both the Project Engineer and his staff and for the Contractor’s ...)
  • 14:54, 21 May 2014 Greenes2 talk contribs deleted page 710.01 - General (Author request: content was: "'''710.01 - GENERAL''' Joint waterproofing is done just before placing backfill against the joint to be waterproofed. The membrane has a tendency to sag o..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:54, 21 May 2014 Greenes2 talk contribs deleted page 708.01 - General (Author request: content was: "'''708.01 - GENERAL''' Precast concrete structural members are cast in a mold or form at some location other than its final position in the structure. The..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:54, 21 May 2014 Greenes2 talk contribs deleted page 707.02 - Delivery Checklist (Author request: content was: "'''707.02 - DELIVERY CHECKLIST''' Upon delivery of structural steel, the inspector should check for the shop inspector's "approved for use" stamp on all pr..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:53, 21 May 2014 Greenes2 talk contribs deleted page 707.01 - General (Author request: content was: "'''707.01 - GENERAL''' At the time of delivery, the Construction and Technology progress inspection reports should be reviewed for any corrective work that..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:53, 21 May 2014 Greenes2 talk contribs deleted page 706.05 - Concrete Curing (Author request: content was: "'''706.05 - CONCRETE CURING''' Curing is one of the most important phases of any concrete operation. Concrete curing aids in the development of strength..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:53, 21 May 2014 Greenes2 talk contribs deleted page 706.04 - Joints (Author request: content was: "'''706.04 - JOINTS''' Joints are a source of considerable trouble. It is impossible to be too careful when placing these joints. It is extremely importan..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:53, 21 May 2014 Greenes2 talk contribs deleted page 706.03 - Substurcture (Author request: content was: "'''706.03 - SUBSTRUCTURE''' All steel reinforcement should be accurately placed in the position shown on the plans and firmly held during the placing of co..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:52, 21 May 2014 Greenes2 talk contribs deleted page 501.07 - Measurement and Payment (Author request: content was: "501 - HMA Mixtures '''501.07 - MEASUREMENT AND PAYMENT''' The Contractor will be paid for conducting quality assurance testing. Included in the payment are: the equipment and personnel needed to perform the required...)
  • 14:52, 21 May 2014 Greenes2 talk contribs deleted page 706.01 - General (Author request: content was: "'''706.01 - GENERAL FORMING''' The standard specifications contain details for form construction, covering material and size, stud and waler spacings, requ..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:52, 21 May 2014 Greenes2 talk contribs deleted page 705.06 - Splicing (Author request: content was: "'''705.06 - SPLICING''' Steel piles and steel pile shells may be furnished in full length sections or the pile shells may be spliced according to the splic..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:52, 21 May 2014 Greenes2 talk contribs deleted page 705.05 - Production Piles (Author request: content was: "'''705.05 - PRODUCTION PILES''' '''705.05.1 '''Recording Production Piles ''' Only the original length, splice lengths, final penetration bearing an..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:50, 21 May 2014 Greenes2 talk contribs deleted page 705.03 - Construction Inspection (Author request: content was: "'''705.03 - CONSTRUCTION INSPECTION''' Prior to the start of driving and during the operation, check all of the following: Excavation - The excavation w..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:50, 21 May 2014 Greenes2 talk contribs deleted page 701.02 - Materials (Author request: content was: "'''701.02.2 '''Stone Sand''' Stone sand 2SS will be permitted only in concrete to be used in structure concrete not exposed to vehicular traffic. ''..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:50, 21 May 2014 Greenes2 talk contribs deleted page 703.01 - General (Author request: content was: "'''703.01 - GENERAL''' Mortar and concrete patching, repair and resurfacing mixtures will be combined in proportions specified for the various types. Unless..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:50, 21 May 2014 Greenes2 talk contribs deleted page 703.03 - Equipment (Author request: content was: "'''703.03 - EQUIPMENT''' Equipment for producing concrete by volumetric batching and continuous mixing will conform to ASTM C 685. The Contractor will be ..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:50, 21 May 2014 Greenes2 talk contribs deleted page 502.01 - Materials (Author request: content was: "502 - HMA Construction Practices '''502.01 - MATERIALS''' HMA types will be as specified on the plans or in the proposal. Bond coat, also referred to as tack coat, is an asphalt emulsion. This is a certified produc...)
  • 14:50, 21 May 2014 Greenes2 talk contribs deleted page 705.01 - General (Author request: content was: "'''705.01 - GENERAL''' Foundation piles are usually steel H sections or cast-in-place (CIP) concrete in steel shells. Fluted shells are usually an allow..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:50, 21 May 2014 Greenes2 talk contribs deleted page 704.02 - Cofferdams (Author request: content was: "'''704.02 - COFFERDAMS''' '''704.02.1 '''Definition''' A cofferdam is a substantially watertight enclosure which will permit substructure construction a..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:50, 21 May 2014 Greenes2 talk contribs deleted page 704.01 - Steel Piling (Author request: content was: "'''704.01 - STEEL PILING''' '''704.01.1 '''Sheet Piling''' Steel sheet piling may be: - permanent. - temporary. - part of a cofferdam. Sheet pilin..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:50, 21 May 2014 Greenes2 talk contribs deleted page 702.01 - General (Author request: content was: "'''702.01 - GENERAL''' Mortar and grout is a mixture of: - cement. - fine aggregate (except for expansive grout). - concrete admixtures (when speci..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:50, 21 May 2014 Greenes2 talk contribs deleted page 701.06 - Admixtures (Author request: content was: "'''701.06 - ADMIXTURES ''' Changes in the amount of air-entrained admixture used should be carefully monitored. '''701.06.1 '''Air-Entrained Admixtures''..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:48, 21 May 2014 Greenes2 talk contribs deleted page 701.01 - General (Author request: content was: "'''701.01 - GENERAL''' Unless otherwise specified, air entrained concrete will be required for structural work. Defoaming (air-detraining) admixtures wi..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.02 - Equipment (Author request: content was: "502 - HMA Construction Practices '''502.02 - EQUIPMENT''' The Contractor must provide all equipment required to prepare the base and place the HMA in accordance with the plans and specifications. This equipment must...)
  • 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.04 - Adjusting Drainage Structures (Author request: content was: "502 - HMA Construction Practices '''502.04 - ADJUSTING DRAINAGE STRUCTURES''' One of the greatest contributors to a poor ride on an urban project is the improper adjustment of manholes. Refer to Section 403 of this ...)
  • 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.05 - Wedging (Author request: content was: "502 - HMA Construction Practices '''502.05 - WEDGING''' Some old surfaces may need to be leveled or smoothed before the new surface is placed. This requires a HMA layer of varying thickness to be placed and is refer...)
  • 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.06 - Bond Coat (Author request: content was: "502 - HMA Construction Practices '''502.06 - BOND COAT''' The bond coat, also called the tack coat, consists of an asphaltic emulsion applied to an existing surface to promote adhesion between the old surface and the...)
  • 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.07 - Placing HMA Mixture (Author request: content was: "502 - HMA Construction Practices '''502.07 - PLACING HMA MIXTURE''' It is the Contractor’s responsibility to uniformly place the HMA mixture to the specified grade and thickness. It is the MDOT inspector’s respo...)
  • 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.08 - Joints (Author request: content was: "502 - HMA Construction Practices '''502.08 - JOINTS''' Attention needs to be directed toward joints more than any other phase of HMA construction. The subject of joints includes longitudinal joints and transverse jo...)
  • 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.09 - Compaction (Author request: content was: "502 - HMA Construction Practices '''502.09 - COMPACTION''' Compaction is the single most important factor that affects the ultimate performance of a hot mix asphalt pavement. Adequate compaction of the mix increases...)
  • 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.10 - Coring (Author request: content was: "502 - HMA Construction Practices '''502.10 - CORING''' Once the Contractor has finished the rolling operation, the inspector will identify the locations where the density cores will be taken; these locations are rand...)
  • 14:48, 21 May 2014 Greenes2 talk contribs deleted page 502.11 - Surface Defects (Author request: content was: "502 - HMA Construction Practices '''502.11 - SURFACE DEFECTS''' Surface defects are problems that occur in the asphalt mixture during, or soon after, the lay down and compaction process. These defects can be divided...)
  • 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.12 - Surface Tolerances (Author request: content was: "502 - HMA Construction Practices '''502.12 - SURFACE TOLERANCE''' The importance of staying within the surface tolerance for smoothness cannot be overemphasized. Irregularities in the lower courses can usually be co...)
  • 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.13 - Payment (Author request: content was: "502 - HMA Construction Practices '''502.13 - PAYMENT''' The amount bid for HMA may be adjusted. These adjustments are based upon the mixture acceptance test results and the pavement in-place density, and are explain...)
  • 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.14 - Paving Inspector's Checklist (Author request: content was: "502 - HMA Construction Practices '''502.14 - PAVING INSPECTOR’S CHECKLIST''' Things to look for during the paving operation include: {| class="wikitable" |- | colspan="2" | <center>'''Trucking'''</center> |- | <c...)
  • 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.15 - Mat Troubleshooting Guide (Author request: content was: "502 - HMA Construction Practices '''502.15 - MAT TROUBLESHOOTING GUIDE''' {| class="wikitable" |- | <center>'''Cause'''</center> | <center>'''Fix'''</center> |- | colspan="2" | <center>'''Mat Tearing at Full Width'...)
  • 14:47, 21 May 2014 Greenes2 talk contribs deleted page 502.16 - MDOT Standard Practice for Random Sampling of HMA Materials (Author request: content was: "502 - HMA Construction Practices '''502.16 - MDOT STANDARD PRACTICE FOR RANDOM SAMPLING OF HMA MATERIALS''' '''502.16.1 SCOPE''' This practice covers the determination of random locations at which samples of cons...)
  • 14:46, 21 May 2014 Greenes2 talk contribs deleted page 502.17 - Temporary Patching with HMA Mixtures (Author request: content was: "502 - HMA Construction Practices '''502.17 - TEMPORARY PATCHING WITH HMA MIXTURE''' '''502.17.1''' The HMA mixture used for patching should be the top course mixture called for on the plans, or in the proposal. ...)
  • 14:46, 21 May 2014 Greenes2 talk contribs deleted page 502.18 - Glossary of Paving Terms (Author request: content was: "502 - HMA Construction Practices '''502.18 - GLOSSARY OF PAVING TERMINOLOGY''' * AGGREGATE - Various hard, inert materials such as sand, gravel, pebbles, etc., used as the bulk material in asphaltic mixes. * ANGLE O...)
  • 14:46, 21 May 2014 Greenes2 talk contribs deleted page 505 - Overband Crack Seal (Author request: content was: "505 - Overband Crack Seal - Reserved -")
  • 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.01 - Materials (Author request: content was: "506 - Slurry Seal '''506.01 - MATERIALS''' The asphalt emulsion must be certified and supplied by an approved supplier. The mix design and quality control testing is the responsibility of the Contractor. The MDOT i...)
  • 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.02 - Equipment (Author request: content was: "506 - Slurry Seal '''506.02 - EQUIPMENT''' Equipment shall be safe, environmentally acceptable and capable of producing a specification product. A typical product will have some, or all, of the following equipment o...)
  • 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.03 - Pre-Paving Meeting (Author request: content was: "506 - Slurry Seal '''506.03 - PRE-PAVING MEETING''' A pre-paving conference between the Contractor and the Engineer should be held on site prior to beginning work. {| class="wikitable" |- | colspan="2" | <center>'...)
  • 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.04 - Construction (Author request: content was: "506 - Slurry Seal '''506.04 - CONSTRUCTION''' '''506.04.1 Site Preparation''' All loose materials, vegetation, dirt, mud and other objectionable material shall be removed from the surface prior to placing the mi...)
  • 14:43, 21 May 2014 Greenes2 talk contribs deleted page 506.05 - Delayed Acceptance (Author request: content was: "506 - Slurry Seal '''506.05 - DELAYED ACCEPTANCE''' The Contractor is responsible for placing a uniform product. This type of work has a 30 day delayed acceptance procedure so that any major problems will be correct...)
  • 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.01 - Materials (Author request: content was: "507 - Micro Surfacing '''507.01 - MATERIALS''' Micro-surfacing should be used only for filling rutted pavements. All other applications are inappropriate. However, if called for on the plans or proposal, the follow...)
  • 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.02 - Equipment (Author request: content was: "507 - Micro Surfacing '''507.02 - EQUIPMENT''' '''507.02.1 Mixing Machine''' The mixing machine shall be equipped with a positive connection conveyer belt aggregate delivery system and an inter-connected positiv...)
  • 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.03 - Pre-Paving Meeting (Author request: content was: "507 - Micro Surfacing '''507.03 - PRE-PAVING MEETING''' A pre-paving conference between the Contractor and the Engineer should be held on site prior to beginning work. {| class="wikitable" |- | colspan="2" | <cent...)
  • 14:43, 21 May 2014 Greenes2 talk contribs deleted page 507.04 - Construction (Author request: content was: "507 - Micro Surfacing '''507.04 - CONSTRUCTION''' Before placing the mixture, the Contractor shall thoroughly clean the existing surface of all loose materials, vegetation, dirt, dust, mud and other objectionable mat...)
  • 14:42, 21 May 2014 Greenes2 talk contribs deleted page 507.05 - Delayed Acceptance (Author request: content was: "507 - Micro Surfacing '''507.05 - DELAYED ACCEPTANCE''' The Contractor is responsible for placing a uniform product. This type of work has a 30 day delayed acceptance procedure so that any major problems will be cor...)
  • 14:42, 21 May 2014 Greenes2 talk contribs deleted page 508.02 - Equipment (Author request: content was: "508 - Chip Seals '''508.02 - EQUIPMENT''' Equipment shall be safe, environmentally acceptable and capable of producing a product that meets the specifications. The pressure distributor shall meet the same requiremen...)
(newest | oldest) View ( | ) (20 | 50 | 100 | 250 | 500)