Deletion log

Jump to navigation Jump to search

Below is a list of the most recent deletions.

Logs
(newest | oldest) View ( | ) (20 | 50 | 100 | 250 | 500)
  • 15:23, 21 May 2014 Greenes2 talk contribs deleted page 306.01 - General (Author request: content was: "306 - Aggregate Surface Course '''306.01 - GENERAL''' Compliance with density requirements for aggregate surface course construction is just as important as for aggregate base construction. Poor compactive efforts a...)
  • 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.04 - Inspection (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.04 - INSPECTION''' The inspector should study the staging details very carefully. In situations where the road must be reopened for traffic, the rubblizing Contractor a...)
  • 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.03 - Materials (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.03 - MATERIALS''' Filler aggregate will meet the Open-graded Aggregate 3G Specification, Section [http://mdotcf.state.mi.us/public/specbook/files/2012/902%20Aggregate.pd...)
  • 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.02 - Equipment (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.02 - EQUIPMENT''' Equipment will be as listed in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/304%20Rubbilizing%20PCC%20Pavt.pdf 304.03] of the Stand...)
  • 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.01 - Description (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.01 - DESCRIPTION''' This work will consist of rubblizing existing concrete pavements to be used as a base course for Hot Mix Asphalt (HMA) pavements.")
  • 15:23, 21 May 2014 Greenes2 talk contribs deleted page 303.01 - General (Author request: content was: "303 - Open Graded Drainage Course '''303.01 - GENERAL''' The plans and proposal should be reviewed for notes or special provisions pertaining to open graded drainage course (OGDC). OGDC is intended to provide a stab...)
  • 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.03 - Measurement and Payment (Author request: content was: "302 - Aggregate Base Courses '''302.03 - MEASUREMENT AND PAYMENT''' '''302.03.1 Payment by Square Yard (Square Meter)''' The following criteria should be adhered to with payment by the square yard (square meter)...)
  • 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.02 - Construction (Author request: content was: "302 - Aggregate Base Courses '''302.02 - CONSTRUCTION''' '''302.02.1 Placing and Compacting''' Some cross sections are designed with a “step” in the subbase and a different aggregate depth in the shoulder ar...)
  • 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.01 - Materials (Author request: content was: "302 - Aggregate Base Courses '''302.01 - MATERIALS''' Aggregates from dense graded series 21AA, 21A and 22A will be used for aggregate bases as per subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/902...)
  • 15:22, 21 May 2014 Greenes2 talk contribs deleted page 301.02 - Construction (Author request: content was: "301 - Subbase '''301.02 - CONSTRUCTION''' '''301.02.1 Procedure''' The subbase will be placed on an approved subgrade surface that meets density and cross section requirements. Verify that subgrade has been exam...)
  • 15:22, 21 May 2014 Greenes2 talk contribs deleted page 301.01 - Materials (Author request: content was: "301 - Subbase '''301.01 - MATERIALS''' Granular Material Class II will be used for constructing subbase.")
  • 15:22, 21 May 2014 Greenes2 talk contribs deleted page 405.01 - General (Author request: content was: "405 - Pump Station Construction '''405.01- GENERAL''' Pump station construction is extremely specialized work. For this reason, if a pump station is to be constructed, Section [http://mdotcf.state.mi.us/public/specb...)
  • 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.03 - Measurement (Author request: content was: "404 - Underdrain '''404.03 - MEASUREMENT''' The inspector must measure and record trench dimensions to ensure that specification widths and depths are being obtained. Underdrains, edgedrains and bank drains are meas...)
  • 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.02 - Materials (Author request: content was: "404 - Underdrain '''404.02 - MATERIALS''' Subgrade underdrains are slotted or perforated drains placed near the edge of the traveled way for the purpose of lowering a high groundwater condition or draining a granular...)
  • 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.01 - General (Author request: content was: "404 - Underdrain '''404.01 - GENERAL''' It is very difficult to determine the extent and volume of groundwater infiltration. Experienced Region Soils personnel usually make this determination. The inspector should ...)
  • 15:22, 21 May 2014 Greenes2 talk contribs deleted page 403.04 - Adjusting Drainage Sturctures (Author request: content was: "403 - Drainage Structures '''403.04 - ADJUSTING DRAINAGE STRUCTURES''' Refer to subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/403%20Drainage%20Structures.pdf 403.04] of the Standard Specifications ...)
  • 15:12, 21 May 2014 Greenes2 talk contribs deleted page 403.03 - Backfilling Drainage Sturctures (Author request: content was: "403 - Drainage Structures '''403.03 - BACKFILLING DRAINAGE STRUCTURES''' Backfilling is to be done in accordance with subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/401%20Pipe%20Culverts.pdf 401.03]...)
  • 15:12, 21 May 2014 Greenes2 talk contribs deleted page 403.02 - Construction Methods (Author request: content was: "403 - Drainage Structures '''403.02. - CONSTRUCTION METHODS''' Excavation for drainage structures is to be performed in accordance with subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/206%20Exc,%20Ba...)
  • 15:12, 21 May 2014 Greenes2 talk contribs deleted page 403.01 - General (Author request: content was: "403 - Drainage Structures '''403.01 - GENERAL''' Drainage structures refer to manholes, catch basins, leaching basins, inlets and drop inlets as detailed on Standard Plan R-1 series or on project plans. A drainage s...)
  • 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.08 - Illicit Connections (Author request: content was: "402 - Storm Sewers '''402.08 - ILLICIT CONNECTIONS''' If unusual or suspicious connections to MDOT’s storm sewer system are found during a construction project (e.g. the presence of a sudsy discharge or oily discha...)
  • 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.07 - Sewer Taps (Author request: content was: "402 - Storm Sewers '''402.07 - SEWER TAPS''' Connections to storm sewers owned by counties, municipalities or drain commissions shall be according to the regulations of the owner and according to the plans and specif...)
  • 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.06 - Sewer Pipe Jacked in Place (Author request: content was: "402 - Storm Sewers '''402.06 - SEWER PIPE JACKED-IN-PLACE''' Follow the requirements of subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/401%20Pipe%20Culverts.pdf 401.03] of the Standard Specification...)
  • 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.05 - Inspection After Installation (Author request: content was: "402 - Storm Sewers '''402.05 - INSPECTION AFTER INSTALLATION''' All of the general inspection points in the previous section on culverts apply to sewer pipes. '''402.05.1 Mandrel Testing''' If smooth lined corr...)
  • 15:11, 21 May 2014 Greenes2 talk contribs deleted page 402.04 - Backfilling Sewer Pipe (Author request: content was: "402 - Storm Sewers '''402.04 - BACKFILLING SEWER PIPE''' Backfilling sewer pipe will be as specified in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/401%20Pipe%20Culverts.pdf 401.03] of the Standa...)
  • 15:11, 21 May 2014 Greenes2 talk contribs deleted page 402.03 - Installation (Author request: content was: "402 - Storm Sewers '''402.03 - INSTALLATION''' Construction methods shall be according to the health and safety requirements in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/104%20Control%20of%20Wo...)
  • 15:11, 21 May 2014 Greenes2 talk contribs deleted page 402.02 - Materials Inspection (Author request: content was: "402 - Storm Sewers '''402.02. - MATERIALS INSPECTION''' Some concrete storm sewer pipe does not contain reinforcement and therefore requires careful handling. Any pipe damaged in transit or by handling should be rej...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.06 - Pipe Culverts Jacked in Place (Author request: content was: "401 - Culverts '''401.06 - PIPE CULVERTS JACKED-IN-PLACE''' Pipe culverts jacked-in-place are used when it is desired to place a drainage feature without disturbing the roadbed or railroad above the pipe. The excava...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 402.01 - General (Author request: content was: "402 - Storm Sewers '''402.01 - GENERAL''' The inspector’s preliminary investigation should determine if the storm sewer is correctly staked and the storm sewer is the type, size and class called for in the plans, o...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.05 - Inspection after Installation (Author request: content was: "401 - Culverts '''401.05 - INSPECTION AFTER INSTALLATION''' Culvert sections showing signs of settlement or poor alignment shall, as directed by the Engineer, be taken up and relaid at the Contractor’s expense. An...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.04 - Backfilling Culverts (Author request: content was: "401 - Culverts '''401.04 - BACKFILLING CULVERTS''' It is important to backfill the pipe as soon as possible after placement so that runoff is directed through and not alongside the pipe. This will reduce the possibi...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.03 - Installation (Author request: content was: "401 - Culverts '''401.03 - INSTALLATION''' Culverts should be placed on suitable foundation material. Soft or spongy materials do not provide a firm bed for the pipe culvert. Excavation for culverts will be in acco...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.01 - General (Author request: content was: "401 - Culverts '''401.01 - GENERAL''' The inspector’s preliminary investigation should determine if the culvert is correctly staked and the pipe is the type, size and class as called for on the plans, or as allowed...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.02 - Materials Inspection (Author request: content was: "401 - Culverts '''401.02 - MATERIALS INSPECTION''' The inspector should visually inspect the culvert pipe periodically and should reject any damaged pipe, even if it is certified by the manufacturer, or is from teste...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 501.01 - Safety (Author request: content was: "501 - HMA Mixtures '''501.01 - SAFETY''' HMA mixtures consist of a blend of asphalt binder and aggregates mixed in an asphalt plant. When specified, special additives may be required. The old saying “Safety is Ev...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 715.06 - Coating System (Author request: content was: "'''715.06 - COATING SYSTEM''' Coating will be done in three steps consisting of an organic-rich primer, an intermediate coat and a urethane top coat. The ..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:10, 21 May 2014 Greenes2 talk contribs deleted page 712.03 - Measuring and Calibration (Author request: content was: "'''712.03 - MEASURING AND CALIBRATION''' Prior to casting any overlay mixture, the finishing machine will be passed over the deck to check for plan thickne..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:09, 21 May 2014 Greenes2 talk contribs deleted page 707.05 - Welding (Author request: content was: "'''707.05 - WELDING''' '''707.05.1 '''Field Welding''' Field welding and nondestructive testing will be performed according to subsection 707.03.D.10 of..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:09, 21 May 2014 Greenes2 talk contribs deleted page 707.04 - High Strength Steel Bolts (Author request: content was: "'''707.04 - HIGH STRENGTH STEEL BOLTS''' When heavy hexagon bolts and heavy semifinished hexagon nuts are used, a hardened washer must be assembled under t..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 707.03 - Erection (Author request: content was: "'''707.03 - ERECTION''' The first field erection operation is the placing of masonry plates. '''707.03.1 '''Masonry Plates''' These plates are pla..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 706.02 - Supersturcture (Author request: content was: "'''706.02 - SUPERSTRUCTURE''' '''706.02.1 '''Form Bracing''' The material to be used and the construction of ordinary forms is outlined clearly in the s..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 705.08 - Bearing Capacity (Author request: content was: "'''705.0''''''8 - BEARING CAPACITY''' '''705.08.1 '''Dynamic Formula''' Bearing capacity of foundation piling will be determined either by the stati..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 501.02 - Materials (Author request: content was: "501 - HMA Mixtures '''501.02 - MATERIALS''' It is very important to know what special provisions are contained in the proposal. Mixture types to be used and the sampling and testing procedures vary depending on the ...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 705.07 - Record Keeping (Author request: content was: "'''705.07 - RECORD-KEEPING''' '''705.07.1 '''Test Pile Records ''' Test pile records will be kept on Form 1157. <center></center> <center>File:F..." (and the only contributor was "[[Special:Contributions/Alcant...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 705.04 - Test Piles (Author request: content was: "'''705.04 - TEST PILES''' '''705.04.1 '''Test Piles ''' Will be driven prior to the regular piling so the results can be used as a guide in ordering..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 705.02 - Equipment (Author request: content was: "'''705.02 - EQUIPMENT''' '''705.02.1 '''Pile Hammers''' Vibratory equipment may be used for sticking piles, but not for advancing piles. Drop ham..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:08, 21 May 2014 Greenes2 talk contribs deleted page 703.04 - Mixture Requirements (Author request: content was: "'''703.04 - MIXTURE REQUIREMENTS''' The mixture proportions will be as shown in Table 703-1 of the Standard Specifications for Construction, reprinted here f..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:07, 21 May 2014 Greenes2 talk contribs deleted page 703.02 - Materials (Author request: content was: "'''703.02 - MATERIALS''' File:Table 703.02-1.jpg" (and the only contributor was "Alcantarj"))
  • 15:07, 21 May 2014 Greenes2 talk contribs deleted page 702.03 - Mixture Requirements (Author request: content was: "'''702.03 - MIXTURE REQUIREMENTS''' '''702.03.1 '''Standard Mortars and Grouts''' The cement and fine aggregates will be proportioned by weight for batc..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:07, 21 May 2014 Greenes2 talk contribs deleted page 702.02 - Materials (Author request: content was: "'''702.02 - MATERIALS''' File:Table 702.02-1.jpg Mortars and grouts: - may be remixed but will not be retempered or used after they have begun to s..." (and the only contributor was "[[Special:Contributions/Alca...)
  • 15:07, 21 May 2014 Greenes2 talk contribs deleted page 701.07 - Sampling and Testing Concrete (Author request: content was: "'''701.07 - SAMPLING AND TESTING CONCRETE''' Samples will be taken according to MTM 207. '''701.07.1 '''Determining Air Content''' Freshly Mixed Concret..." (and the only contributor was "[[Special:Contributions/Alca...)
(newest | oldest) View ( | ) (20 | 50 | 100 | 250 | 500)