Deletion log
Jump to navigation
Jump to search
Below is a list of the most recent deletions.
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.06 - Constructing Ditches (Author request: content was: "205 - Roadway Earthwork '''205.06 - CONSTRUCTING DITCHES''' Removal of material from ditches is generally classed as earth excavation as ditches are normally excavated along with general road cut using typical earth ...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.05 - Subgrade Undercutting (Author request: content was: "205 - Roadway Earthwork '''205.05 - SUBGRADE UNDERCUTTING''' There are three types of subgrade undercutting, all of which include backfilling and compaction. * Type I will be backfilled with selected clay or other s...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.04 - Blasting (Author request: content was: "205 - Roadway Earthwork '''205.04 - BLASTING''' Before using explosives on a project, the Contractor is to furnish the Engineer with a copy of the "rider" or clause in the insurance policy as evidence that there is a...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.03 - Rock Excavation (Author request: content was: "205 - Roadway Earthwork '''205.03 - ROCK EXCAVATION''' This work consists of the removal of solid rock or cemented soils that do not soften when wet or cannot be excavated without continuous drilling, blasting or con...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.02 - Preparing Roadway Foundation (Author request: content was: "205 - Roadway Earthwork '''205.02 - PREPARING ROADWAY FOUNDATION''' The roadway foundation must be properly prepared to provide uniform support and a stable structure. During embankment construction, the following o...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.01 - Earth Excavation (Author request: content was: "205 - Roadway Earthwork '''205.01 - EARTH EXCAVATION''' Section [http://mdotcf.state.mi.us/public/specbook/files/2012/205%20Roadway%20Earthwork.pdf 205] of the Standard Specifications for Construction details constru...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.03 - Hot Mix Asphalt (HMA) Pavements and Driveways (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.03 - HOT MIX ASPHALT (HMA) PAVEMENTS AND DRIVEWAYS''' For removal of HMA pavements and driveways: If the HMA surface removed is 5 inches (130 mm) or less ...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.02 - Structures (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.02 - STRUCTURES''' All structures and attached parts and connections shown on the plans to be removed will be entirely removed. Structures requiring remov...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.01 - Documentation (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.01 - DOCUMENTATION''' Identifying, measuring and recording removal items on an IDR (or on Form 1122A) are very important. If the Contractor chooses to dis...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 203.02 - Culvert of Sewer (Author request: content was: "203 - Removing Drainage Structures, Culverts, and Sewers '''203.02 - CULVERT OR SEWER''' When a culvert pipe and/or sewer pipe is to be removed, the culvert pipe and/or sewer pipe (and end treatments) are to be compl...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 203.01 - Drainage Structures (Author request: content was: "203 - Removing Drainage Structures, Culverts, and Sewers '''203.01 - DRAINAGE STRUCTURES''' When removing or abandoning a drainage structure, any live sewers connected to them will be rebuilt and properly connected t...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 202.02 - Instructions for Removing Corduroy (Author request: content was: "202 - Removing Trees, Stumps, and Corduroy '''202.02 - INSTRUCTIONS FOR REMOVING CORDUROY''' When corduroy is found within 4 feet (1.2 m) below plan grade, its removal will be by the foot (meter) measured along the r...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 202.01 - Instructions for Removing Trees and Stumps (Author request: content was: "202 - Removing Trees, Stumps, and Corduroy '''202.01 - INSTRUCTIONS FOR REMOVING TREES AND STUMPS''' These items will apply to locations outside the areas to be paid as '''Clearing'''. Work in progress and work comp...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 201.01 - General (Author request: content was: "201 - Clearing '''201.01 - GENERAL''' Before beginning any construction operation, refer to subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/107%20Legal%20Rel,%20Resp%20to%20Public.pdf 107.15], Compli...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.04 - Weighing Materials (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.04 - WEIGHING MATERIALS''' Materials paid for by weight are required to be weighed on an approved scale system. There are permanent and portable scale systems. '''307...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.03 - Measurement and Payment (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.03 - MEASUREMENT AND PAYMENT''' Where trenching is required on both sides of the road, each side will be measured separately along the road centerline. When shoulders ...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.02 - Construction (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.02 - CONSTRUCTION''' '''307.02.1 Trenching''' When trenching is proposed, the operations will not be performed beyond the distance that will be backfilled and comp...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 301.03 - Measurement and Payment (Author request: content was: "301 - Subbase '''301.03 - MEASUREMENT AND PAYMENT''' Plan quantity plus or minus any known changes, if agreed to by the Engineer and Contractor, as a basis for final quantity for subbase, is encouraged whenever possi...)
- 15:24, 21 May 2014 Greenes2 talk contribs deleted page 305.01 - General (Author request: content was: "305 - HMA Base Crushing and Shaping '''305.01 - GENERAL''' '''305.01.1 Equipment''' The age of the equipment being used by the Contractor will have an effect on the amount of additional crushed material through ...)
- 15:24, 21 May 2014 Greenes2 talk contribs deleted page 307.01 - General (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.01 - GENERAL''' For all trenching, shoulder and approach operations that cannot be completed at the end of the day, the Contractor will place and maintain traffic contr...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 306.01 - General (Author request: content was: "306 - Aggregate Surface Course '''306.01 - GENERAL''' Compliance with density requirements for aggregate surface course construction is just as important as for aggregate base construction. Poor compactive efforts a...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.04 - Inspection (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.04 - INSPECTION''' The inspector should study the staging details very carefully. In situations where the road must be reopened for traffic, the rubblizing Contractor a...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.03 - Materials (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.03 - MATERIALS''' Filler aggregate will meet the Open-graded Aggregate 3G Specification, Section [http://mdotcf.state.mi.us/public/specbook/files/2012/902%20Aggregate.pd...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.02 - Equipment (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.02 - EQUIPMENT''' Equipment will be as listed in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/304%20Rubbilizing%20PCC%20Pavt.pdf 304.03] of the Stand...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.01 - Description (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.01 - DESCRIPTION''' This work will consist of rubblizing existing concrete pavements to be used as a base course for Hot Mix Asphalt (HMA) pavements.")
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 303.01 - General (Author request: content was: "303 - Open Graded Drainage Course '''303.01 - GENERAL''' The plans and proposal should be reviewed for notes or special provisions pertaining to open graded drainage course (OGDC). OGDC is intended to provide a stab...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.03 - Measurement and Payment (Author request: content was: "302 - Aggregate Base Courses '''302.03 - MEASUREMENT AND PAYMENT''' '''302.03.1 Payment by Square Yard (Square Meter)''' The following criteria should be adhered to with payment by the square yard (square meter)...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.02 - Construction (Author request: content was: "302 - Aggregate Base Courses '''302.02 - CONSTRUCTION''' '''302.02.1 Placing and Compacting''' Some cross sections are designed with a “step” in the subbase and a different aggregate depth in the shoulder ar...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.01 - Materials (Author request: content was: "302 - Aggregate Base Courses '''302.01 - MATERIALS''' Aggregates from dense graded series 21AA, 21A and 22A will be used for aggregate bases as per subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/902...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 301.02 - Construction (Author request: content was: "301 - Subbase '''301.02 - CONSTRUCTION''' '''301.02.1 Procedure''' The subbase will be placed on an approved subgrade surface that meets density and cross section requirements. Verify that subgrade has been exam...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 301.01 - Materials (Author request: content was: "301 - Subbase '''301.01 - MATERIALS''' Granular Material Class II will be used for constructing subbase.")
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 405.01 - General (Author request: content was: "405 - Pump Station Construction '''405.01- GENERAL''' Pump station construction is extremely specialized work. For this reason, if a pump station is to be constructed, Section [http://mdotcf.state.mi.us/public/specb...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.03 - Measurement (Author request: content was: "404 - Underdrain '''404.03 - MEASUREMENT''' The inspector must measure and record trench dimensions to ensure that specification widths and depths are being obtained. Underdrains, edgedrains and bank drains are meas...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.02 - Materials (Author request: content was: "404 - Underdrain '''404.02 - MATERIALS''' Subgrade underdrains are slotted or perforated drains placed near the edge of the traveled way for the purpose of lowering a high groundwater condition or draining a granular...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.01 - General (Author request: content was: "404 - Underdrain '''404.01 - GENERAL''' It is very difficult to determine the extent and volume of groundwater infiltration. Experienced Region Soils personnel usually make this determination. The inspector should ...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 403.04 - Adjusting Drainage Sturctures (Author request: content was: "403 - Drainage Structures '''403.04 - ADJUSTING DRAINAGE STRUCTURES''' Refer to subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/403%20Drainage%20Structures.pdf 403.04] of the Standard Specifications ...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 403.03 - Backfilling Drainage Sturctures (Author request: content was: "403 - Drainage Structures '''403.03 - BACKFILLING DRAINAGE STRUCTURES''' Backfilling is to be done in accordance with subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/401%20Pipe%20Culverts.pdf 401.03]...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 403.02 - Construction Methods (Author request: content was: "403 - Drainage Structures '''403.02. - CONSTRUCTION METHODS''' Excavation for drainage structures is to be performed in accordance with subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/206%20Exc,%20Ba...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 403.01 - General (Author request: content was: "403 - Drainage Structures '''403.01 - GENERAL''' Drainage structures refer to manholes, catch basins, leaching basins, inlets and drop inlets as detailed on Standard Plan R-1 series or on project plans. A drainage s...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.08 - Illicit Connections (Author request: content was: "402 - Storm Sewers '''402.08 - ILLICIT CONNECTIONS''' If unusual or suspicious connections to MDOT’s storm sewer system are found during a construction project (e.g. the presence of a sudsy discharge or oily discha...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.07 - Sewer Taps (Author request: content was: "402 - Storm Sewers '''402.07 - SEWER TAPS''' Connections to storm sewers owned by counties, municipalities or drain commissions shall be according to the regulations of the owner and according to the plans and specif...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.06 - Sewer Pipe Jacked in Place (Author request: content was: "402 - Storm Sewers '''402.06 - SEWER PIPE JACKED-IN-PLACE''' Follow the requirements of subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/401%20Pipe%20Culverts.pdf 401.03] of the Standard Specification...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.05 - Inspection After Installation (Author request: content was: "402 - Storm Sewers '''402.05 - INSPECTION AFTER INSTALLATION''' All of the general inspection points in the previous section on culverts apply to sewer pipes. '''402.05.1 Mandrel Testing''' If smooth lined corr...)
- 15:11, 21 May 2014 Greenes2 talk contribs deleted page 402.04 - Backfilling Sewer Pipe (Author request: content was: "402 - Storm Sewers '''402.04 - BACKFILLING SEWER PIPE''' Backfilling sewer pipe will be as specified in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/401%20Pipe%20Culverts.pdf 401.03] of the Standa...)
- 15:11, 21 May 2014 Greenes2 talk contribs deleted page 402.03 - Installation (Author request: content was: "402 - Storm Sewers '''402.03 - INSTALLATION''' Construction methods shall be according to the health and safety requirements in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/104%20Control%20of%20Wo...)
- 15:11, 21 May 2014 Greenes2 talk contribs deleted page 402.02 - Materials Inspection (Author request: content was: "402 - Storm Sewers '''402.02. - MATERIALS INSPECTION''' Some concrete storm sewer pipe does not contain reinforcement and therefore requires careful handling. Any pipe damaged in transit or by handling should be rej...)
- 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.06 - Pipe Culverts Jacked in Place (Author request: content was: "401 - Culverts '''401.06 - PIPE CULVERTS JACKED-IN-PLACE''' Pipe culverts jacked-in-place are used when it is desired to place a drainage feature without disturbing the roadbed or railroad above the pipe. The excava...)
- 15:10, 21 May 2014 Greenes2 talk contribs deleted page 402.01 - General (Author request: content was: "402 - Storm Sewers '''402.01 - GENERAL''' The inspector’s preliminary investigation should determine if the storm sewer is correctly staked and the storm sewer is the type, size and class called for in the plans, o...)
- 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.05 - Inspection after Installation (Author request: content was: "401 - Culverts '''401.05 - INSPECTION AFTER INSTALLATION''' Culvert sections showing signs of settlement or poor alignment shall, as directed by the Engineer, be taken up and relaid at the Contractor’s expense. An...)
- 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.04 - Backfilling Culverts (Author request: content was: "401 - Culverts '''401.04 - BACKFILLING CULVERTS''' It is important to backfill the pipe as soon as possible after placement so that runoff is directed through and not alongside the pipe. This will reduce the possibi...)