(newest | oldest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 209.01 - General (Author request: content was: "209 - Project Cleanup '''209.01 - GENERAL''' This work consists of cleaning up the project, including roadsides, prior to final acceptance. Cleanup applies to the area within the ROW not in excess of 50 feet (15 met...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 208.05 - Non-Compliance Progressive Steps (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.05 - NON-COMPLIANCE PROGRESSIVE STEPS''' '''208.05.01''' The following are suggested progressive steps to take if a Contractor fails to comply with eithe...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 208.02 - Soil Erosion and Sedimentation Control Guidelines (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.02 - SOIL EROSION AND SEDIMENTATION CONTROL GUIDELINES''' '''208.02.01''' Notification: While individual permits are not necessary, the Engineer is requi...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.04 - Winter Shutdown (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.04 - WINTER SHUTDOWN''' '''208.04.01''' MDOT is able to suspend NPDES inspections during the winter on those projects that satisfy all of the following c...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.03 - National Pollutuion Discharge Eliminaton System (NPDES) Guidelines (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.03 - NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GUIDELINES''' '''208.03.01''' The proposal for projects subject to NPDES regulations, earth disturba...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.01 - General (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.01 - GENERAL''' '''208.01.01''' MDOT is responsible to provide transportation services in an environmentally sensitive manner. To that end, the followi...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 207.01 - General (Author request: content was: "207 - Obliterating Roadway '''207.01 - GENERAL''' Obliterating roadway applies only on those portions of the existing or temporary roadway outside the limits of the new roadway. The ditches will be filled and roadwa...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.04 - Suitability of Foundation Material (Author request: content was: "206 - Excavation and Backfill for Structures '''206.04 - SUITABILITY OF FOUNDATION MATERIAL''' Final excavation for the foundation to grade will not be made until just before the concrete is to be placed. Concrete w...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.03 - Excavation for Structures (Author request: content was: "206 - Excavation and Backfill for Structures '''206.03 - EXCAVATION FOR STRUCTURES''' Foundation excavation is set up for the excavation of all materials, except rock, encountered within the foundation excavation lim...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.02 - Backfill for Structures (Author request: content was: "206 - Excavation and Backfill for Structures '''206.02 - BACKFILL FOR STRUCTURES''' Backfill for structures that are bridges, grade separations, pump houses and retaining walls shall be Granular Material Class II, un...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 206.01 - Preparing Abutment Areas (Author request: content was: "206 - Excavation and Backfill for Structures '''206.01 - PREPARING ABUTMENT AREA''' The importance of the proper construction of bridge abutment embankments cannot be overemphasized. The abutments are rigid structur...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.15 - Measurement of Earthwork (Author request: content was: "205 - Roadway Earthwork '''205.15 - MEASUREMENT OF EARTHWORK''' If no changes occur during construction and there are no known design errors, final quantities for earth excavation, embankment CIP and top 3 feet (1 m)...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.14 - Machine Grading (Author request: content was: "205 - Roadway Earthwork '''205.14 - MACHINE GRADING''' Machine grading is used only when light grading, such as may be accomplished with a blade grader, is required to develop the desired section. This item includes...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.13 - Wetland Construction (Author request: content was: "205 - Roadway Earthwork '''205.13 - WETLAND CONSTRUCTION''' If a wetland is to be constructed in association with a project for mitigation purposes, there will generally be plan sheets detailing the construction requ...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.12 - Borrow/Use of Excess Property (Author request: content was: "205 - Roadway Earthwork '''205.12 - BORROW/USE OF EXCESS PROPERTY''' Earth material found outside the grading limits is considered borrow material. This can include material either inside or outside the ROW. Unless...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.11 - Trimming and Finishing Earth Grade (Author request: content was: "205 - Roadway Earthwork '''205.11 - TRIMMING AND FINISHING EARTH GRADE''' After the earth grade has been constructed to the required grade, all stones and rocks more than 3 inches (80 mm) in diameter appearing on the...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.10 - Test Rolling (Author request: content was: "205 - Roadway Earthwork '''205.10 - TEST-ROLLING''' Test-rolling the grade is a very important procedure for determining uniform stability of the subgrade. Perhaps the most important subgrade quality to attain is st...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.09 - Swamp Treatment (Author request: content was: "205 - Roadway Earthwork '''205.09 - SWAMP TREATMENT''' All swamp areas should be shown on plans with a specific method of treatment indicated. All low, poorly drained areas not shown as peat or muck should neverthel...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.08 - Constructing Embankments (Author request: content was: "205 - Roadway Earthwork '''205.08 - CONSTRUCTING EMBANKMENTS''' Embankments are generally constructed by three methods. (The last method will be discussed under Swamp Treatment. * Controlled density method. * 12 i...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.07 - Disposing of Surplus and Unsuitable Material (Author request: content was: "205 - Roadway Earthwork '''205.07 - DISPOSING OF SURPLUS AND UNSUITABLE MATERIAL''' The Contractor will be responsible for disposal of all surplus and unsuitable material. If it is disposed of in a storage area, spe...)