Deletion log
Jump to navigation
Jump to search
Below is a list of the most recent deletions.
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.07 - Equal Employment Opportunity (Author request: content was: "101 - General Project Administration '''101.07 - EQUAL EMPLOYMENT OPPORTUNITY''' For these regulations, minorities are defined as Black, Asian or Pacific Islanders, Native American and Hispanic. Compliance with the ...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.06 - Davis-Bacon Provisions (Author request: content was: "101 - General Project Administration '''101.06 - DAVIS-BACON PROVISIONS''' '''101.06.1 Truck Drivers - Owner/Operators''' These individuals are not subject to the wage rates prescribed by the Department of Labor....)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.04 - Inspector's Daily Reports (Author request: content was: "101 - General Project Administration '''101.04 - INSPECTOR’S DAILY REPORT (IDR)''' Perhaps the single most important type of project documentation is the Inspector’s Daily Report (IDR) and its variations. Becaus...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.01 - Project Authority (Author request: content was: "101 - General Project Administration '''101.01 - PROJECT AUTHORITY''' It is important that users of the manual understand their role in ensuring that specifications are adhered to in completing the project. Each per...)
- 15:36, 21 May 2014 Greenes2 talk contribs deleted page 210.06 - Dust Control (Author request: content was: "210 - Environmental '''210.06 - DUST CONTROL''' Dust control is very important, especially during the earthwork phase of construction. Adequate dust control measures will be maintained by the Contractor so as not to...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.05 - Contractor Yards (Author request: content was: "210 - Environmental '''210.05 - CONTRACTOR YARDS''' As mentioned in Section 205 of this manual, under Borrow/Use of Excess Property, the Contractor is not allowed to use sta...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.04 - Discovery of Bones, Archeological, and Historical Findings (Author request: content was: "210 - Environmental '''210.04 - DISCOVERY OF BONES, ARCHAEOLOGICAL AND HISTORICAL FINDINGS''' Subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/107%20Legal%20Rel,%20Resp%20to%20Public.pdf 107.09] of th...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.03 - Hazardous Waste Site Identification Numbers (MIK Numbers) (Author request: content was: "210 - Environmental '''210.03 - HAZARDOUS WASTE SITE IDENTIFICATION NUMBERS (MIK NUMBERS)''' In the past, when waste site identification numbers, formerly MIK numbers, were needed, they were obtained from the Environ...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.02 - Removal of Underground Storage Tanks (Author request: content was: "210 - Environmental '''210.02 - REMOVAL OF UNDERGROUND STORAGE TANKS''' MDOT has the responsibility to remove any underground storage tanks (USTs) found within the ROW, even if not in direct conflict with the propose...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.01 - General (Author request: content was: "210 - Environmental '''210.01 - GENERAL''' This section of the manual is not intended to be an all-inclusive environmental guidance document, but addresses those environmental issues that are commonly associated with...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 209.01 - General (Author request: content was: "209 - Project Cleanup '''209.01 - GENERAL''' This work consists of cleaning up the project, including roadsides, prior to final acceptance. Cleanup applies to the area within the ROW not in excess of 50 feet (15 met...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 208.05 - Non-Compliance Progressive Steps (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.05 - NON-COMPLIANCE PROGRESSIVE STEPS''' '''208.05.01''' The following are suggested progressive steps to take if a Contractor fails to comply with eithe...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 208.02 - Soil Erosion and Sedimentation Control Guidelines (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.02 - SOIL EROSION AND SEDIMENTATION CONTROL GUIDELINES''' '''208.02.01''' Notification: While individual permits are not necessary, the Engineer is requi...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.04 - Winter Shutdown (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.04 - WINTER SHUTDOWN''' '''208.04.01''' MDOT is able to suspend NPDES inspections during the winter on those projects that satisfy all of the following c...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.03 - National Pollutuion Discharge Eliminaton System (NPDES) Guidelines (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.03 - NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GUIDELINES''' '''208.03.01''' The proposal for projects subject to NPDES regulations, earth disturba...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.01 - General (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.01 - GENERAL''' '''208.01.01''' MDOT is responsible to provide transportation services in an environmentally sensitive manner. To that end, the followi...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 207.01 - General (Author request: content was: "207 - Obliterating Roadway '''207.01 - GENERAL''' Obliterating roadway applies only on those portions of the existing or temporary roadway outside the limits of the new roadway. The ditches will be filled and roadwa...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.04 - Suitability of Foundation Material (Author request: content was: "206 - Excavation and Backfill for Structures '''206.04 - SUITABILITY OF FOUNDATION MATERIAL''' Final excavation for the foundation to grade will not be made until just before the concrete is to be placed. Concrete w...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.03 - Excavation for Structures (Author request: content was: "206 - Excavation and Backfill for Structures '''206.03 - EXCAVATION FOR STRUCTURES''' Foundation excavation is set up for the excavation of all materials, except rock, encountered within the foundation excavation lim...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.02 - Backfill for Structures (Author request: content was: "206 - Excavation and Backfill for Structures '''206.02 - BACKFILL FOR STRUCTURES''' Backfill for structures that are bridges, grade separations, pump houses and retaining walls shall be Granular Material Class II, un...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 206.01 - Preparing Abutment Areas (Author request: content was: "206 - Excavation and Backfill for Structures '''206.01 - PREPARING ABUTMENT AREA''' The importance of the proper construction of bridge abutment embankments cannot be overemphasized. The abutments are rigid structur...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.15 - Measurement of Earthwork (Author request: content was: "205 - Roadway Earthwork '''205.15 - MEASUREMENT OF EARTHWORK''' If no changes occur during construction and there are no known design errors, final quantities for earth excavation, embankment CIP and top 3 feet (1 m)...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.14 - Machine Grading (Author request: content was: "205 - Roadway Earthwork '''205.14 - MACHINE GRADING''' Machine grading is used only when light grading, such as may be accomplished with a blade grader, is required to develop the desired section. This item includes...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.13 - Wetland Construction (Author request: content was: "205 - Roadway Earthwork '''205.13 - WETLAND CONSTRUCTION''' If a wetland is to be constructed in association with a project for mitigation purposes, there will generally be plan sheets detailing the construction requ...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.12 - Borrow/Use of Excess Property (Author request: content was: "205 - Roadway Earthwork '''205.12 - BORROW/USE OF EXCESS PROPERTY''' Earth material found outside the grading limits is considered borrow material. This can include material either inside or outside the ROW. Unless...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.11 - Trimming and Finishing Earth Grade (Author request: content was: "205 - Roadway Earthwork '''205.11 - TRIMMING AND FINISHING EARTH GRADE''' After the earth grade has been constructed to the required grade, all stones and rocks more than 3 inches (80 mm) in diameter appearing on the...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.10 - Test Rolling (Author request: content was: "205 - Roadway Earthwork '''205.10 - TEST-ROLLING''' Test-rolling the grade is a very important procedure for determining uniform stability of the subgrade. Perhaps the most important subgrade quality to attain is st...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.09 - Swamp Treatment (Author request: content was: "205 - Roadway Earthwork '''205.09 - SWAMP TREATMENT''' All swamp areas should be shown on plans with a specific method of treatment indicated. All low, poorly drained areas not shown as peat or muck should neverthel...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.08 - Constructing Embankments (Author request: content was: "205 - Roadway Earthwork '''205.08 - CONSTRUCTING EMBANKMENTS''' Embankments are generally constructed by three methods. (The last method will be discussed under Swamp Treatment. * Controlled density method. * 12 i...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.07 - Disposing of Surplus and Unsuitable Material (Author request: content was: "205 - Roadway Earthwork '''205.07 - DISPOSING OF SURPLUS AND UNSUITABLE MATERIAL''' The Contractor will be responsible for disposal of all surplus and unsuitable material. If it is disposed of in a storage area, spe...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.06 - Constructing Ditches (Author request: content was: "205 - Roadway Earthwork '''205.06 - CONSTRUCTING DITCHES''' Removal of material from ditches is generally classed as earth excavation as ditches are normally excavated along with general road cut using typical earth ...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.05 - Subgrade Undercutting (Author request: content was: "205 - Roadway Earthwork '''205.05 - SUBGRADE UNDERCUTTING''' There are three types of subgrade undercutting, all of which include backfilling and compaction. * Type I will be backfilled with selected clay or other s...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.04 - Blasting (Author request: content was: "205 - Roadway Earthwork '''205.04 - BLASTING''' Before using explosives on a project, the Contractor is to furnish the Engineer with a copy of the "rider" or clause in the insurance policy as evidence that there is a...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.03 - Rock Excavation (Author request: content was: "205 - Roadway Earthwork '''205.03 - ROCK EXCAVATION''' This work consists of the removal of solid rock or cemented soils that do not soften when wet or cannot be excavated without continuous drilling, blasting or con...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.02 - Preparing Roadway Foundation (Author request: content was: "205 - Roadway Earthwork '''205.02 - PREPARING ROADWAY FOUNDATION''' The roadway foundation must be properly prepared to provide uniform support and a stable structure. During embankment construction, the following o...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.01 - Earth Excavation (Author request: content was: "205 - Roadway Earthwork '''205.01 - EARTH EXCAVATION''' Section [http://mdotcf.state.mi.us/public/specbook/files/2012/205%20Roadway%20Earthwork.pdf 205] of the Standard Specifications for Construction details constru...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.03 - Hot Mix Asphalt (HMA) Pavements and Driveways (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.03 - HOT MIX ASPHALT (HMA) PAVEMENTS AND DRIVEWAYS''' For removal of HMA pavements and driveways: If the HMA surface removed is 5 inches (130 mm) or less ...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.02 - Structures (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.02 - STRUCTURES''' All structures and attached parts and connections shown on the plans to be removed will be entirely removed. Structures requiring remov...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.01 - Documentation (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.01 - DOCUMENTATION''' Identifying, measuring and recording removal items on an IDR (or on Form 1122A) are very important. If the Contractor chooses to dis...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 203.02 - Culvert of Sewer (Author request: content was: "203 - Removing Drainage Structures, Culverts, and Sewers '''203.02 - CULVERT OR SEWER''' When a culvert pipe and/or sewer pipe is to be removed, the culvert pipe and/or sewer pipe (and end treatments) are to be compl...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 203.01 - Drainage Structures (Author request: content was: "203 - Removing Drainage Structures, Culverts, and Sewers '''203.01 - DRAINAGE STRUCTURES''' When removing or abandoning a drainage structure, any live sewers connected to them will be rebuilt and properly connected t...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 202.02 - Instructions for Removing Corduroy (Author request: content was: "202 - Removing Trees, Stumps, and Corduroy '''202.02 - INSTRUCTIONS FOR REMOVING CORDUROY''' When corduroy is found within 4 feet (1.2 m) below plan grade, its removal will be by the foot (meter) measured along the r...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 202.01 - Instructions for Removing Trees and Stumps (Author request: content was: "202 - Removing Trees, Stumps, and Corduroy '''202.01 - INSTRUCTIONS FOR REMOVING TREES AND STUMPS''' These items will apply to locations outside the areas to be paid as '''Clearing'''. Work in progress and work comp...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 201.01 - General (Author request: content was: "201 - Clearing '''201.01 - GENERAL''' Before beginning any construction operation, refer to subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/107%20Legal%20Rel,%20Resp%20to%20Public.pdf 107.15], Compli...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.04 - Weighing Materials (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.04 - WEIGHING MATERIALS''' Materials paid for by weight are required to be weighed on an approved scale system. There are permanent and portable scale systems. '''307...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.03 - Measurement and Payment (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.03 - MEASUREMENT AND PAYMENT''' Where trenching is required on both sides of the road, each side will be measured separately along the road centerline. When shoulders ...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.02 - Construction (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.02 - CONSTRUCTION''' '''307.02.1 Trenching''' When trenching is proposed, the operations will not be performed beyond the distance that will be backfilled and comp...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 301.03 - Measurement and Payment (Author request: content was: "301 - Subbase '''301.03 - MEASUREMENT AND PAYMENT''' Plan quantity plus or minus any known changes, if agreed to by the Engineer and Contractor, as a basis for final quantity for subbase, is encouraged whenever possi...)
- 15:24, 21 May 2014 Greenes2 talk contribs deleted page 305.01 - General (Author request: content was: "305 - HMA Base Crushing and Shaping '''305.01 - GENERAL''' '''305.01.1 Equipment''' The age of the equipment being used by the Contractor will have an effect on the amount of additional crushed material through ...)
- 15:24, 21 May 2014 Greenes2 talk contribs deleted page 307.01 - General (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.01 - GENERAL''' For all trenching, shoulder and approach operations that cannot be completed at the end of the day, the Contractor will place and maintain traffic contr...)