Deletion log
Jump to navigation
Jump to search
Below is a list of the most recent deletions.
(newest | oldest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)- 14:35, 16 September 2014 Greenes2 talk contribs deleted page Innovative Contracting Manual (Author request)
- 15:25, 5 September 2014 Greenes2 talk contribs deleted page Division 1 Supplemental Information (Author request: Old/conflicting information)
- 13:27, 4 September 2014 Greenes2 talk contribs deleted page 701 - Portland Cement Concrete (Rename of page to follow 2012 SSFC)
- 08:04, 9 July 2014 Greenes2 talk contribs deleted page File:Fig715-02.png (Duplicated file)
- 07:59, 9 July 2014 Greenes2 talk contribs deleted page File:Fig715-02.png (Deleted old revision 20140709115647!Fig715-02.png: Duplicated file)
- 07:58, 9 July 2014 Greenes2 talk contribs deleted page File:Fig715-02.png (Deleted old revision 20140709115618!Fig715-02.png: Duplicated file)
- 07:58, 9 July 2014 Greenes2 talk contribs deleted page File:Fig715-02.png (Deleted old revision 20140709115429!Fig715-02.png: Duplicated file)
- 11:22, 2 July 2014 Greenes2 talk contribs deleted page File:Work continues on the new M-85 (Fort Street) bridge over the Rouge River in Detroit. This project's expected to be finished in late November.jpg (Duplicated file: This one is messed up!)
- 09:49, 2 July 2014 Greenes2 talk contribs deleted page File:ExCMpg1.png (too wide)
- 09:58, 29 May 2014 HarrisR18 talk contribs deleted page File:Table712.2.png (Deleted old revision 20140529134741!Table712.2.png)
- 09:55, 29 May 2014 HarrisR18 talk contribs deleted page File:Table712.3.png (Deleted old revision 20140529134919!Table712.3.png)
- 16:04, 21 May 2014 Greenes2 talk contribs deleted page 110 - Programs Not Covered by Standard Specifications (Author request: content was: "110 - Programs not Covered by Standard Specification * 110.01 - Engineer Certification Program * 110.02 - Railroad Highway Projects * 110.03 - Delay of Project Due to Utility Conflict * [[110.04 - Final Financ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 204.04 - Demolition Contracts (Author request: content was: "===Demolition Contracts=== There is no reference to this work in the Standard Specifications for Construction. Requirements for demolition work are usually detailed in contracts prepared by the Real Estate Support Area. ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 502.03 - Surface Preperation (Author request: content was: "502 - HMA Construction Practices ==502.03 - SURFACE PREPARATION== ===502.03.1 Aggregate Base=== The ride quality of the surface depends, to a great degree, upon the conditioning and preparation of the aggregate ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 102.03 - Progress Clause (Author request: content was: "102 - PreConstruction Administration '''102.03 - PROGRESS CLAUSE''' The Engineer is responsible for providing the Progress Clause at the OEC meeting. The Progress Clause is an important part of the bidding proposal ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.04 - Final Financial Process (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.06 - FINAL FINANCIAL PROCESS''' After concurrence with the audit report is obtained, and if nec..." (and the only contributor was "[[Special:Contributions/...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.03 - Delay of Project Due to Utility Conflict (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.03 - DELAY OF PROJECT DUE TO A UTILITY CONFLICT''' '''110.03.1 General Information''' When ..." (and the only contributor was "[[Special:Contributions/...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.02 - Railroad Highway Projects (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.02 - RAILROAD HIGHWAY PROJECTS''' Safety deficiencies, evaluation of crossing/separation condit..." (and the only contributor was "[[Special:Contributions/...)
- 16:02, 21 May 2014 Greenes2 talk contribs deleted page 110.01 - Engineer Certification Program (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.01 - ENGINEER CERTIFICATION PROGRAM''' In order to be eligible for certification, the following criteria must be met: * Recommendation for certification b...)
- 16:02, 21 May 2014 Greenes2 talk contribs deleted page 109.09 - Final Estimate Review (Author request: content was: "109 - Measurement and Payment '''109.09 - FINAL ESTIMATE REVIEW''' When the Engineer has determined the final quantities of all pay items, the Region office should be advised that the project is ready for a final est...)