N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

20 January 2022

     15:11  103.02 Contract Revisions diffhist +162 SchaeferS talk contribs →‎Requirements for FHWA Review on Projects of Division Interest (PoDI): Updated to FHWA Risk-Based Project Involvement (RBPI) Projects and Stewardship & Oversight Plan (S&O Plan)

18 January 2022

     09:41  102.02 Contents of Proposal - Progress Clause diffhist 0 SchaeferS talk contribs →‎Progress Clause: Updated Typical Long-Lead Items for Delineator and 3# U-Channel Posts

13 January 2022

     11:41  501 - Plant Produced Hot Mix Asphalt‎‎ 2 changes history -25 [SchaeferS‎ (2×)]
     
11:41 (cur | prev) -50 SchaeferS talk contribs →‎Utilizing Reclaimed Asphalt Pavement (RAP) Millings from the Same Project When Using a Portable Hot Mix Asphalt (HMA) Plant: Removed section cat
     
11:39 (cur | prev) +25 SchaeferS talk contribs →‎Utilizing Reclaimed Asphalt Pavement (RAP) Millings from the Same Project When Using a Portable Hot Mix Asphalt (HMA) Plant: Updated cat section

5 January 2022

     07:57  Final Project Review Report diffhist +1 SchaeferS talk contribs Replaced Final Project Review Report User Guide with September 2020 version

4 January 2022

     13:53  102.02 Contents of Proposal - Progress Clause diffhist +25 SchaeferS talk contribs →‎Progress Clause: updated/added to Guardrail - Steel typical long-lead times
     13:25  109.07 Final Inspection, Acceptance, and Final Payment diffhist -71 SchaeferS talk contribs →‎Acceptance of Work: Removed outdated images and added updated image
     09:25  107.09 Archeological and Historical Findings‎‎ 2 changes history +192 [SchaeferS‎ (2×)]
     
09:25 (cur | prev) +93 SchaeferS talk contribs →‎LAP Project Considerations: Added link to LAP definitions
     
09:14 (cur | prev) +99 SchaeferS talk contribs →‎LAP Project Considerations
     09:20  Local Agency Program (LAP) diffhist +166 SchaeferS talk contribs →‎Construction Manual index/links for ‘LAP Project Considerations’: added Archeological and Historical Findings as a resource