Search results

Jump to navigation Jump to search
  • The Construction Field Services (CFS) Division has revised the Hot Mix Asphalt (HMA) Production Manual. A brief descripti * Point 8 was reworded as follows: “If the sample weight exceeds 2000 grams, it sh
    4 KB (560 words) - 14:14, 19 June 2017
  • [[Category: Division 8]]
    3 KB (465 words) - 10:50, 19 January 2022
  • A low slump concrete 1/8 inch (about 2 mm) will be needed for proper slipforming. Only an occasiona ...d before the concrete sets. For the balance of the curb, a tolerance of 3/8 inch in 10 foot (10 mm in 3 m) is permitted. If the slipform machine is fu
    12 KB (1,916 words) - 10:49, 19 January 2022
  • Additional depth checks will be taken 25 feet (8 m) each way from the original and the average of the three depth checks wil Additional depth checks at 25 feet (8 m) intervals each way will be taken until achieving a depth of less than 1
    6 KB (873 words) - 13:24, 16 February 2022
  • ...gh the Construction Operations Engineer in the Construction Field Services Division. The VEDT membership will consist of the following individuals (or their de ::e. Administrator of the Development Services Division (if a local agency project)
    9 KB (1,297 words) - 13:57, 11 October 2022
  • <center><span STYLE="font: 15pt arial;">'''Construction Field Services Division '''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    28 KB (3,729 words) - 12:21, 26 July 2022
  • ...old formed members must be at least 1.5 times the material thickness (or 3/8 inches). [[Category: Division 8]]
    8 KB (1,158 words) - 13:26, 11 October 2022
  • ...e-foaming (air- detraining) admixtures. Furnish concrete containing 5.0 to 8.0 percent entrained air, except as follows: ::'''1.''' Provide an entrained air content of 5.5 to 8.5 percent for concrete containing Type F or Type G admixtures;
    12 KB (1,593 words) - 12:11, 26 July 2022
  • ...JUNE 2022.jpg|thumb|center|750px|link=//{{SERVERNAME}}/images_construction/8/8a/Engineer_certification_list_-_JUNE_2022.pdf]] ...e divisions of work. Projects with all major work on a single pay item or division will only be considered if the other submitted projects contain a more dive
    11 KB (1,491 words) - 08:56, 5 July 2022
  • [[Category: Division 8]]
    6 KB (864 words) - 11:42, 19 January 2022
  • [[Category: Division 8]]
    6 KB (929 words) - 10:50, 19 January 2022
  • <center><span STYLE="font: 40pt arial;">'''Division 7 Supplemental Information'''</span></center> ...Bridge Decks Concrete Depth Measurements, for all bridge deck pours. See Division 706 of the Construction Manual for a sample form and instructions. Concret
    33 KB (4,932 words) - 15:38, 12 May 2021
  • ...recommended to establish proper line and grade. Vertical tolerances of 5.8 inch (15 mm) measured off a compacted surface or 1-1/4 inch (30 mm) measure [[Category: Division 8]]
    8 KB (1,132 words) - 11:42, 19 January 2022
  • * Blisters where the surface is broken or which project more than 1/8 inch (3 mm) above the surface. * Variations of more than 1/8 inch (3 mm) per lineal foot (300 mm) in alignment of pipe intended to be st
    16 KB (2,323 words) - 16:47, 12 January 2022
  • The Construction Field Services Division (CFS) maintains a recommended procedure guide for damaged coating repair th :EGLE, Waste and Hazardous Material Division
    32 KB (4,794 words) - 10:47, 19 January 2022
  • ...he length of the cage for #8 bar or smaller, and 10’ for bars larger than #8 to ensure a minimum annular space of 3 inches between the outside of the ca ...anner, as not to cause racking or distorting of the tied cage. See Figure 8 for a typical reinforcement cage being lowered into the completed shaft.
    28 KB (4,355 words) - 10:48, 19 January 2022
  • ...lumber beams. Most beam type superstructures consist of sawn lumber 4 to 8 inches wide and 12 to 18 inches deep, spaced 3 feet or less apart. The dec ...surface typically is hot mixed asphalt. The panels are typically between 8 and 16 inches. deep. This structure type can be used for clear spans up to
    17 KB (2,623 words) - 10:45, 19 January 2022
  • ...cutting torch using a guide to assure a smoother chamber. A maximum of 1/8 inch land (shoulder) will be retained. If the end of the driven length of ...nt will provide a 1/8 inch clear opening at the nearest point. When the 1/8 inch opening at the nearest point allows more than a ¼ inch opening at oth
    29 KB (4,613 words) - 10:44, 19 January 2022
  • .../project engineer is notified of all commitments by the Contracts Services Division (CSD). The email notification includes all DBE commitment specifics and whe ...supplier is in compliance with the regulations. MDOT’s Contract Services Division will receive and forward the liquid asphalt affidavit to the designated Off
    27 KB (4,156 words) - 14:12, 3 October 2022
  • ...total net cumulative contract modifications / $10,000 original contract = 8 percent The contract modification would be evaluated as being 8 percent over awarded contract amount requiring Tier II approval.
    47 KB (7,034 words) - 14:08, 2 August 2022

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)