    9 KB (1,264 words) - 13:09, 13 May 2024
  • The bulk of the information will typically be under the construction sub-division for each section. ...registered) can make a suggestion to the Content Manager for a particular division:
    10 KB (1,538 words) - 12:26, 22 August 2022
  • <center><span STYLE="font: 15pt arial;">'''Construction Field Services Division '''</span></center> |<center>11/5/2018</center>||<center>[[Preconstruction_Meeting|Preconstruction Meeting]]<
    28 KB (3,726 words) - 16:02, 8 March 2023
  • | colspan="5" | | colspan="5" |
    13 KB (1,768 words) - 11:05, 13 July 2023
  • ...o check for irregularities. Any variation exceeding 3/16 inch in 10 foot (5.0 mm in 3 m) in the gutter or top of the curb is to be corrected before th Face forms are supported from the back form by use of division plates. See '''''Figure 802-3'''''. In addition to supporting the face fo
    12 KB (1,916 words) - 11:49, 19 January 2022
  • ...kness of the HMA pavement after cold-milling should range from 4 inches to 5 inches (100 mm to 125 mm). [[Category:Division 3]]
    4 KB (552 words) - 16:44, 12 January 2022
  • !Updated!! Division !! Section !! Summary !! What Changed |<center>5/13/2020</center>||<center>1 Supplemental</center>||<center>[[109.07_Final_I
    16 KB (2,430 words) - 15:46, 6 May 2021
  • ...vailable with the Construction Contracts Unit, Construction Field Services Division. *Initial Sample Size - A minimum of 5 percent of contract pay items (rounded up) must be reviewed initially or a
    19 KB (2,779 words) - 17:01, 6 November 2023
  • :5. Consultant project stakeholders&nbsp;&nbsp;(Development and/or Delivery St [[Category:Division 1]]
    7 KB (1,055 words) - 11:29, 14 July 2020
  • <center>5</center> [[Category: Division 8]]
    6 KB (797 words) - 17:08, 27 March 2023
  • ...compound is applied at a rate of 1 gallon per 25 square yards (1 liter per 5 m<sup>2</sup>). ...mm). Plain precast must be 6 inches (150 mm) thick and 15 square feet (1.5&nbsp;m2) surface area.
    4 KB (644 words) - 17:17, 19 September 2023
  • ...section 109.05.C, the contractor must provide the detailed estimate within 5 calendar days. A detailed cost estimate is recommended for justification o [[Category:Division 1]]
    6 KB (868 words) - 13:19, 6 June 2023
  • ...ording to specifications and contain an expansive admixture that creates a 5-10% increase in volume. They also contain very little chlorides and thus a [[Category:Division 7]]
    5 KB (749 words) - 11:43, 19 January 2022
  • ...ID=c961274a08c1423164e297c9d95b4e02&node=pt29.1.5&rgn=div5 29 CFR 3.3 Part 5 Federal Contract Law Provisions] electronic signatures are defined as a com [[Category: Division 1]]
    8 KB (1,208 words) - 15:30, 20 September 2023
  • When erecting woven wire fence, a line post must be placed every 15 feet (5 meters). Every end, corner, gate, angle, intersection or intermediate post [[Category: Division 8]]
    6 KB (864 words) - 12:42, 19 January 2022
  • The Construction Field Services Division (CFS) maintains a recommended procedure guide for damaged coating repair th :EGLE, Waste and Hazardous Material Division
    33 KB (4,797 words) - 11:46, 25 April 2023
  • A drainage structure shall not be placed within 5 feet (1.5 m) of the spring point of a street return so that the transverse joint will ...ortar. The bricks or blocks are then laid in courses with mortar joints 0.5 inch (13 mm) thick ± 0.1 inch (3 mm). Mortar joints should be of uniform
    7 KB (999 words) - 17:47, 12 January 2022
  • ...for the purpose of records retention) is the date the Financial Operations Division (FOD) does the final billing to FHWA for federal funds. In addition to the | [//{{SERVERNAME}}/images_construction/5/5d/IPhone_as_mouse_in_Citrix_on_iPad.pdf IPhone as mouse in Citrix on Ipad]
    12 KB (1,824 words) - 16:49, 18 April 2024
  • ...be considered cause for rejection, unless these defects exist in more than 5 percent of the entire shipment or delivery. ...’s marks designating the top and bottom of the pipe shall not be more than 5 degrees from the vertical plane through the longitudinal axis of the pipe.
    16 KB (2,323 words) - 17:47, 12 January 2022
  • ...ovals have been obtained, provide a copy to the Construction Field Service Division Resource Specialist for inclusion into the MiEnviro permit system. ...tions within that time frame are not possible the engineer must within the 5 days, submit a plan to EGLE describing the proposed actions. It is recomme
    19 KB (2,830 words) - 17:02, 15 February 2024