  • ...re, the thickness of the HMA pavement after cold-milling should range from 4 inches to 5 inches (100 mm to 125 mm). [[Category:Division 3]]
    4 KB (552 words) - 16:44, 12 January 2022
  • 4-1/2 percent air content permitted for slumps under 1.5 inches (37 mm). Che ...own on Standard Plan R-49 Series. Check depth of plane-of-weakness joint (4 inches (100 mm) required to control cracking). These joints may be formed
    6 KB (929 words) - 11:50, 19 January 2022
  • <center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    68 KB (8,802 words) - 12:10, 1 May 2024
  • ...s/construction/index.php/E-Construction#e-Construction.2FPaper_File_System Division 1 e-construction tables]. The element sequence and general format are as * Control+F can be used to search all 4 tables
    57 KB (6,809 words) - 11:51, 1 May 2024
  • Face forms are supported from the back form by use of division plates. See '''''Figure 802-3'''''. In addition to supporting the face fo [[File:Figure 802-3.JPG|center|thumb|600px|Figure 802-3 - Curb and Gutter Division Plates]]
    12 KB (1,916 words) - 11:49, 19 January 2022
  • ...reported. Timber is not required to be cut in lengths less than 8 feet (2.4 m). Any discussion with adjacent property owners should be reported. Type II - Stumps will be chipped or ground down to an elevation approximately 4 inches (100 mm) below the proposed ground level.
    8 KB (1,133 words) - 12:01, 28 March 2023
  • :4. Major Subcontractors^^ [[Category:Division 1]]
    7 KB (1,055 words) - 11:29, 14 July 2020
  • <center>4</center> [[Category: Division 8]]
    6 KB (797 words) - 17:08, 27 March 2023
  • ...surface is finished with a wood float and all edges are finished with a 1/4 inch (6 mm) radius. Curing compound is applied at a rate of 1 gallon per 2 [[Category: Division 8]]
    4 KB (644 words) - 17:17, 19 September 2023
  • ...ons-Construction.pdf?rev=df6ed714e5bb43b6814fb252b1ed2561#page=208 Section 4] of the Standard Specifications for Construction. [[Category:Division 3]]
    5 KB (803 words) - 11:16, 21 July 2022
  • !Updated!! Division !! Section !! Summary !! What Changed |<center>4/28/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engi
    16 KB (2,430 words) - 15:46, 6 May 2021
  • ...perations Environmental Engineer or the Supervising Engineer of the Design Division’s Utilities Drainage and Roadsides Section. ...receipt of the claim in accordance with the Act (ref: MCL 691.1416 Sec 19(4)). It is not necessary to wait until an actual claim is received to make t
    20 KB (3,034 words) - 15:47, 19 January 2022
  • [[Category:Division 4]]
    6 KB (843 words) - 17:47, 12 January 2022
  • ...red polyethylene mesh, with 2 inch (50 mm) diamond-shaped openings, and is 4 feet (1.2 m) in height. Installation, maintenance and removal requirements [[Category: Division 8]]
    6 KB (864 words) - 12:42, 19 January 2022
  • ...ned and field coated with a similar three-coat system, referred to as Type 4. The following guidelines should be strictly followed in inspecting these The Construction Field Services Division (CFS) maintains a recommended procedure guide for damaged coating repair th
    33 KB (4,797 words) - 11:46, 25 April 2023
  • [[Category:Division 4]]
    7 KB (999 words) - 17:47, 12 January 2022
  • ...oil, peat or muck, should be covered with a layer of topsoil approximately 4 inches (100 mm) thick, or as otherwise shown. After the spreading operatio ...side turf due to their high maintenance requirements. Remember that the 3/4 inch (20 mm) soil thickness and soil type must also apply to nursery grown
    15 KB (2,398 words) - 13:12, 26 July 2022
  • ...for the purpose of records retention) is the date the Financial Operations Division (FOD) does the final billing to FHWA for federal funds. In addition to the | [//{{SERVERNAME}}/images_construction/4/43/Procedures_for_e_Construction_Documents.pdf Procedure for E-construction
    12 KB (1,824 words) - 16:49, 18 April 2024
  • Method 4: At the Department’s option, verification may be done on an annual basis ...ication tags which are provided by the Engineer and inserted a maximum of .4 inches (10 mm) into the top of each freshly molded cylinder. Other methods
    26 KB (3,908 words) - 11:41, 10 January 2024
  • .../project engineer is notified of all commitments by the Contracts Services Division (CSD). The email notification includes all DBE commitment specifics and whe 4. DBEs must pay the refineries with their own funds. The prime is not to p
    27 KB (4,137 words) - 14:31, 17 April 2024