Search results

Jump to navigation Jump to search
  • <center>4</center> ...d when they arrive on a project. Straight Tie Bar examples (See Figure 602-4, 602-5, 602-6, 602-7). Bent Tie Bar examples (See Figures 602-8, 602-9, 602
    58 KB (9,258 words) - 17:27, 24 April 2024
  • ...hand chipping involves chipping to ¾” below top mat or more (approximately 4” to full depth). This type of patch may be repaired with the LMC; however ...heir original bar diameter is supplemented with additional reinforcement. Supplemental steel reinforcement should be lapped with the existing deck steel for a dis
    84 KB (13,299 words) - 11:46, 19 January 2022
  • <div align="right">4.41</div> ...crete_JMF_Yield_Calculator.v3.4-17-13.xls Concrete_JMF_Yield_Calculator.v3.4-17-13.xls]
    30 KB (4,172 words) - 17:23, 3 January 2024
  • ...the limits. The depth of excavation below plan grade varies from 3-1/2 to 4 feet (1 to 1.2 m) in the southern and central parts of the state and to 5 f ...any units are hauling a short distance to a small embankment area. Either supplemental compactive equipment must be added, or the number of hauling units reduced,
    78 KB (12,236 words) - 14:45, 21 September 2023

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)