Search results

Jump to navigation Jump to search
  • <center>7</center> [[Category: Division 8]]
    6 KB (797 words) - 17:08, 27 March 2023
  • [[Category: Division 7]]
    5 KB (743 words) - 11:48, 19 January 2022
  • <center><span STYLE="font: 40pt arial;">'''Division 7 Supplemental Information'''</span></center> ...dinated with the Standard Specifications for Construction, Divisions 6 and 7 of the Construction Manual, Special Provision 12SP604B QUALITY CONTROL AND
    33 KB (4,932 words) - 16:38, 12 May 2021
  • ...webpage], MDOT's ProjectWise resource [http://www.michigan.gov/mdot/0,4616,7-151-9625_21540_36037-321341--,00.html webpage], or other links provided wit ...for the purpose of records retention) is the date the Financial Operations Division (FOD) does the final billing to FHWA for federal funds. In addition to the
    12 KB (1,824 words) - 16:49, 18 April 2024
  • .../index.php/File:1101_spreadsheet.xlsx 1101] for project let before October 7, 2016 and [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1 For projects let prior to October 7, 2016 the engineer will pay the contractor an amount equal to the sum of th
    41 KB (6,267 words) - 17:31, 6 June 2023
  • ...ecbook/files/2012/707%20Str%20Steel%20Construction.pdf subsection 707.03.D.7.c] of the Standard Specifications for Construction. ...iated. Contact Bridge Field Services, [http://www.michigan.gov/mdot/0,4616,7-151-9623_26663_56139_56173-278981--,00.html Structural Fabrication Unit] fo
    8 KB (1,268 words) - 11:47, 19 January 2022
  • ...indicate approval If no response is provided back to the Contractor within 7 calendar days, then the schedule will be considered approved. [[category:Division 1]]
    8 KB (1,206 words) - 14:27, 29 February 2024
  • ...perations Environmental Engineer or the Supervising Engineer of the Design Division’s Utilities Drainage and Roadsides Section. ...termination and resolution will be reached in consultation with the Design Division, the Operations Environmental Engineer, and possibly the Assistant Attorney
    20 KB (3,034 words) - 15:47, 19 January 2022
  • ....html Materials Source Guide] and the [http://www.michigan.gov/mdot/0,4616,7-151-9622_11044_11367-207980--,00.html Materials Quality Assurance Procedure <center>7</center>
    21 KB (3,052 words) - 16:41, 22 November 2023
  • ...ened sufficiently as to reduce lateral pressures on the forms. See Figure 7 from the ''Dayton-Superior, Concrete Forming Accessories Product Handbook ( <center>[[File:714 Fig 7.png|thumb|center|600px|Figure 714-7 - Proper vibrating techniques in deep forms]]</center>
    19 KB (2,733 words) - 11:47, 19 January 2022
  • ...ovals have been obtained, provide a copy to the Construction Field Service Division Resource Specialist for inclusion into the MiEnviro permit system. ...nspect construction sites for Part 91 and Part 31 / NPDES compliance every 7 days or within 24 hours after a precipitation event that results in a disch
    19 KB (2,830 words) - 17:02, 15 February 2024
  • The Construction Field Services Division (CFS) maintains a recommended procedure guide for damaged coating repair th :EGLE, Waste and Hazardous Material Division
    33 KB (4,797 words) - 11:46, 25 April 2023
  • ...required method of inspection is listed for all materials in [[#Division 9|Division 9]] of the Construction Manual and is to be followed. If in doubt, the Reg [[Category:Division 7]]
    15 KB (2,322 words) - 11:43, 19 January 2022
  • ...tions for Construction Table 1004-1 in subsection 1004 and note (g) 3- to 7-inch slump for tremie applications without admixture or with Type A or D ad ...r project specifications. Contact the [http://www.michigan.gov/mdot/0,4616,7-151-9623_26663_27303-269622--,00.html MDOT Geotechnical Services Section] f
    30 KB (4,732 words) - 15:44, 29 February 2024
  • [[Category: Division 7]]
    9 KB (1,409 words) - 11:48, 19 January 2022
  • * 90% of the verification strength at 7 days * 90% of the verification strength at 7 days
    26 KB (3,908 words) - 11:41, 10 January 2024
  • ...e outside of the cage and the side of the excavation or casing. See Figure 7 for an example of plastic spacers on the rebar cage. [[File:Fig 718-7.png|600px|framed|center|Figure 7. Rebar cage spacers]]
    28 KB (4,324 words) - 11:40, 25 April 2023
  • ...dot/0,4616,7-151-9625_23109---,00.html http://www.michigan.gov/mdot/0,4616,7-151-9625_23109---,00.html] .../project engineer is notified of all commitments by the Contracts Services Division (CSD). The email notification includes all DBE commitment specifics and whe
    27 KB (4,137 words) - 14:31, 17 April 2024
  • <center>7</center> <center>7</center>
    56 KB (7,443 words) - 17:48, 9 October 2023
  • ...moval process notify the Engineer and [http://www.michigan.gov/mdot/0,4616,7-151-9623_26663_56139_56173---,00.html Bridge Field Services]. A repair plan ...ly be brought to the attention of the [http://www.michigan.gov/mdot/0,4616,7-151-9623_26663_56139_56173---,00.html Engineer and Bridge Field Services.]
    14 KB (2,289 words) - 17:29, 10 April 2023

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)