Search results

Jump to navigation Jump to search
  • ...nt to remember when setting clearances and fitting within other structural items. ...s subject to the approval of the MDOT [http://www.michigan.gov/mdot/0,4616,7-151-9623_26663_27303-269622--,00.html Geotechnical Services Section] area b
    32 KB (5,122 words) - 14:16, 29 February 2024
  • :*Minor Damages (spalls, cracks, broken corners, etc.) See Figure 708.7 through Figure 708.8 for examples of minor damages [[File:Fig_708.7.png|600px|thumbnail|center|Figure 708.7 – Minor damage – broken corner at end of PCI girder]]
    27 KB (4,105 words) - 11:45, 19 January 2022
  • ...the material is stored properly prior to installation. Below is a list of items the inspector should check regarding storage of structural steel elements: :*Related items such as bearings, bridge railing, sign structures and tower lighting units
    45 KB (7,017 words) - 13:22, 26 July 2022
  • ...he actual beam elevations. (See [[701 - Portland Cement Concrete|Division 7]] of this manual for more on structure elevations.) | From MP to Sta 9+27.74 to 9+50 || 22.26 || 0.028648 || 0.63773 || 0° 38' 15.7"
    201 KB (30,214 words) - 14:43, 19 June 2017
  • ...at least remain in place until the entire concrete deck has completed its 7-day wet cure. ...ds on the form lumber thickness and the span distance between beams. These items should be proportioned to suit these conditions and design criteria. As per
    49 KB (7,967 words) - 12:41, 27 February 2024
  • <div id="601.03.B.7"></div> :: '''7.''' Mixers. Provide Department-approved batch mixers meeting the require
    36 KB (5,127 words) - 13:21, 26 July 2022
  • ...the burner flame. No matter what type of plant is being used, several key items should be monitored. <center>7</center>
    139 KB (21,114 words) - 15:08, 30 January 2024
  • ...rease the service of the bridge. The [http://www.michigan.gov/mdot/0,4616,7-151-9622_11044_11367-243045--,00.html MDOT Project Scoping Manual] offers e ...is typically not shown on the plans, but rather quantified in contract pay items. Deck patching involves sounding and marking areas of concrete removal, saw
    84 KB (13,299 words) - 11:46, 19 January 2022

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)