Search results

Jump to navigation Jump to search
  • ...ction/index.php/E-Construction#e-Construction.2FPaper_File_System Division 1 e-construction tables]. The element sequence and general format are as fo [[File:Naming image 1.jpg]]
    57 KB (6,809 words) - 11:51, 1 May 2024
  • ::* Supplemental unemployment benefit programs ...the contractor’s breakdown, contact the Construction Field Services (CFS) Division’s Prevailing Wage Compliance Specialist.
    63 KB (9,521 words) - 14:09, 1 April 2024
  • ...nd documentations shall be in accordance to the Materials Source Guide and supplemental Manuals. ...rocess for structural products to be accepted in accordance with Section 1.1.7 of the Structural Fabrication Quality Manual.
    19 KB (2,827 words) - 15:38, 2 April 2024
  • ...n and testing, using the Quality Control Plan Check Sheet ('''''Figure 604-1'''''). <center>'''S = Square Root {[Σ(x-ẋ)2] / (n-1)}'''</center>
    30 KB (4,172 words) - 17:23, 3 January 2024
  • ...e cracking than patches with sharp angles or many corners. See Figure 712.1 for an example of an acceptable saw cut and chipping operation. [[File:Fig712.1.png|600px|thumb|center|Figure 712.1 Square the patch to avoid multiple corners as best as possible.]]
    84 KB (13,299 words) - 11:46, 19 January 2022
  • ...le to frost heave, such as silt, will not be placed within the top 3 feet (1 m) of subgrade when constructing embankments. ...und contains more than 0.3 foot (90 mm) of frost within the limits of 1 on 1 slopes spreading outward from the finished shoulders, the frozen material w
    78 KB (12,236 words) - 14:45, 21 September 2023
  • <center>1</center> ...ation of Acceptance by Region materials personnel is required. Figures 602-1 and 602-2 show load transfer assemblies stored on the job site.
    87 KB (13,988 words) - 15:30, 8 May 2024

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)