Search results

Jump to navigation Jump to search
  • [[File:823-4.jpg|600px|thumb|center|'''Figure 4 - Corporation Stop with Double Strap Saddle''']] :* 4-foot level
    18 KB (2,799 words) - 14:01, 27 September 2023
  • ...ust be greater than 40 degrees prior to beginning surface preparation. The 4 hour requirement may be adjusted accordingly to meet the temperature limita [[Category: Division 7]]
    15 KB (2,249 words) - 18:23, 15 February 2024
  • ...s (including water meters) in accordance with Item 2.5.3 and Item 2.5.4 of the NRMCA checklist, or other Department-approved program requirement <div id="601.03.A.4"></div>
    36 KB (5,127 words) - 13:21, 26 July 2022
  • <center><span STYLE="font: 40pt arial;">'''Division 7 Supplemental Information'''</span></center> ...Bridge Decks Concrete Depth Measurements, for all bridge deck pours. See Division 706 of the Construction Manual for a sample form and instructions. Concret
    33 KB (4,932 words) - 16:38, 12 May 2021
  • ...lulam lumber beams. Most beam type superstructures consist of sawn lumber 4 to 8 inches wide and 12 to 18 inches deep, spaced 3 feet or less apart. Th ...ing is important to ensure that the member is correctly placed. See Figure 4 for an example of a product quality mark.
    18 KB (2,669 words) - 16:33, 10 January 2024
  • ...the repairs to be removed. The minimum concrete pavement patch length is 4 feet. However, additional patch length is recommended in faulted pavement s ...raveling or spalling occurs. All edging will be done with a 1/8 inch to 1/4 inch radius along the entire perimeter before texturing.
    23 KB (3,714 words) - 10:16, 13 September 2023
  • [[File:Fig719-4.png|600px|framed|center|Figure 3. Reinforced concrete counterfort semi-grav [[File:Fig719-5.png|600px|framed|center|Figure 4. Reinforced concrete cantilever semi-gravity wall.]]
    9 KB (1,409 words) - 11:48, 19 January 2022
  • ...to work on MDOT roadways. If the vehicle is only successful in placing a 4 and/or 6 inch line, it will be certified to place material on non-freeway r ...e operator was successful in STEP 1 and is successful in placing the four (4) inch line, but unsuccessful at the six (6) inch line width (after three at
    56 KB (7,443 words) - 17:48, 9 October 2023
  • ...e maximum energy is simply the mass of ram X the height of stroke. Example 4,000 Lbs. ram X 10 Ft stroke = 40,000 ft·Lbs. The cushion and other factors ...sin), or special alloyed nylon blocks with aluminum layers. See Figure 705-4 for typical nylon hammer cushions.
    32 KB (5,122 words) - 14:16, 29 February 2024
  • ...ct bracings and other structural members to the steel sheet piling, with 1/4” being the minimum weld size required per table 707-1 of the Standard Spe ...ct bracings and other structural members to the steel sheet piling, with 1/4" being the minimum weld size required per table 707-1 of the Standard Speci
    30 KB (4,732 words) - 15:44, 29 February 2024
  • <center>4</center> <center>4</center>
    21 KB (3,052 words) - 16:41, 22 November 2023
  • ...ersight (S&O) Agreement] detailing the arrangement between FHWA’s Michigan Division and MDOT regarding agency roles and responsibilities with respect to federa ...d forward the contract modification and letter to the Financial Operations Division.
    30 KB (4,182 words) - 18:40, 13 December 2023
  • [[File:Worker Visibility 4 - 01-2020.jpg|275px|Safety Vests]] [[Category:Division 1]]
    13 KB (1,841 words) - 11:18, 13 July 2023
  • * Lasers & Levels (4 foot levels for checking plumb of Posts and/or Uprights) * 4-foot Level: Used for checking plumbness of non-tapered vertical supports/po
    19 KB (2,827 words) - 15:38, 2 April 2024
  • ...ctor does not apply load until the grout reaches a compressive strength of 4,000 psi. [[Category: Division 7]]
    14 KB (2,289 words) - 17:29, 10 April 2023
  • * Muck or clean out bucket – see Figures 4 and 5 for a muck bucket example. [[File:Fig 718-4.png|600px|framed|center|Figure 4. Muck bucket]]
    28 KB (4,324 words) - 11:40, 25 April 2023
  • [[Category:Division 4]]
    16 KB (2,323 words) - 17:47, 12 January 2022
  • [[Category:Division 4]]
    15 KB (2,250 words) - 12:56, 4 October 2023
  • ...hand chipping involves chipping to ¾” below top mat or more (approximately 4” to full depth). This type of patch may be repaired with the LMC; however ...been soaked for at least 12 hours, to exposed concrete surfaces. Place a 4 mil thick layer of polyethylene over the burlap to preserve the moisture in
    84 KB (13,299 words) - 11:46, 19 January 2022
  • ...the contractor’s breakdown, contact the Construction Field Services (CFS) Division’s Prevailing Wage Compliance Specialist. ...in cash, or a combination of the above methods with an explanation in Box (4)(c). If fringe benefits are paid to an approved plan, a detailed breakdown
    63 KB (9,521 words) - 14:09, 1 April 2024

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)