Search results

Jump to navigation Jump to search
  • <center><span STYLE="font: 40pt arial;">'''Division 2 Supplemental Information'''</span></center> :Waste Management Division
    9 KB (1,330 words) - 14:21, 23 September 2021
  • There are 6 types of structures patching mixtures listed in [http://mdotcf.state.mi.us/ [[Category: Division 7]]
    6 KB (791 words) - 11:43, 19 January 2022
  • :6. Local Agency Project Stakeholders&nbsp;&nbsp;(County, city, township, vill [[Category:Division 1]]
    7 KB (1,055 words) - 11:29, 14 July 2020
  • <center>6</center> [[Category: Division 8]]
    6 KB (797 words) - 17:08, 27 March 2023
  • ...evel with earth containing not more than 2 percent fieldstone in excess of 6 inches (150 mm) in diameter. ...tion with earth containing not more than 2 percent fieldstone in excess of 6 inches (150 mm) in diameter.
    10 KB (1,390 words) - 10:07, 13 September 2023
  • ...and shall completely fill the holes. Rivets shall be spaced not more than 6 inches (150 mm) apart circumferentially. In 12 inch (300 mm) diameter pipe ...encountered in the culvert trench, it should be excavated to a minimum of 6 inches (150 mm) below the proposed bottom of the pipe, backfilled with Gran
    15 KB (2,250 words) - 12:56, 4 October 2023
  • ...vailable with the Construction Contracts Unit, Construction Field Services Division. ...of work. Continue to select one of the largest dollar value items in each division of work to include all the following as applicable:
    19 KB (2,779 words) - 17:01, 6 November 2023
  • <center><span STYLE="font: 40pt arial;">'''Division 7 Supplemental Information'''</span></center> ...e coordinated with the Standard Specifications for Construction, Divisions 6 and 7 of the Construction Manual, Special Provision 12SP604B QUALITY CONTRO
    33 KB (4,932 words) - 16:38, 12 May 2021
  • ...for the purpose of records retention) is the date the Financial Operations Division (FOD) does the final billing to FHWA for federal funds. In addition to the | [//{{SERVERNAME}}/images_construction/6/6d/Scan_to_email.pdf Scan to E-mail] || Capturing and E-mailing a photo wit
    12 KB (1,824 words) - 16:49, 18 April 2024
  • Dowels between barrier and base are to be spaced 6 feet (2 m) center to center on each side. Check to see that the base concr [[Category: Division 8]]
    6 KB (929 words) - 11:50, 19 January 2022
  • ...the membrane may be patched with additional membrane material overlapping 6 inches either side of the area to be patched. ...n the shotcrete should be avoided. The nozzleman must keep the nozzle 2 to 6 feet away from the surface and as near as perpendicular to the surface as p
    15 KB (2,249 words) - 18:23, 15 February 2024
  • ...ock or hardpan is encountered, the trench should be excavated a minimum of 6 inches (150 mm) below the proposed bottom of the pipe and backfilled and co ...structure, a minimum opening of the entering pipe’s outside diameter plus 6 inches (150 mm) shall be cut into the receiving structure. A minimum 3 inc
    16 KB (2,323 words) - 17:47, 12 January 2022
  • [[File:Fig711-06.png|200px|thumbnail|right|Figure 6 Bridge Barrier Railing, Thrie Beam Retrofit (Open Parapet Type Bridge Raili [[Category: Division 7]]
    7 KB (1,050 words) - 11:46, 19 January 2022
  • ...ntract Completion Date thru 179 days!! 1st Escalation of Accountability<br>6 Months (180 Days)!! 2nd Escalation of Accountability<br>9 Months (270 Days) [[Category:Division 1]]
    13 KB (1,768 words) - 11:05, 13 July 2023
  • ...foot (3 m) straightedge. Variation of more than 1/4 inch in 10 feet (6 mm in 3 m) must be remedied. [[Category: Division 8]]
    7 KB (988 words) - 10:53, 8 April 2024
  • ...en used in areas subject to future mowing. These areas include a 20 foot (6 m) strip along the top of the foreslope adjacent to the shoulder and everyw 1 on 2 on slopes less than 20 feet (6 m) in height will be seeded and mulched according to methods for treating f
    15 KB (2,398 words) - 13:12, 26 July 2022
  • ...perations Environmental Engineer or the Supervising Engineer of the Design Division’s Utilities Drainage and Roadsides Section. ...termination and resolution will be reached in consultation with the Design Division, the Operations Environmental Engineer, and possibly the Assistant Attorney
    20 KB (3,034 words) - 15:47, 19 January 2022
  • <center>6</center> ...([http://hct591jbosds790/wiki/index.php/File:601.07-1.jpg '''''Figure 601-6''''']) and submitted weekly, or more frequently, as judgment dictates. The
    21 KB (3,052 words) - 16:41, 22 November 2023
  • At locations where the combined depth of retained water or soil is less than 6 feet, the Contractor is to submit the temporary steel sheeting piling, and ...cations where the combined depth of retained water or soil is greater than 6 feet, the Contractor is to submit the temporary steel sheeting piling, and
    30 KB (4,732 words) - 15:44, 29 February 2024
  • ...ovals have been obtained, provide a copy to the Construction Field Service Division Resource Specialist for inclusion into the MiEnviro permit system. On March 6, 2013, the EGLE issued revised procedures for winter construction storm wat
    19 KB (2,830 words) - 17:02, 15 February 2024
  • The Construction Field Services Division (CFS) maintains a recommended procedure guide for damaged coating repair th :EGLE, Waste and Hazardous Material Division
    33 KB (4,797 words) - 11:46, 25 April 2023
  • Intermediate saw cuts, used to reduce slab size more than 6 feet for hauling, should be recorded for payment purposes. Curb sections ...use of a straightedge not exceeding the length of the repair by more than 6 inches. The straightedge will be in contact with the existing pavement whi
    23 KB (3,714 words) - 10:16, 13 September 2023
  • ...on MDOT roadways. If the vehicle is only successful in placing a 4 and/or 6 inch line, it will be certified to place material on non-freeway routes onl :*6 inch x 12 inch Aluminum Plates (6 inch x 16 inch Aluminum Plates for 12 inch Lines)
    56 KB (7,443 words) - 17:48, 9 October 2023
  • ...'See Figure 5 for permitted variations in sectional dimensions, See Figure 6 for permitted variations in straightness. For welded members, see American <center>[[File:714 Fig 6.png|thumb|center|600px|Figure 714-6 - ASTM A6 permitted variations in straightness]]</center>
    19 KB (2,733 words) - 11:47, 19 January 2022
  • :* 6-foot stick ruler [[File:823-6.jpg|600px|thumb|center|'''Figure 6 - Laying Pipe in Trench''']]
    18 KB (2,799 words) - 14:01, 27 September 2023
  • * Rock core barrel – see Figure 6 for a rock core barrel example. [[File:Fig 718-6.png|600px|framed|center|Figure 6. Soft rock core barrel]]
    28 KB (4,324 words) - 11:40, 25 April 2023
  • .../project engineer is notified of all commitments by the Contracts Services Division (CSD). The email notification includes all DBE commitment specifics and whe 6. Any joint check arrangement must be pre-approved by MDOT before the arran
    27 KB (4,137 words) - 14:31, 17 April 2024
  • In accordance with 23 CFR 635.102 and 23 CFR 635.120, FHWA’s Michigan Division has further clarified the definition of major changes as noted below: 6. Any [[Construction_Value_Engineering_Change_Proposal_(VECP).|Value Enginee
    50 KB (7,380 words) - 16:11, 1 April 2024
  • [[File:Fig 705-6.png|thumb|center|600px|Figure 705-2b - Typical conical pile pile points]] ...re prebored to the elevations shown on the plans, and the hole diameter is 6 inches greater than the pile dimensions. Preboring also includes the follo
    32 KB (5,122 words) - 14:16, 29 February 2024
  • <center>6</center> ...emblies when they are to be stored on site for extended periods (more than 6 months).
    58 KB (9,258 words) - 17:27, 24 April 2024
  • <div id="601.03.B.6"></div> :: '''6.''' Water Measuring Equipment. Measure water by volume or weight. If
    36 KB (5,127 words) - 13:21, 26 July 2022
  • [[File:706-6.png|800px|thumb|center|'''Figure 706-6 - Lifting Epoxy Coated Rebar with Spreader Device''']] ...for beam spacings less than 9 feet and at approximately the 1/6, 1/2 and 5/6 points for beam spacings 9 feet and over.
    49 KB (7,967 words) - 12:41, 27 February 2024
  • ...alibrated at the beginning of each year (typically early spring) and every 6 months during the project if necessary. It is important to note that truck ...art-width construction, no scarifying or chipping will be conducted within 6 feet of newly cast overlays until the newly cast material has cured for at
    84 KB (13,299 words) - 11:46, 19 January 2022
  • ...taining the actual beam elevations. (See [[701 - Portland Cement Concrete|Division 7]] of this manual for more on structure elevations.) ...ric curves, the key becomes the radius (no longer use D), ('''''Figure 104-6.''''')
    201 KB (30,214 words) - 14:43, 19 June 2017
  • Reduce vegetation to a height of approximately 6 inches (150 mm) and remove all litter or foreign material. Topsoil should Where embankments are to be placed on existing side slopes steeper than 1 on 6, cut horizontal 3 foot (1 m) benches into the slope.
    78 KB (12,236 words) - 14:45, 21 September 2023
  • ...percentage of horizontal distance. (Example: 6 percent grade - 6 inches (6 m) of elevation change in 100 feet (100 m) of horizontal longitudinal run). ...r term for “mat”, usually used in conjunction with a thickness, such as “a 6 inch (150 mm) mat was laid in [3] 2 inch (50 mm) lifts”.
    139 KB (21,114 words) - 15:08, 30 January 2024
  • ...the contractor’s breakdown, contact the Construction Field Services (CFS) Division’s Prevailing Wage Compliance Specialist. ...nt masons, PLAS0514-001); laborers (form/line setters, LABO0465-001, Group 6); laborers (unskilled laborers, LABO0465-001, Group 1); and operators (if u
    63 KB (9,521 words) - 14:09, 1 April 2024

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)