Search results

Jump to navigation Jump to search
  • ...by specification. The storm sewer must be accompanied by the manufacturer’s certification, tested stock reports, or other requirements as specified in * Manufacturer’s name or trademark.
    16 KB (2,323 words) - 17:47, 12 January 2022
  • ...TAGED BUSINESS ENTERPRISES (DBE’s)|DISADVANTAGED BUSINESS ENTERPRISES (DBE’s)]]== DBE’s are defined as those prime and subcontractors, truckers, materials supplier
    27 KB (4,137 words) - 14:31, 17 April 2024
  • The old saying “Safety is Everyone’s Business” is certainly true on an HMA paving project. Communication is o Safety is everyone’s business on a construction project and there is further discussion of this
    139 KB (21,114 words) - 15:08, 30 January 2024
  • ...ructural Fabrication Unit of Bridge Field Services oversees the department’s QA program for fabrication of structural steel, and should be consulted for ...ge Design Manual]. Figure 707.1-1 and Figure 707.1-2 below summarize MDOT’s electronic shop drawing review process and provides a listing of shop drawi
    45 KB (7,017 words) - 13:22, 26 July 2022
  • ...tractor elects to use a barge(s) as false decking over waterways the barge(s) must at least remain in place until the entire concrete deck has completed Form rod’s, tie size and spacing are generally the Contractor’s responsibility, but consideration must be given to pressures exerted agains
    49 KB (7,967 words) - 12:41, 27 February 2024
  • ...h marks, etc.) and each book numbered for cross-referencing. The Engineer's name, address and phone number are to be placed on the first page in case t ...instrument type and crew chief’s signature are to be listed with each day's notes. Errors should have a line drawn through them, or the word "void" pr
    201 KB (30,214 words) - 14:43, 19 June 2017
  • ...el sheet piling. General certifications can be in the form of manufacturer’s catalog cuts identifying the sections being used. ...meets or exceeds the material requirements as specified in the Contractor’s design. The following should be checked at a minimum:
    30 KB (4,732 words) - 15:44, 29 February 2024
  • ...it is striking the number of blows per minute as shown in the manufacturer's catalog. If a hammer will not develop its rated number of blows at bearing, ...the blows per minute and applies the rate to the freefall equation (32 ft/s²). The application accounts for both an action (drop) and a reaction (rebo
    32 KB (5,122 words) - 14:16, 29 February 2024
  • ...r (7 sack) mix or Grade D may be substituted for the LMC with the Engineer’s approval. ...ponsibility to contact BFS and schedule a field calibration of their truck(s). BFS will provide the necessary documentation to the engineer and provide
    84 KB (13,299 words) - 11:46, 19 January 2022

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)