Search results

Jump to navigation Jump to search
  • <center>6</center> ...emblies when they are to be stored on site for extended periods (more than 6 months).
    58 KB (9,258 words) - 17:27, 24 April 2024
  • <div id="601.03.B.6"></div> :: '''6.''' Water Measuring Equipment. Measure water by volume or weight. If
    36 KB (5,127 words) - 13:21, 26 July 2022
  • [[File:706-6.png|800px|thumb|center|'''Figure 706-6 - Lifting Epoxy Coated Rebar with Spreader Device''']] ...for beam spacings less than 9 feet and at approximately the 1/6, 1/2 and 5/6 points for beam spacings 9 feet and over.
    49 KB (7,967 words) - 12:41, 27 February 2024
  • ...alibrated at the beginning of each year (typically early spring) and every 6 months during the project if necessary. It is important to note that truck ...art-width construction, no scarifying or chipping will be conducted within 6 feet of newly cast overlays until the newly cast material has cured for at
    84 KB (13,299 words) - 11:46, 19 January 2022
  • ...taining the actual beam elevations. (See [[701 - Portland Cement Concrete|Division 7]] of this manual for more on structure elevations.) ...ric curves, the key becomes the radius (no longer use D), ('''''Figure 104-6.''''')
    201 KB (30,214 words) - 14:43, 19 June 2017
  • Reduce vegetation to a height of approximately 6 inches (150 mm) and remove all litter or foreign material. Topsoil should Where embankments are to be placed on existing side slopes steeper than 1 on 6, cut horizontal 3 foot (1 m) benches into the slope.
    78 KB (12,236 words) - 14:45, 21 September 2023
  • ...percentage of horizontal distance. (Example: 6 percent grade - 6 inches (6 m) of elevation change in 100 feet (100 m) of horizontal longitudinal run). ...r term for “mat”, usually used in conjunction with a thickness, such as “a 6 inch (150 mm) mat was laid in [3] 2 inch (50 mm) lifts”.
    139 KB (21,114 words) - 15:08, 30 January 2024
  • ...the contractor’s breakdown, contact the Construction Field Services (CFS) Division’s Prevailing Wage Compliance Specialist. ...nt masons, PLAS0514-001); laborers (form/line setters, LABO0465-001, Group 6); laborers (unskilled laborers, LABO0465-001, Group 1); and operators (if u
    63 KB (9,521 words) - 14:09, 1 April 2024

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)