Search results

Jump to navigation Jump to search
  • ...be required of all Contractors having a contract which is funded in whole or in part with federal funds. The Contractor may, after award, request a waiver or modification of the DBE participation goal. The Contractor must submit evid
    27 KB (4,137 words) - 14:31, 17 April 2024
  • ...mpactive effort would only drive the backfill into the remaining material, or where it is not desirable to impound water in impervious soils that would t ...ground is not a pay item in this instance. Density tests are required for documentation.
    7 KB (1,044 words) - 10:08, 13 September 2023
  • ...equipment when inside containments or when exposed to dust containing lead or solvent and paint fumes. At a minimum, MDOT is required to provide a medica ...l notify the Engineer of the employee’s test results if the results are at or above 15 µg/dL.
    33 KB (4,797 words) - 11:46, 25 April 2023
  • ==BRIDGE CONSTRUCTION AND BRIDGE DECK CONSTRUCTION INSPECTION AND DOCUMENTATION== ...rcement, wet and dry bridge deck concrete depth measurements, and required documentation for bridge construction inspection. This document must be coordinated with
    33 KB (4,932 words) - 16:38, 12 May 2021
  • ...dge Elements and Systems (PBES) other than beams, and sound wall posts and/or panels. ...g and refer to whether the strands are tensioned before concrete placement or after concrete placement, respectively.
    27 KB (4,105 words) - 11:45, 19 January 2022
  • ...the past would have been covered with sod are now being treated with mulch or mulch blanket, as well as topsoil, seed and fertilizer. The amount of sod ...be dressed to plan tolerance. Plans will usually show areas requiring sod or mulch blanket. A permit to place should be issued before work begins.
    15 KB (2,398 words) - 13:12, 26 July 2022
  • ...orporated in the work. Materials should be checked for damage in shipment or storage and to insure conformity to the required dimension, appearance and ...duction, manufacture or supplier's storage by the Bureau of Field Services or an appointed representative. The project office should receive the resulti
    15 KB (2,322 words) - 11:43, 19 January 2022
  • ...ssed for any revisions to the contract that alters the nature, scope, cost or schedule of the project. ...fication. Contract revisions may be positive or negative in dollar value, or even have no dollar value associated. The criteria for determining approva
    50 KB (7,380 words) - 16:11, 1 April 2024
  • ...e typically used on MDOT projects, column type supports from below, hanger or suspension type supports from above, and diaphragm types, where the hydraul ...emporary hanger rods are used, reject any rods with notches, nicks, welds, or excessive corrosion. Each length of bar used to make hanger rods must be sa
    14 KB (2,289 words) - 17:29, 10 April 2023
  • ...onduit or pipe that is constructed to convey treated water for consumption or to provide water for emergency services such as Fire Departments. The pipes ...ide of the pipe. Each section of pipe can either come with push-on joints or be bolted mechanically. Note that there may be additional material require
    18 KB (2,799 words) - 14:01, 27 September 2023
  • ...following standard naming convention for naming and organizing electronic documentation created during the administration of state and federally funded constructio '''Format: | FFFF or Variable | XXX | YYYY-MM-DD | XXXX | RX | Variable | XXXXXX'''
    57 KB (6,792 words) - 10:37, 13 May 2024
  • ...may result in heavy vehicles or construction equipment turning on the line or tracking material over a recessed area. ...is includes multiple applications applied in late fall, winter months, and/or early spring prior to durable markings being placed, being mindful of seaso
    56 KB (7,443 words) - 17:48, 9 October 2023
  • ...-ConstructionSoftware@michigan.gov MDOT-ConstructionSoftware@michigan.gov] or the FieldManager Helpdesk email [mailto:FieldManager-Admin@michigan.gov Fie ..., & updated flow chart. Also the threshold for Original Pay Item increase or decrease changed from $25k to $50k||[https://mdotwiki.state.mi.us/construct
    68 KB (8,871 words) - 10:45, 13 May 2024
  • ...ype of joints specified. Pavement includes mainline pavement, base course or concrete shoulders. * Concrete pavement condition survey or project log
    23 KB (3,714 words) - 10:16, 13 September 2023
  • ...perly constructed & installed correctly in the proper location. Misplaced or irregular signs can create a critical hazard to traffic. ...hall be complete and cover all materials which are identified on the plans or in the specifications. The Materials source list and documentations shall b
    19 KB (2,827 words) - 15:38, 2 April 2024
  • ...orkers whose duties are primarily administrative, executive, professional, or clerical, rather than manual. The required contract clauses exerting prevai ...that must be met or exceeded to comply with the requirements. A contractor or subcontractor performing work subject to a DBRA wage determination may sati
    63 KB (9,521 words) - 14:09, 1 April 2024
  • ...ted into the finished work at least 3 feet below the surface of the ground or is entirely under water. ...rent requirements of the National Ready Mixed Concrete Association (NRMCA) or other Department approved certification programs for automatic control and
    36 KB (5,127 words) - 13:21, 26 July 2022
  • ...cify treated timber piles. Foundation piles provide support for the bridge or structure when the existing soils do not provide adequate bearing capacity ...iles are battered no flatter than 3V:1H. This can be increased to 2.5V:1H or even 2V:1H where soil conditions are not good enough to provide sufficient
    32 KB (5,122 words) - 14:16, 29 February 2024
  • ...ons for Construction. Structural steel may be in the form of plate, rolled or bent shapes, hollow structural shapes, tube railing, steel deck grating, mo ...ngs are generally scheduled when the fabrication is more complex in nature or the fabricator is new to working with the Department but can be held for an
    45 KB (7,017 words) - 13:22, 26 July 2022
  • ...be incorporated in the pavement have been approved for use through testing or via pre-approved products lists as required for the contract. Most material ...rify that the assemblies were built in accordance with the standard plans. Documentation of Acceptance by Region materials personnel is required. Figures 602-1 and
    87 KB (13,988 words) - 15:30, 8 May 2024
  • ...rrow material. The Contractor will not remove borrow from the highway ROW or from MDOT-owned excess property unless authorized by the Engineer. Prior t ...remove borrow material from outside the grading limits (and either inside or outside the ROW), a statement disclaiming the quality and usefulness of the
    78 KB (12,236 words) - 14:45, 21 September 2023
  • ...and know how to perform the assigned tasks. Everyone, regardless of title or job function, must be aware of the need for safe work practices. Occupatio ...ed on one side with respect to a reference surface such as an adjacent mat or cut. It is used to match the profile of the edge of a mat to that of the a
    139 KB (21,114 words) - 15:08, 30 January 2024
  • ...ecking into a known elevation; alignment operations, such as bridge layout or sewer staking, are not to be left before checking into known control points ...rs are acceptable. Data generated with data collectors and total stations or GPS units must be downloaded and a hard copy provided. It must be provided
    201 KB (30,214 words) - 14:43, 19 June 2017
  • ...on, grouting, and carbon fiber wrapping. These rehabilitation techniques, or any combination of them, are used to improve the existing condition, and in ...eas of concrete removal, saw cutting the boundaries, hand chipping shallow or hand chipping deep, patch preparation and placing of the new concrete. Dec
    84 KB (13,299 words) - 11:46, 19 January 2022

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)