Search results

Jump to navigation Jump to search
  • ...y=http://mdotwiki.state.mi.us/construction/index.php/Dispute_Review_Board_(DRB)_Procedures Email this Page]</div> ==[[#Dispute Review Board (DRB)|Dispute Review Board (DRB)]]==
    2 KB (249 words) - 15:56, 11 July 2022
  • .../Materials_Quality_Assurance_Procedures_Manual Materials Quality Assurance Procedures Manual]<br /> ...n/index.php/Prevailing_Wage_Oversight_Procedures Prevailing Wage Oversight Procedures]<br />
    7 KB (921 words) - 15:18, 26 July 2022
  • ...ractor and Department in the claim process. The time durations within the procedures are intended to be maximum timeframes with any request for an extension to ...on Construction Engineers will be monitoring and tracking all claims. The procedures for the reporting and tracking of claims are as follows:
    4 KB (643 words) - 12:08, 12 March 2024
  • ...ntents of 810, 819, 820 & 826 to reflect changes in anchor bolt inspection procedures.||[https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanen ...- Contract Revisions]]</center>||Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity.||[http
    67 KB (8,623 words) - 17:18, 11 April 2024
  • Please note that the CMU field review process is for MDOT staff and the links will probably not work for users ou ||<center>12/5/2018</center>|| <center><font color="Red">'''Under Field Review'''</font></center>
    28 KB (3,726 words) - 16:02, 8 March 2023