Search results

Jump to navigation Jump to search
  • ...B.1]. All terrain changes will be defined to appropriately represent the pay item, using the MDOT feature codes. ...all in place measurement items with terrain changes less than or equal to 7% must be calculated horizontally and can be done using the data collector o
    7 KB (1,088 words) - 12:47, 29 January 2024
  • ...onable assurance can be made that the certified material used with the pay items is as specified on the certification document. ...one to one, whenever this is the case. Example: If Guardrail Type B is the pay item, Guardrail Type B would also be the material associated with it, and w
    4 KB (611 words) - 16:09, 25 May 2022
  • ...hen the contractor submits a conceptual or final VECP, it must include all items required by the special provision and Form 1962, Value Engineering Change P ...gh the Construction Operations Engineer in the Construction Field Services Division. The VEDT membership will consist of the following individuals (or their de
    9 KB (1,297 words) - 14:57, 11 October 2022
  • ...ed of reinforced or nonreinforced concrete. [[601 - PCC Pavement Mixtures|Division 6]] of this manual should be referenced for concrete construction. Thickne <center>7 inches (175 mm)</center>
    5 KB (706 words) - 11:49, 19 January 2022
  • ...g agency) seven (7) working days prior to start of construction and seven (7) working days prior to signal activation.” Appropriate contact informati ...contractor of the required additions to the temporary traffic signal, and pay for the retrofit as a contract extra work item with a negotiated extra cost
    9 KB (1,266 words) - 15:59, 2 April 2024
  • ...zing. Also, since these items on bridge or road jobs are some of the last items cast, late season work is likely. ...s. Each coat shall not be less than 1 gallon per 300 square feet (1 L per 7 m<sup>2</sup>).
    6 KB (929 words) - 11:50, 19 January 2022
  • ...vements, structures (except pre-stressed concrete), and associated highway items will be governed by quality assurance. ...fications as a critical concrete QA item, subject to positive and negative pay adjustments. The quality assurance requirements for these fly ash and GGBF
    26 KB (3,908 words) - 11:41, 10 January 2024
  • <center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    67 KB (8,623 words) - 17:18, 11 April 2024
  • ...re concrete mixtures is included in the unit prices for other relevant pay items. 7.0
    12 KB (1,593 words) - 13:11, 26 July 2022
  • ...struction project. Temporary structures also include temporary works type items such as falsework, formwork, work platforms or scaffolding and temporary ea ...y included to cover this work. Check the plans and specifications for pay items, and method of payment.
    19 KB (2,733 words) - 11:47, 19 January 2022
  • ...accounts. The work plan should address at a minimum each of the following items listed below: ...ting any possible impacts to the approved project schedule and controlling items of work.
    41 KB (6,267 words) - 17:31, 6 June 2023
  • <center><span STYLE="font: 40pt arial;">'''Division 7 Supplemental Information'''</span></center> ...dinated with the Standard Specifications for Construction, Divisions 6 and 7 of the Construction Manual, Special Provision 12SP604B QUALITY CONTROL AND
    33 KB (4,932 words) - 16:38, 12 May 2021
  • ....html Materials Source Guide] and the [http://www.michigan.gov/mdot/0,4616,7-151-9622_11044_11367-207980--,00.html Materials Quality Assurance Procedure <center>7</center>
    21 KB (3,052 words) - 16:41, 22 November 2023
  • ...cation. The inspector should check the dimensions of the various hardware items and compare these dimensions with those shown in the plans. The method of ...plans, special provisions, and specifications is required. The following items should be reviewed:
    18 KB (2,669 words) - 16:33, 10 January 2024
  • The pay item for repair of damaged coating covers all damage repairs, but the Contr The Construction Field Services Division (CFS) maintains a recommended procedure guide for damaged coating repair th
    33 KB (4,797 words) - 11:46, 25 April 2023
  • ...moval process notify the Engineer and [http://www.michigan.gov/mdot/0,4616,7-151-9623_26663_56139_56173---,00.html Bridge Field Services]. A repair plan ..., and is not paid for as part of Structural Steel Cleaning and Coating pay items.
    14 KB (2,289 words) - 17:29, 10 April 2023
  • ...s/construction/index.php/E-Construction#e-Construction.2FPaper_File_System Division 1 e-construction tables]. The element sequence and general format are as ...ariable):''' Expressed as a form number (FFFF), document description (e.g. Pay Estimate), common document acronym, or form name.
    57 KB (6,809 words) - 13:43, 25 April 2024
  • <center>7</center> <center>7</center>
    56 KB (7,443 words) - 17:48, 9 October 2023
  • ...the contractor’s breakdown, contact the Construction Field Services (CFS) Division’s Prevailing Wage Compliance Specialist. * Advise all subcontractors of the requirement to pay prevailing wage prior to the commencement of work.
    63 KB (9,521 words) - 14:09, 1 April 2024
  • ...tions for Construction Table 1004-1 in subsection 1004 and note (g) 3- to 7-inch slump for tremie applications without admixture or with Type A or D ad ...ming process. See Figure 704-4 below for the hook and grip type interlock. Pay close attention to interlocks getting jammed easily from soil, and water se
    30 KB (4,732 words) - 15:44, 29 February 2024

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)