Search results

Jump to navigation Jump to search
  • ==[[#LOCAL AGENCY PROJECTS|'''LOCAL AGENCY PROJECTS''']]== ==[[#RAIL PROJECTS|'''RAIL PROJECTS''']]==
    2 KB (163 words) - 15:53, 2 April 2024
  • ...federal dollars shall comply with these federal regulations. Local agency projects with oversight requirements will need to meet federal regulation for federa ...tematic approach as to how we quantify items used the construction of MDOT projects. Construction forces will quantify units in length, area, volume, and weig
    14 KB (2,089 words) - 09:11, 11 April 2024
  • ==[[#Railroad Highway Projects|Railroad Highway Projects]]== ...oad companies, or private industry are the basis for most railroad-highway projects.
    12 KB (1,772 words) - 17:35, 14 December 2023
  • ...will require close cooperation between all forces on highway construction projects so the roadway is signed properly when opened to traffic. All materials for installation on permanent signing projects must meet the requirements
    19 KB (2,827 words) - 15:38, 2 April 2024
  • ...oad issues and associated delays which should be directed to the Office of Rail. Project costs due to utility delays on local agency projects are the responsibility of the Local Agency and are not reimbursable through
    9 KB (1,295 words) - 10:58, 4 May 2022
  • ...r re-drilling. The spacing of the holes for both the scupper bolts and the rail post bolts should be checked for accuracy of alignment. Major changes shoul ...h section 912.03. Surfaces which are to be painted, such as railings and rail posts, should not be coated with preservative. Preservatives should be appl
    18 KB (2,669 words) - 16:33, 10 January 2024
  • Many projects will incorporate steel or composite form materials. Often these are from a On Design-Build projects, it is the responsibility of the contractor’s Geotechnical Engineer to de
    49 KB (7,967 words) - 12:41, 27 February 2024
  • For deck replacement projects, the top flanges and beam ends should be cleaned and coated in accordance w ...overlays, deck patching or substructure patching of bridge rehabilitation projects. LMC may be hand mixed using the mixture proportions provided in [http://m
    84 KB (13,299 words) - 11:46, 19 January 2022
  • ...ividual structural component (footing, column, cap, approach slab, barrier rail, etc…), a single day’s production, or any combination thereof, as deter
    33 KB (4,932 words) - 16:38, 12 May 2021
  • Railroad containment systems must be able to accommodate the rail traffic. The contractor should design a system that can be quickly removed ...Name=1122B.pdf Form 1122B Inspector’s Daily Report] on all bridge painting projects.
    33 KB (4,797 words) - 11:46, 25 April 2023
  • ...depending upon staff availability. All consultant and Contractor staking projects require quality assurance checks at the frequency shown under Consultant/Co ...cked to ensure proper fit along roadway for positive drainage. Grades for projects generated through the computer need to be checked. Contact the Constructio
    201 KB (30,214 words) - 14:43, 19 June 2017