Search results
Jump to navigation
Jump to search
- ...ations-Construction/2020-Standard-Specifications-Construction.pdf#page=814 Section 901 Cement and Lime] ...ations-Construction/2020-Standard-Specifications-Construction.pdf#page=814 Section 902 Aggregates]5 KB (487 words) - 09:41, 13 September 2023
- ...pipe will be subjected to rejection if any defects, noted in the previous section for culvert pipe, are found. In addition, non-reinforced concrete sewer pi <center>36 - 42 (900-1050)</center>16 KB (2,323 words) - 17:47, 12 January 2022
- ...de-subbase contact point. The Standard Plan R-80 series details the cross section elevation of these drains. ...outlet endings is used). The Standard Plan R-80 series calls for 3 foot (900 mm) lengths for the concrete rings and 2 foot (600 mm) lengths have been in6 KB (843 words) - 17:47, 12 January 2022
- ...s_construction/9/95/2020-Standard-Specifications-Construction.pdf#page=541 Section 716.03] of the Standard Specifications for Construction. ...en geotextile fabric. The fabric shall have a minimum width of 36 inches (900 mm) and shall be centered on the joint.15 KB (2,250 words) - 12:56, 4 October 2023
- * Deducting yellow house paint -$900 ...>For all contract modifications bound for a Tier III approval process this section must include a short executive summary of project changes. This summary ca50 KB (7,380 words) - 16:11, 1 April 2024
- Refer to STEP 1 in the Equipment Certification Guidelines section. This test can be run when requested or desired to assure a certified vehi Refer to STEP 2 in the Equipment Certification Guidelines section. This test can be run at any time during production striping to assure a c56 KB (7,443 words) - 17:48, 9 October 2023