Uploads by Lacrossd1
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
07:26, 26 March 2019 | PWise PA 132 Folder Structure.png (file) | 3 KB | 1 | ||
11:24, 24 January 2018 | Hydro Chains1.png (file) | 81 KB | 1 | ||
10:47, 24 January 2018 | Hydro Chains.png (file) | 124 KB | 1 | ||
11:44, 3 October 2016 | BOS Location Image.png (file) | 100 KB | 1 | ||
11:43, 3 October 2016 | CB Shot Location.png (file) | 81 KB | 1 | ||
07:33, 3 October 2016 | Leveling Turning Pin.png (file) | 166 KB | 1 | ||
07:32, 3 October 2016 | Control Network Diagram.png (file) | 122 KB | 1 | ||
07:30, 3 October 2016 | Concrete Monument.png (file) | 43 KB | 1 | ||
15:39, 5 July 2016 | Quality Assurance Certification.docx (file) | 12 KB | Category:Chapter 10 - Deliverables | 1 | |
15:37, 5 July 2016 | Survey Alignment Certification.docx (file) | 12 KB | Category:Chapter 10 - Deliverables | 1 | |
15:33, 5 July 2016 | Surveyors Report Certification.docx (file) | 12 KB | Category:Chapter 10 - Deliverables | 1 | |
16:00, 30 June 2016 | SAMPLE Cert.pdf (file) | 122 KB | updated the basis of bearing | 6 | |
09:46, 14 June 2016 | MDOT Survey Checklist 2014.pdf (file) | 178 KB | Category:Survey Manual Files | 1 | |
08:24, 14 June 2016 | MDOT Survey Standards 2014.pdf (file) | 531 KB | Category:Survey Manual Files | 1 | |
16:03, 6 June 2016 | MDOT Survey QAQC checklist.xlsm (file) | 106 KB | Category:Chapter 10 - Deliverables | 1 | |
07:20, 25 April 2016 | PWise Standard Folder Structure.png (file) | 5 KB | 3 | ||
07:19, 25 April 2016 | PWise Bridge Folder Structure.png (file) | 2 KB | 2 | ||
07:16, 25 April 2016 | PWise Hydro Folder Structure.png (file) | 3 KB | 2 | ||
15:01, 4 April 2016 | MDOT Sample Plans Bridge.pdf (file) | 12.14 MB | 1 | ||
14:58, 4 April 2016 | Archive Sample Plans Bridge.pdf (file) | 4.12 MB | 1 | ||
12:28, 4 April 2016 | EXAMPLE Right of Entry.pdf (file) | 98 KB | typo correction | 3 | |
17:13, 10 March 2016 | TEMPLATE Cert.zip (file) | 90 KB | 3 | ||
17:13, 10 March 2016 | TEMPLATE Cert.pdf (file) | 77 KB | 4 | ||
17:11, 10 March 2016 | SAMPLE Desc and Notes.pdf (file) | 99 KB | 2 | ||
17:06, 10 March 2016 | Visio-Cert Survey Workflow.pdf (file) | 168 KB | 5 | ||
09:24, 2 March 2016 | TEMPLATE Desc and Notes.docx (file) | 32 KB | updated version | 3 | |
16:31, 10 August 2015 | I-75 Interchange Monroe.jpg (file) | 302 KB | 1 | ||
15:35, 20 July 2015 | MDOT Sample Plans Road.pdf (file) | 4.76 MB | 2 | ||
15:03, 18 May 2015 | 0222 Survey Notes Receipt and Transmittal-2015-05.pdf (file) | 992 KB | 1 | ||
15:00, 18 May 2015 | PWISE Submittal Survey Workflow.png (file) | 120 KB | 1 | ||
14:59, 18 May 2015 | Deliverables Accepted.jpg (file) | 167 KB | 1 | ||
14:59, 18 May 2015 | Ready for Review.jpg (file) | 173 KB | 1 | ||
14:59, 18 May 2015 | Project Folder Created.jpg (file) | 173 KB | 1 | ||
14:58, 18 May 2015 | PWise Photo Folder Structure.png (file) | 14 KB | 1 | ||
14:58, 18 May 2015 | PWise MTL Folder Structure.png (file) | 12 KB | 1 | ||
14:57, 18 May 2015 | PWise STLS Folder Structure.png (file) | 7 KB | 1 | ||
14:46, 6 May 2015 | Ambox important.png (file) | 24 KB | 1 | ||
14:16, 4 February 2015 | Files in RID folder.png (file) | 65 KB | Cropped image | 2 | |
15:47, 9 December 2014 | Roadway 3D Modeling Recommendations.pdf (file) | 291 KB | 1 | ||
09:24, 20 October 2014 | Project Data Requirements Table.xlsx (file) | 214 KB | 8 | ||
07:46, 25 September 2014 | ProjectWise RID file location.png (file) | 5 KB | 1 | ||
16:21, 24 September 2014 | ProjectWise RID Preliminary file location.png (file) | 5 KB | 1 | ||
16:20, 24 September 2014 | ProjectWise RID OEC file location.png (file) | 4 KB | 1 | ||
14:51, 9 September 2014 | M-139 Over The St Joe.png (file) | 63 KB | 1 | ||
06:53, 9 September 2014 | Logo.jpg (file) | 45 KB | 1 | ||
15:59, 8 September 2014 | RID Files and Naming Conventions.docx (file) | 168 KB | 1 | ||
09:50, 4 September 2014 | 3DM FIG2-4-1.png (file) | 42 KB | 1 |