Search results

Jump to navigation Jump to search
  • |pc2 = All edits by users who are not reviewers or administrators are subject to review ...eta/pagetype}} by [[Wikipedia:User access levels#Autoconfirmed_users|new]] or [[Wikipedia:User access levels#Anonymous_users|unregistered]] users is curr
    9 KB (1,028 words) - 09:28, 3 July 2014
  • ...ade mix designs and provide them to the Engineer along with the supporting documentation (temperature, slump, air content and compressive strength) from each trial ...pecifications include either non-standard (MDOT specified) concrete mixes, or ones that are known to generate compressive strengths substantially higher
    26 KB (3,908 words) - 11:41, 10 January 2024
  • ...and diligent in promptly submitting material documentation and supporting documentation per the specifications and special provisions in the contract. If they have #The contractor should have a quality assurance check on documentation submittals to ensure that the submittals are in the correct format with ide
    28 KB (4,153 words) - 15:37, 11 January 2024
  • <center><span STYLE="font: 40pt arial;">'''Underground or Above Ground Fuel Storage Tanks'''</span></center> ...and Technology Environmental Compliance Group by telephone at 517-322-1205 or Fax at 517-322-5664. Other backup numbers to call are 517-322-1647 and 517
    9 KB (1,344 words) - 10:51, 16 May 2024
  • ...ls used in MDOT’s construction and maintenance projects must be tested and/or approved before incorporation into the project. Materials are approved bas Proprietary materials or products previously evaluated and approved by C&T. Approved materials and
    21 KB (3,052 words) - 16:41, 22 November 2023
  • ...and understanding the Contractor's work with other projects working within or near the contract limits. * Is required to resolve construction disputes and/or claims concerning contract time.
    8 KB (1,206 words) - 14:27, 29 February 2024
  • ...ers directly at the construction sites and later transferred to a network, or desktop computer, located in the field office responsible for managing the ...er and FieldBook Tutorials, FieldManager User’s Guide, Trns*port interface or technical questions, please contact the Help Desk [mailto:MDOT-Construction
    25 KB (3,668 words) - 12:17, 1 May 2024
  • ...-of-way (ROW) agreements should also be checked for any special provisions or agreements. ...n on the plans. Stumps and roots need not be removed from peat excavation or disposal areas. Stumps may be buried with a minimum cover of 2 feet (700 m
    8 KB (1,133 words) - 12:01, 28 March 2023
  • ...not reasonably be determined, the work starts before prices are negotiated or other payment methods for compensation are impractical. Any work started b ...eer must approve the additional work (Approval can be documented on an IDR or an e-mail).
    41 KB (6,267 words) - 17:31, 6 June 2023
  • ...nstruction and maintenance projects by the department, railroad companies, or private industry are the basis for most railroad-highway projects. ...ment, field, and operations personnel to facilitate safety recommendations or activities related to proposed projects. Non-trunkline on-site inspections
    12 KB (1,772 words) - 17:35, 14 December 2023
  • MDOT will not sample, nor test for quality control or assist in controlling the Contractor’s production operations. However, c ...Engineer records of QC tests and inspections within 24 hours after testing or inspection in a format acceptable to the Engineer.
    30 KB (4,172 words) - 17:23, 3 January 2024
  • Progress clause documentation must also take this 12 month acceptance period into account for final proje ...imes associated with unique special provisions where certain manufacturers or products are specified. More information regarding steel superstructure is
    14 KB (2,146 words) - 13:54, 29 November 2023
  • <b>Local Public Agency (LPA):</b> The Michigan Public Act 51 city, village, or county road commission/department who applied, thru MDOT, for funds to perf ...te project signatory responsibilities to MDOT staff of an equivalent level or higher.
    30 KB (4,182 words) - 18:40, 13 December 2023
  • ...the Michigan Standard Plans or Special Details are "Standard Plan R-##-A" or "Special Detail ##". '''Type 2:''' Slight technical change or impacts more than one division of the CM. This will be distributed by the
    10 KB (1,538 words) - 12:26, 22 August 2022
  • ...treams. Any work below the ordinary high-water elevation of an inland lake or stream requires an Inland Lakes and Streams Permit. ...ny construction, enlargement, repair, reconstruction, alteration, removal, or abandonment of any dam requires a Dam Safety Permit.
    19 KB (2,830 words) - 17:02, 15 February 2024
  • ...Engineer. The Engineer has 30 days to address all deficiencies and submit documentation once the Final Project Review Report is received. ...details are fresh and personnel are readily available. When all work and documentation is complete then the Final Project Review can be completed.
    16 KB (2,430 words) - 15:46, 6 May 2021
  • ...be required of all Contractors having a contract which is funded in whole or in part with federal funds. The Contractor may, after award, request a waiver or modification of the DBE participation goal. The Contractor must submit evid
    27 KB (4,137 words) - 14:31, 17 April 2024
  • ...mpactive effort would only drive the backfill into the remaining material, or where it is not desirable to impound water in impervious soils that would t ...ground is not a pay item in this instance. Density tests are required for documentation.
    7 KB (1,044 words) - 10:08, 13 September 2023
  • ...equipment when inside containments or when exposed to dust containing lead or solvent and paint fumes. At a minimum, MDOT is required to provide a medica ...l notify the Engineer of the employee’s test results if the results are at or above 15 µg/dL.
    33 KB (4,797 words) - 11:46, 25 April 2023
  • ==BRIDGE CONSTRUCTION AND BRIDGE DECK CONSTRUCTION INSPECTION AND DOCUMENTATION== ...rcement, wet and dry bridge deck concrete depth measurements, and required documentation for bridge construction inspection. This document must be coordinated with
    33 KB (4,932 words) - 16:38, 12 May 2021

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)