User contributions
Jump to navigation
Jump to search
- 10:09, 30 November 2015 diff hist +265 Main Page
- 16:11, 24 November 2015 diff hist -39 Main Page
- 16:10, 24 November 2015 diff hist 0 N File:BridgeslideM100.jpg current
- 16:09, 24 November 2015 diff hist -99 Main Page
- 16:06, 24 November 2015 diff hist 0 N File:M231 Ottawa County.jpg current
- 16:02, 24 November 2015 diff hist -26 Main Page
- 09:56, 24 November 2015 diff hist 0 N File:Auburn Hills DDI.jpg current
- 09:13, 21 October 2015 diff hist +207 Main Page →Recent Minor Changes
- 15:33, 15 October 2015 diff hist -2 Local Agency Program (LAP) →FIELDMANAGER READ-ONLY FILES FOR LOCAL AGENCY AND CONSULTANT PROJECT
- 15:31, 15 October 2015 diff hist +2 Local Agency Program (LAP) →Verifying Participating/Non-Participating Costs
- 15:29, 15 October 2015 diff hist -484 Local Agency Program (LAP) →Project Administration MDOT-Let Local Agency Projects
- 09:51, 2 October 2015 diff hist +250 Main Page →Recent Major Changes
- 15:15, 28 September 2015 diff hist +134 E-Signature →What is digital Signature Validation and why does it matter?
- 15:06, 28 September 2015 diff hist +9 FieldManager →Documentation of Inspector Daily Reports
- 15:06, 28 September 2015 diff hist +1,736 FieldManager →Inspector's Daily Report (IDR)
- 15:27, 14 September 2015 diff hist +258 Main Page →Recent Minor Changes
- 13:11, 20 July 2015 diff hist +443 Main Page →Recent Minor Changes
- 09:36, 12 June 2015 diff hist +43 N File:MDOT IM15-02 FlowChart 491553 7.pdf Flowchart for Claims process BOH-IM 2015-02 current
- 10:55, 19 May 2015 diff hist +235 Main Page →Recent Minor Changes
- 10:52, 19 May 2015 diff hist -5 Local Agency Program (LAP) →Project Administration MDOT-Let Local Agency Projects
- 10:51, 19 May 2015 diff hist +163 Local Agency Program (LAP) →Project Administration MDOT-Let Local Agency Projects
- 11:35, 8 May 2015 diff hist -4,267 603 - Concrete Pavement Restoration →Dowel Bar Retrofit (DBR)
- 11:34, 8 May 2015 diff hist -515 603 - Concrete Pavement Restoration →Swiss Hammer
- 11:33, 8 May 2015 diff hist -18 603 - Concrete Pavement Restoration →Transverse Joints
- 11:32, 8 May 2015 diff hist -263 603 - Concrete Pavement Restoration →Pavement Reinforcement
- 11:29, 8 May 2015 diff hist -418 602 - Concrete Pavement Construction →Transverse Joints
- 11:29, 8 May 2015 diff hist -65 602 - Concrete Pavement Construction →Sawing and Sealing Joints/Longitudinal Joints
- 11:28, 8 May 2015 diff hist -116 602 - Concrete Pavement Construction →Form Paving
- 11:28, 8 May 2015 diff hist +7 602 - Concrete Pavement Construction →Form Paving
- 11:27, 8 May 2015 diff hist +440 602 - Concrete Pavement Construction →Header Joints
- 11:22, 8 May 2015 diff hist -61 602 - Concrete Pavement Construction →Header Joints
- 11:21, 8 May 2015 diff hist -14 602 - Concrete Pavement Construction →Concrete Pavement, Unbonded Overlay
- 11:21, 8 May 2015 diff hist +11 602 - Concrete Pavement Construction →Production Paving Projects
- 11:20, 8 May 2015 diff hist +1 602 - Concrete Pavement Construction →Minimum Project Requirements
- 11:19, 8 May 2015 diff hist 0 602 - Concrete Pavement Construction →Acceptance of Materials
- 11:18, 8 May 2015 diff hist +3 602 - Concrete Pavement Construction →Acceptance of Materials
- 11:18, 8 May 2015 diff hist +97 602 - Concrete Pavement Construction →Acceptance of Materials
- 13:58, 4 May 2015 diff hist +215 Main Page →Recent Major Changes
- 15:11, 30 March 2015 diff hist +8 812 - Temporary Traffic Control for Construction Zone Operations →Freeway Work Zone Design Guidance
- 15:11, 30 March 2015 diff hist +969 812 - Temporary Traffic Control for Construction Zone Operations →GENERAL
- 15:07, 30 March 2015 diff hist +15 Main Page →Recent Minor Changes
- 15:04, 30 March 2015 diff hist +173 Main Page →Recent Minor Changes
- 14:59, 30 March 2015 diff hist +2,019 E-Construction →e-Construction File System
- 08:33, 20 March 2015 diff hist -52 819 - Electrical and Lighting →MATERIALS
- 08:32, 20 March 2015 diff hist +208 Main Page →Recent Major Changes
- 07:47, 20 March 2015 diff hist +23 819 - Electrical and Lighting →Electrical and Lighting Conduit
- 11:24, 19 March 2015 diff hist +990 819 - Electrical and Lighting →MATERIALS
- 09:14, 11 March 2015 diff hist +61 Local Agency Program (LAP) →LOCAL AGENCY COST REIMBURSEMENT FOR LIQUIDATED DAMAGES
- 09:11, 11 March 2015 diff hist +4,100 Local Agency Program (LAP)
- 08:57, 11 March 2015 diff hist +1 Local Agency Program (LAP) →PROJECT ADMINISTRATION: ECONOMIC DEVELOPMENT DIRECT GRANT PROJECTS
- 08:55, 11 March 2015 diff hist 0 Local Agency Program (LAP) →DEFINITIONS
- 09:16, 6 March 2015 diff hist +364 811 - Permanent Pavement Markings →CONSTRUCTION
- 10:37, 5 March 2015 diff hist 0 811 - Permanent Pavement Markings →UNIFORM PRICE ADJUSTMENT, REGULAR DRY PAINT AND LOW TEMPERATURE WATERBORNE PAINT
- 10:30, 5 March 2015 diff hist +8 E-Signature →What is digital Signature Validation and why does it matter?
- 12:30, 4 March 2015 diff hist -52 Main Page →Recent Major Changes
- 12:29, 4 March 2015 diff hist +309 Main Page →Recent Major Changes
- 12:26, 4 March 2015 diff hist +240 Main Page →Recent Major Changes
- 12:07, 4 March 2015 diff hist +22 N File:ITS Submittals List.pdf List of ITS Submittals current
- 15:12, 18 February 2015 diff hist -101 Main Page →Recent Major Changes
- 11:04, 17 February 2015 diff hist +240 Main Page →Recent Major Changes
- 10:51, 17 February 2015 diff hist +175 815 - Landscaping →Unacceptable Plants
- 12:25, 8 January 2015 diff hist +3 E-Construction →Construction Documentation Standard Naming Conventions for e-Construction
- 16:57, 18 November 2014 diff hist -41 MediaWiki:Sidebar
- 10:49, 14 November 2014 diff hist +55 719 - Earth Retaining Structures →GENERAL
- 10:47, 14 November 2014 diff hist +34 719 - Earth Retaining Structures
- 10:46, 14 November 2014 diff hist -9,326 718 - Drilled Shafts
- 10:28, 14 November 2014 diff hist +9,324 N 719 - Earth Retaining Structures Created page with " <center><span STYLE="font: 60pt arial;">'''719'''</span></center> <center><span STYLE="font: 40pt arial;">'''Earth Retaining Structures'''</span></center> <center>[http://m..."
- 10:25, 14 November 2014 diff hist +69 MediaWiki:Sidebar
- 16:33, 10 November 2014 diff hist +213 Disadvantaged Business Enterprises (DBE) →DBE Commercially Useful Function (CUF) Requirements
- 16:28, 10 November 2014 diff hist +60 Disadvantaged Business Enterprises (DBE) →Joint Checks
- 16:27, 10 November 2014 diff hist +61 Disadvantaged Business Enterprises (DBE) →DBE Documentation
- 16:25, 10 November 2014 diff hist +9 Disadvantaged Business Enterprises (DBE) →Disadvantages Business Enterprises (DBE)
- 15:23, 30 October 2014 diff hist +3 811 - Permanent Pavement Markings →Pavement Marking Inspection Frequently Asked Questions
- 15:22, 30 October 2014 diff hist -6 811 - Permanent Pavement Markings →Field Inspection and Processing of Progress Payments
- 15:18, 29 October 2014 diff hist +113 707 - Structural Steel →Project Scheduling
- 10:46, 21 October 2014 diff hist +1 E-Signature →Adoption at MDOT and Acceptable Uses
- 10:45, 21 October 2014 diff hist +7 E-Signature →Adoption at MDOT and Acceptable Uses
- 10:42, 21 October 2014 diff hist +20 E-Signature →Adoption at MDOT and Acceptable Uses
- 10:41, 21 October 2014 diff hist -82 m E-Signature Reverted edits by Greenes2 (talk) to last revision by Guyona
- 10:23, 21 October 2014 diff hist -69 E-Signature →Adoption at MDOT and Acceptable Uses
- 07:52, 20 October 2014 diff hist 0 E-Construction
- 09:36, 16 October 2014 diff hist +3 Main Page →Recent Major Changes
- 14:03, 10 October 2014 diff hist +3,772 m Main Page Reverted edits by ShaneBoard (talk) to last revision by Greenes2
- 15:02, 25 September 2014 diff hist +173 Main Page →Recent Major Changes
- 14:59, 25 September 2014 diff hist -115 811 - Permanent Pavement Markings
- 14:58, 25 September 2014 diff hist +14 811 - Permanent Pavement Markings
- 14:57, 25 September 2014 diff hist +14 811 - Permanent Pavement Markings →Pavement Marking Materials
- 14:15, 23 September 2014 diff hist +1 811 - Permanent Pavement Markings →Durable Pavement Markings
- 11:28, 23 September 2014 diff hist +93 811 - Permanent Pavement Markings →Plate Sampling
- 11:27, 23 September 2014 diff hist +53 811 - Permanent Pavement Markings
- 11:26, 23 September 2014 diff hist +63 811 - Permanent Pavement Markings
- 11:24, 23 September 2014 diff hist +2 811 - Permanent Pavement Markings →Moisture Test
- 11:24, 23 September 2014 diff hist -4 811 - Permanent Pavement Markings →Material and Field Testing
- 11:23, 23 September 2014 diff hist -2 811 - Permanent Pavement Markings →Bead Drop Test
- 11:22, 23 September 2014 diff hist +44,958 811 - Permanent Pavement Markings
- 09:41, 23 September 2014 diff hist 0 N File:1165 Health and Safety Example 1.pdf.png current
- 09:32, 23 September 2014 diff hist 0 N File:1165 Contract Compliance Example 1.png current
- 14:01, 22 September 2014 diff hist -5 E-Construction →Project Records
- 10:59, 22 September 2014 diff hist -801 m 702 - Mortar and Grout Reverted edits by Greenes2 (talk) to last revision by HarrisR18
- 10:52, 22 September 2014 diff hist -48 Main Page
- 10:51, 22 September 2014 diff hist +36 N File:The 96 Fix Grand OpeningCelebration.jpg The 96 Fix Grand Opening Celebration current
- 15:55, 18 September 2014 diff hist +159 Main Page →Recent Minor Changes
- 15:51, 18 September 2014 diff hist +3 304 - Rubbilizing Existing PCC Pavement →MATERIALS
- 13:58, 18 September 2014 diff hist -24 603 - Concrete Pavement Restoration
- 13:58, 18 September 2014 diff hist -24 602 - Concrete Pavement Construction
- 13:46, 18 September 2014 diff hist +25 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes →GENERAL
- 13:38, 18 September 2014 diff hist +18 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes →Overlay Mixtures
- 13:37, 18 September 2014 diff hist -1 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes →MATERIALS
- 13:36, 18 September 2014 diff hist +858 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes →MATERIALS
- 13:29, 18 September 2014 diff hist +214 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes
- 13:27, 18 September 2014 diff hist +668 702 - Mortar and Grout →MATERIALS
- 13:22, 18 September 2014 diff hist +3 702 - Mortar and Grout →Expansive Grout, Type E-1
- 13:21, 18 September 2014 diff hist -3 702 - Mortar and Grout →Standard Mortars and Grouts]
- 13:20, 18 September 2014 diff hist +133 702 - Mortar and Grout →702.03 MIXTURE REQUIREMENTS
- 16:02, 16 September 2014 diff hist +8 701 - Portland Cement Concrete for Structures →Concrete Quality Control and Quality Assurance
- 16:02, 16 September 2014 diff hist +8 701 - Portland Cement Concrete for Structures →QA Sampling and Testing
- 16:00, 16 September 2014 diff hist -62 701 - Portland Cement Concrete for Structures →Mixes Using Fly Ash or Slag Cement
- 15:56, 16 September 2014 diff hist +9 701 - Portland Cement Concrete for Structures →Aggregate
- 15:55, 16 September 2014 diff hist +3,399 701 - Portland Cement Concrete for Structures →CONSTRUCTION
- 15:54, 16 September 2014 diff hist -3,416 701 - Portland Cement Concrete for Structures →Concrete Quality Control and Quality Assurance
- 15:53, 16 September 2014 diff hist +68 701 - Portland Cement Concrete for Structures →ADMIXTURES
- 15:52, 16 September 2014 diff hist +246 701 - Portland Cement Concrete for Structures
- 15:50, 16 September 2014 diff hist +39 701 - Portland Cement Concrete for Structures →CONCRETE MIXTURE REQUIREMENTS
- 15:50, 16 September 2014 diff hist +75 701 - Portland Cement Concrete for Structures →Batch Mixing
- 15:47, 16 September 2014 diff hist +39 701 - Portland Cement Concrete for Structures →READY-MIXED CONCRETE
- 15:46, 16 September 2014 diff hist +37 701 - Portland Cement Concrete for Structures →STOCKPILING
- 15:45, 16 September 2014 diff hist -1 701 - Portland Cement Concrete for Structures →GENERAL
- 15:44, 16 September 2014 diff hist +60 701 - Portland Cement Concrete for Structures →GENERAL
- 15:42, 16 September 2014 diff hist +44 701 - Portland Cement Concrete for Structures →GENERAL
- 15:40, 16 September 2014 diff hist +337 701 - Portland Cement Concrete for Structures
- 15:37, 16 September 2014 diff hist +118 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes
- 15:20, 16 September 2014 diff hist 0 N File:Construction Guidance for Pavement Marking Projects.pdf current
- 14:49, 16 September 2014 diff hist +135 E-Signature →General Information
- 14:45, 16 September 2014 diff hist +7 E-Signature →Resources
- 14:45, 16 September 2014 diff hist +9 E-Signature →Guidance for Non-MDOT Users
- 11:03, 5 September 2014 diff hist +23 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes →703.03 EQUIPMENT
- 10:45, 5 September 2014 diff hist -17 701 - Portland Cement Concrete for Structures →701.01 GENERAL
- 10:44, 5 September 2014 diff hist +42 701 - Portland Cement Concrete for Structures →701.01 GENERAL
- 10:35, 5 September 2014 diff hist +119 701 - Portland Cement Concrete for Structures
- 10:34, 5 September 2014 diff hist -37 702 - Mortar and Grout
- 10:29, 5 September 2014 diff hist +18 702 - Mortar and Grout
- 13:25, 4 September 2014 diff hist +30 MediaWiki:Sidebar
- 15:23, 2 September 2014 diff hist -3 E-Construction →Resources
- 15:23, 2 September 2014 diff hist -3 E-Construction →Resources
- 10:45, 2 September 2014 diff hist +100 E-Construction →General Information
- 10:42, 2 September 2014 diff hist +30 E-Construction →General Information
- 13:13, 8 August 2014 diff hist +10 Main Page →Recent Major Changes
- 15:27, 7 August 2014 diff hist +15 N File:E-sign brochure.pdf E-sign brochure current
- 15:15, 9 July 2014 diff hist +63 707 - Structural Steel →Project Scheduling
- 15:03, 9 July 2014 diff hist -2 707 - Structural Steel →Project Scheduling
- 11:23, 9 July 2014 diff hist -2 707 - Structural Steel →Project Scheduling
- 08:02, 9 July 2014 diff hist -1 715 - Cleaning and Coating Existing Structural Steel →Structural Steel Surface Abrasive Blasting Requirements
- 08:01, 9 July 2014 diff hist +59 N File:Fig715-02.jpg Figure 715-02 Near white blasted steel surface (SSPC-SP10). current
- 15:59, 8 July 2014 diff hist +103 715 - Cleaning and Coating Existing Structural Steel →Inspector’s Daily Report for Bridge Painting
- 15:59, 8 July 2014 diff hist -41 715 - Cleaning and Coating Existing Structural Steel →Forms
- 15:58, 8 July 2014 diff hist -69 715 - Cleaning and Coating Existing Structural Steel →Inspector’s Daily Report for Bridge Painting
- 15:57, 8 July 2014 diff hist +72 715 - Cleaning and Coating Existing Structural Steel →Inspector’s Daily Report for Bridge Painting
- 15:56, 8 July 2014 diff hist +8 715 - Cleaning and Coating Existing Structural Steel →Forms
- 15:56, 8 July 2014 diff hist -71 715 - Cleaning and Coating Existing Structural Steel →Inspector’s Daily Report for Bridge Painting
- 15:54, 8 July 2014 diff hist +71 715 - Cleaning and Coating Existing Structural Steel →Inspector’s Daily Report for Bridge Painting
- 15:51, 8 July 2014 diff hist +33 715 - Cleaning and Coating Existing Structural Steel →Forms
- 15:45, 8 July 2014 diff hist -25 715 - Cleaning and Coating Existing Structural Steel →Inspector’s Daily Report for Bridge Painting
- 15:43, 8 July 2014 diff hist +23 715 - Cleaning and Coating Existing Structural Steel →Inspector’s Daily Report for Bridge Painting
- 15:41, 8 July 2014 diff hist +6 715 - Cleaning and Coating Existing Structural Steel →Other Documentation
- 15:41, 8 July 2014 diff hist +2 715 - Cleaning and Coating Existing Structural Steel →Other Documentation
- 15:37, 8 July 2014 diff hist 0 715 - Cleaning and Coating Existing Structural Steel →Structures Over Railroad
- 15:37, 8 July 2014 diff hist 0 715 - Cleaning and Coating Existing Structural Steel →Structural Steel Surface Abrasive Blasting Requirements
- 15:37, 8 July 2014 diff hist +186 715 - Cleaning and Coating Existing Structural Steel →Spent Material
- 15:35, 8 July 2014 diff hist +196 715 - Cleaning and Coating Existing Structural Steel →Containment
- 15:34, 8 July 2014 diff hist 0 715 - Cleaning and Coating Existing Structural Steel →Containment
- 15:33, 8 July 2014 diff hist -10 715 - Cleaning and Coating Existing Structural Steel →Requirements
- 15:30, 8 July 2014 diff hist +3 715 - Cleaning and Coating Existing Structural Steel →Requirements
- 15:29, 8 July 2014 diff hist +95 715 - Cleaning and Coating Existing Structural Steel →Requirements
- 15:26, 8 July 2014 diff hist +2 715 - Cleaning and Coating Existing Structural Steel →Exposure Monitoring
- 09:42, 8 July 2014 diff hist +2 Main Page
- 09:28, 3 July 2014 diff hist 0 m Module:Yesno 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Module:Namespace detect/data 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Module:Namespace detect/config 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Module:Namespace detect 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Module:Message box/configuration 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Module:Message box 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Module:HtmlBuilder 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Module:Documentation/config 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Module:Documentation 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Module:Category handler 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Module:Arguments 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:Uselang 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:Tiw 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:Tim 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:Pp-template 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:Pp-meta/pagetype 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:Pp-meta 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:Nmbox 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:Languages/Title 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:Languages/Lang 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:Languages 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:LangSwitch 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:GetFallback 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:Documentation/doc 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:Documentation 1 revision current
- 09:28, 3 July 2014 diff hist 0 m Template:Doc 1 revision current
- 15:04, 2 July 2014 diff hist -1 Main Page →Recent Minor Changes
- 15:03, 2 July 2014 diff hist +17 Main Page →Recent Minor Changes
- 15:02, 2 July 2014 diff hist +3 Main Page →Recent Minor Changes
- 15:01, 2 July 2014 diff hist +92 Main Page →Recent Minor Changes
- 14:09, 2 July 2014 diff hist +37 N File:Fig109-2.png Final Estimate Cover Letter/Checklist
- 13:12, 2 July 2014 diff hist +1,779 Disadvantaged Business Enterprises (DBE)
- 11:21, 2 July 2014 diff hist +166 Main Page
- 11:18, 2 July 2014 diff hist +70 N File:Work continues on the new M-85 bridge over the Rouge River in Detroit.jpg Work continues on the new M-85 bridge over the Rouge River in Detroit. current
- 10:38, 2 July 2014 diff hist +44 N File:Mount Elliot Park on the Detroit riverfront.jpg Mount Elliot Park on the Detroit riverfront. current
- 10:37, 2 July 2014 diff hist +66 N File:Progress on the M-231 bridge over the Grand River in Ottawa County.jpg Progress on the M-231 bridge over the Grand River in Ottawa County current
- 10:27, 2 July 2014 diff hist -8 Main Page
- 10:25, 2 July 2014 diff hist +135 Main Page
- 09:51, 2 July 2014 diff hist +36 N File:ExCMpg3.png Example Contract Modification Page 3 current
- 09:50, 2 July 2014 diff hist +36 N File:ExCMpg2.png Example Contract Modification Page 2 current
- 09:50, 2 July 2014 diff hist +36 N File:ExCMpg1.png Example Contract Modification Page 1 current
- 16:29, 27 June 2014 diff hist 0 Main Page →Recent Major Changes
- 16:29, 27 June 2014 diff hist -1 Main Page →Recent Minor Changes
- 16:28, 27 June 2014 diff hist -25 Main Page →Recent Minor Changes
- 16:27, 27 June 2014 diff hist +974 Main Page
- 11:52, 27 June 2014 diff hist -4,456 506 - Slurry Seal
- 11:50, 27 June 2014 diff hist +1 505 - Chip Seals →MATERIALS
- 11:50, 27 June 2014 diff hist -2,464 505 - Chip Seals
- 11:45, 27 June 2014 diff hist -586 504 - Micro-Surfacing →MEASUREMENT AND PAYMENT
- 11:44, 27 June 2014 diff hist -3,183 504 - Micro-Surfacing →CONSTRUCTION
- 11:43, 27 June 2014 diff hist -570 504 - Micro-Surfacing →MATERIALS
- 11:43, 27 June 2014 diff hist -952 504 - Micro-Surfacing →GENERAL
- 11:41, 27 June 2014 diff hist +239 502 - HMA Crack Treatment →MEASUREMENT AND PAYMENT
- 11:40, 27 June 2014 diff hist +601 502 - HMA Crack Treatment →CONSTRUCTION
- 11:39, 27 June 2014 diff hist +170 502 - HMA Crack Treatment →MATERIALS
- 08:20, 27 June 2014 diff hist +14 803 - Concrete Sidewalk, Ramps, and Steps →GENERAL
- 13:31, 26 June 2014 diff hist +9 803 - Concrete Sidewalk, Ramps, and Steps →GENERAL
- 13:01, 26 June 2014 diff hist +64 803 - Concrete Sidewalk, Ramps, and Steps →Joints
- 13:00, 26 June 2014 diff hist +128 803 - Concrete Sidewalk, Ramps, and Steps →GENERAL
- 12:57, 26 June 2014 diff hist +2 803 - Concrete Sidewalk, Ramps, and Steps →Joints
- 12:56, 26 June 2014 diff hist -75 803 - Concrete Sidewalk, Ramps, and Steps
- 08:36, 26 June 2014 diff hist +205 Main Page →Recent Major Changes
- 08:31, 26 June 2014 diff hist +114 803 - Concrete Sidewalk, Ramps, and Steps
- 08:54, 25 June 2014 diff hist +101 Main Page
- 08:51, 25 June 2014 diff hist +69 N File:Crews recently removed bridge beams from M-47 over US-10 near Midland.png Crews recently removed bridge beams from M-47 over US-10 near Midland current
- 14:33, 19 June 2014 diff hist +199 Main Page →Recent Major Changes
- 14:20, 19 June 2014 diff hist +2 Help:Contents →General Comments
- 14:17, 17 June 2014 diff hist +28 N File:Appendix B - Sample Contract Modification.pdf Sample Contract Modification current
- 14:16, 17 June 2014 diff hist +24 N File:Appendix A - Approval Path Flow Chart.pdf Approval Path Flow Chart current
- 14:26, 5 June 2014 diff hist +16 E-Construction