User contributions
Jump to navigation
Jump to search
- 13:29, 1 May 2014 diff hist +42 N File:Fig707.2.png Figure 707.2 Approved For Use Stamp (MDOT) current
- 13:27, 1 May 2014 diff hist +42 N File:Fig707.1-2.png Figure 707.1-2 Shop Drawing Review Process current
- 13:24, 1 May 2014 diff hist +46 N File:Fig707.1-1.png Figure 707.1-1 – Shop Drawing Review Process current
- 13:21, 1 May 2014 diff hist +4,459 707 - Structural Steel →GENERAL
- 13:15, 1 May 2014 diff hist +65 707 - Structural Steel
- 13:14, 1 May 2014 diff hist +1,351 707 - Structural Steel →GENERAL
- 11:18, 1 May 2014 diff hist +49 N File:Fig604-03.png Figure 604-3: Quality Assurance Mix Design Review current
- 11:11, 1 May 2014 diff hist +48 N File:Fig604-02.png MDOT Checklist For Concrete Paving With Warranty current
- 12:34, 30 April 2014 diff hist +32 603 - Concrete Pavement Restoration →Strength Requirements
- 12:23, 29 April 2014 diff hist +1,501 603 - Concrete Pavement Restoration →Strength Requirements
- 12:22, 29 April 2014 diff hist +39 N File:Table603-01.png Table 1: Modulus of Rupture Factors (F) current
- 12:17, 29 April 2014 diff hist +50 N File:EQ 603-02.png Simplified Center Point Flexural Strength Equation current
- 12:15, 29 April 2014 diff hist +17 N File:FIG603-01.png Beam Measurements current
- 12:11, 29 April 2014 diff hist +76 N File:EQ603-01.png Flexural Strength of Concrete (Using Simple Beam With Center Point Loading): current
- 12:10, 29 April 2014 diff hist +186 603 - Concrete Pavement Restoration →Strength Requirements
- 11:52, 29 April 2014 diff hist +45 603 - Concrete Pavement Restoration →MEASUREMENT AND PAYMENT
- 11:51, 29 April 2014 diff hist -6,190 603 - Concrete Pavement Restoration →MEASUREMENT AND PAYMENT
- 11:51, 29 April 2014 diff hist -3 603 - Concrete Pavement Restoration →Opening to Traffic
- 11:47, 29 April 2014 diff hist +2 603 - Concrete Pavement Restoration →Removal of Concrete
- 11:46, 29 April 2014 diff hist -1 603 - Concrete Pavement Restoration →Slot Cutting
- 11:45, 29 April 2014 diff hist -80 603 - Concrete Pavement Restoration →Dowel Bar Retrofit (DBR)
- 11:23, 29 April 2014 diff hist +82 603 - Concrete Pavement Restoration →Control and Disposal of Grinding Residue
- 11:21, 29 April 2014 diff hist -12 603 - Concrete Pavement Restoration →Control and Disposal of Grinding Residue
- 11:20, 29 April 2014 diff hist +54 603 - Concrete Pavement Restoration →Diamond Grinding
- 11:18, 29 April 2014 diff hist +9 603 - Concrete Pavement Restoration →Sawing and Sealing Joints
- 11:17, 29 April 2014 diff hist +820 603 - Concrete Pavement Restoration →Sealing Joints and Opening to Traffic
- 11:13, 29 April 2014 diff hist -950 603 - Concrete Pavement Restoration →Strength Requirements
- 11:13, 29 April 2014 diff hist +604 603 - Concrete Pavement Restoration →Curing Patches
- 11:12, 29 April 2014 diff hist -603 603 - Concrete Pavement Restoration →Curing Patches
- 11:11, 29 April 2014 diff hist -36 603 - Concrete Pavement Restoration →Curing Patches
- 11:07, 29 April 2014 diff hist -641 603 - Concrete Pavement Restoration →Finishing Patches
- 11:06, 29 April 2014 diff hist -68 603 - Concrete Pavement Restoration →Straightedging
- 11:06, 29 April 2014 diff hist -1,153 603 - Concrete Pavement Restoration →Testing Requirements
- 11:04, 29 April 2014 diff hist -602 603 - Concrete Pavement Restoration →Mesh Reinforcement
- 11:04, 29 April 2014 diff hist +571 603 - Concrete Pavement Restoration →Placing and Finishing Concrete
- 11:03, 29 April 2014 diff hist -27 603 - Concrete Pavement Restoration →Forms
- 11:02, 29 April 2014 diff hist -9 603 - Concrete Pavement Restoration →Dowels
- 11:01, 29 April 2014 diff hist +64 603 - Concrete Pavement Restoration →Longitudinal Joints
- 11:00, 29 April 2014 diff hist +39 603 - Concrete Pavement Restoration →Transverse Joints
- 10:59, 29 April 2014 diff hist -190 603 - Concrete Pavement Restoration →Expansion Joints (Erg)
- 10:58, 29 April 2014 diff hist +51 603 - Concrete Pavement Restoration →Joints
- 10:57, 29 April 2014 diff hist -16 603 - Concrete Pavement Restoration →Aggregate Base
- 10:57, 29 April 2014 diff hist -1,004 603 - Concrete Pavement Restoration →Intermediate Saw Cuts
- 10:56, 29 April 2014 diff hist +294 603 - Concrete Pavement Restoration →Removing Old Concrete
- 10:53, 29 April 2014 diff hist +30 603 - Concrete Pavement Restoration →Patch Layout
- 10:50, 29 April 2014 diff hist +16 603 - Concrete Pavement Restoration →Bond Breakers
- 10:50, 29 April 2014 diff hist -91 603 - Concrete Pavement Restoration →Dowel Bars and Lane Tie Bars
- 10:49, 29 April 2014 diff hist +129 603 - Concrete Pavement Restoration →Load Transfer Assemblies
- 10:47, 29 April 2014 diff hist -1 603 - Concrete Pavement Restoration →Type P-NC (non-chloride)
- 10:46, 29 April 2014 diff hist -460 603 - Concrete Pavement Restoration →Type P-MS
- 10:45, 29 April 2014 diff hist -54 603 - Concrete Pavement Restoration →Type or Grade of Concrete
- 10:40, 29 April 2014 diff hist +126 603 - Concrete Pavement Restoration →Inspection During Patching
- 10:39, 29 April 2014 diff hist -1 603 - Concrete Pavement Restoration →Patching
- 10:39, 29 April 2014 diff hist -266 603 - Concrete Pavement Restoration →Inspection During Patching
- 10:39, 29 April 2014 diff hist +141 603 - Concrete Pavement Restoration →Inspection During Patching
- 08:29, 29 April 2014 diff hist -21 603 - Concrete Pavement Restoration →GENERAL
- 08:17, 29 April 2014 diff hist +37 N File:%Ret Table Check 4-24-13.xls Percent Retained Table Check 04-24-13 current
- 08:15, 29 April 2014 diff hist +41 N File:Concrete JMF Yield Calculator.v3.4-17-13.xls Concrete JMF Yield Calculator v3 04-17-13 current
- 08:06, 29 April 2014 diff hist +50 603 - Concrete Pavement Restoration →GENERAL
- 14:06, 23 April 2014 diff hist +169 E-Signature
- 14:05, 23 April 2014 diff hist +2,284 N E-Signature Created page with " ===e-Signature Process=== The Michigan Attorney General’s office, in concurrence of the Federal Highway Administration, has issued a decision ..."
- 14:05, 23 April 2014 diff hist -2,282 E-Construction
- 14:03, 23 April 2014 diff hist +27 MediaWiki:Sidebar
- 10:28, 16 April 2014 diff hist -12 E-Construction
- 10:24, 16 April 2014 diff hist +80 E-Construction
- 10:20, 16 April 2014 diff hist -4 E-Construction →Construction Documentation Standard Naming Conventions for e-Construction
- 10:20, 16 April 2014 diff hist +2,282 E-Construction
- 10:19, 16 April 2014 diff hist +1,179 FieldManager
- 10:18, 16 April 2014 diff hist -1,179 FieldManager →Office Technician Certification Requirements
- 10:18, 16 April 2014 diff hist +4,092 FieldManager
- 10:16, 16 April 2014 diff hist +3,497 Local Agency Program (LAP)
- 10:15, 16 April 2014 diff hist -2 FieldManager →Engineer Certification Program
- 10:14, 16 April 2014 diff hist +6,912 FieldManager
- 10:11, 16 April 2014 diff hist -423 Local Agency Program (LAP) →REGION OVERSIGHT OF LOCAL AGENCY CONSTRUCTION PROJECTS
- 10:10, 16 April 2014 diff hist +26,489 N Local Agency Program (LAP) Created page with "==REGION OVERSIGHT OF LOCAL AGENCY CONSTRUCTION PROJECTS== The Michigan Department of Transportation (MDOT) and lo..."
- 10:09, 16 April 2014 diff hist +1,179 FieldManager
- 09:57, 16 April 2014 diff hist +1,039 N Disadvantaged Business Enterprises (DBE) Created page with "===On-the-Job Training=== As of January 1, 2001, MDOT has implemented a new OJT Pilot Program designed to provide training in the skilled constructio..."
- 09:25, 16 April 2014 diff hist +2,951 FieldManager
- 09:23, 16 April 2014 diff hist +177 FieldManager
- 09:22, 16 April 2014 diff hist +2,375 N FieldManager Created page with "===FieldManager=== [http://michigan.gov/mdot/0,1607,7-151-9625_47921---,00.html FieldManager] is a construction management system employed by over 1000 users..."
- 09:21, 16 April 2014 diff hist +2 E-Construction
- 09:20, 16 April 2014 diff hist +13,928 N E-Construction Created page with " <center><span STYLE="font: 40pt arial;">'''Division 1 Supplemental Information'''</span></center> <center><span STYLE="font: 30pt arial;">'''e-Construction'''</span></center>..."
- 09:14, 16 April 2014 diff hist +107 MediaWiki:Sidebar
- 09:12, 16 April 2014 diff hist +88 MediaWiki:Sidebar
- 11:42, 15 April 2014 diff hist +36 m Main Page →MDOT Mission Statement:
- 11:40, 15 April 2014 diff hist +21 Main Page →Forward
- 11:40, 15 April 2014 diff hist -6 Main Page →MDOT Mission Statement:
- 09:39, 9 April 2014 diff hist +976 717 - Downspouts and Drains →CONSTRUCTION
- 09:38, 9 April 2014 diff hist +1,088 717 - Downspouts and Drains →MATERIALS
- 09:36, 9 April 2014 diff hist +2,472 717 - Downspouts and Drains →GENERAL
- 09:18, 9 April 2014 diff hist 0 711 - Bridge Railings →MATERIALS
- 09:18, 9 April 2014 diff hist +4,059 711 - Bridge Railings →CONSTRUCTION
- 09:14, 9 April 2014 diff hist +317 711 - Bridge Railings →MATERIALS
- 09:13, 9 April 2014 diff hist 0 711 - Bridge Railings →GENERAL
- 09:11, 9 April 2014 diff hist +2,219 711 - Bridge Railings →GENERAL
- 09:03, 9 April 2014 diff hist +10,254 709 - Timber Sturctures →MATERIALS
- 08:54, 9 April 2014 diff hist +2,423 709 - Timber Sturctures →CONSTRUCTION
- 08:50, 9 April 2014 diff hist +2,770 709 - Timber Sturctures →GENERAL
- 08:46, 9 April 2014 diff hist +1,770 709 - Timber Sturctures →GENERAL
- 08:21, 9 April 2014 diff hist +61 N File:Fig717-01.png Drain Casting Assembly Details from Standard Plan Series B101 current
- 08:20, 9 April 2014 diff hist +46 N File:Fig711-07.png Bridge Barrier Railing, Aesthetic Parapet Tube current
- 08:19, 9 April 2014 diff hist +78 N File:Fig711-06.png Bridge Barrier Railing, Thrie Beam Retrofit (Open Parapet Type Bridge Railing) current
- 08:18, 9 April 2014 diff hist +68 N File:Fig711-05.png Bridge Barrier Railing, Thrie Beam REtorfit (R4 Type Bridge Railing) current
- 08:17, 9 April 2014 diff hist +30 N File:Fig711-04.png Bridge Barrier Railing, 4 Tube current
- 08:16, 9 April 2014 diff hist +30 N File:Fig711-03.png Bridge Barrier Railing, 2 Tube current
- 08:16, 9 April 2014 diff hist +29 N File:Fig711-02.png Bridge Barrier Railing Type 5 current
- 08:15, 9 April 2014 diff hist +29 N File:Fig711-01.png Bridge Barrier Railing Type 4 current
- 08:14, 9 April 2014 diff hist +102 N File:Fig709-05.png Table 912-10 Preservation retention requirements. MDOT 2012 Standard Specifications for Construction. current
- 08:12, 9 April 2014 diff hist +34 N File:Fig709-04.png Inspection Stamp for Glulam Lumber current
- 08:11, 9 April 2014 diff hist +74 N File:Fig709-03.png Stress laminated deck system showing typical components. USDA-FPL-GTR-125 current
- 08:06, 9 April 2014 diff hist +28 N File:Fig709-02.png Typical Lumber Grading Marks current
- 08:06, 9 April 2014 diff hist +29 N File:Fig709-01.png Timber and Lumber Terminology current
- 16:58, 7 April 2014 diff hist +49 N File:Letter - Procedures for Review of Contractor Claims.png Letter-Procedures for Review of Contractor Claims current
- 16:57, 7 April 2014 diff hist +25 N File:IM11-07 CPF.png Claims Process Flow Chart current
- 13:23, 7 April 2014 diff hist +23 MDOT Construction Manual Content Revision Procedures →Construction Manual Change Process
- 13:21, 7 April 2014 diff hist -34 MDOT Construction Manual Content Revision Procedures →Construction Manual Change Process
- 13:20, 7 April 2014 diff hist +30 MDOT Construction Manual Content Revision Procedures →Construction Manual Change Process
- 12:14, 4 April 2014 diff hist +11 Main Page →Current News
- 12:13, 4 April 2014 diff hist -52 Main Page →Current News
- 12:10, 4 April 2014 diff hist +198 Main Page →Current News
- 12:01, 4 April 2014 diff hist +8 Main Page →Current News
- 12:00, 4 April 2014 diff hist +474 Main Page →General Information
- 11:54, 4 April 2014 diff hist +25 Help:Contents →Content Suggestions
- 15:27, 31 March 2014 diff hist +1 501 - Plant Produced Hot Mix Asphalt →Paver
- 15:27, 31 March 2014 diff hist +1 501 - Plant Produced Hot Mix Asphalt →Hauling Units
- 15:26, 31 March 2014 diff hist +2 501 - Plant Produced Hot Mix Asphalt →Hauling Units
- 15:26, 31 March 2014 diff hist +4 501 - Plant Produced Hot Mix Asphalt →Paver
- 16:08, 19 March 2014 diff hist +35 602 - Concrete Pavement Construction →MEASUREMENT AND PAYMENT
- 16:07, 19 March 2014 diff hist +24 602 - Concrete Pavement Construction →INSPECTOR’S CHECKLIST
- 14:59, 19 March 2014 diff hist +9 602 - Concrete Pavement Construction →Form Paving
- 14:36, 19 March 2014 diff hist +8,372 602 - Concrete Pavement Construction →CONSTRUCTION
- 14:28, 19 March 2014 diff hist -4,786 602 - Concrete Pavement Construction →Ride Quality
- 14:26, 19 March 2014 diff hist -732 602 - Concrete Pavement Construction →Pavement Coring
- 14:26, 19 March 2014 diff hist +99 602 - Concrete Pavement Construction →PAVEMENT CORING
- 14:24, 19 March 2014 diff hist +54 N File:Flowchart 602-09.png Figure 602-9 Pavement Coring for Acceptance Flow Chart current
- 14:23, 19 March 2014 diff hist +2,145 602 - Concrete Pavement Construction →CONSTRUCTION
- 14:14, 19 March 2014 diff hist -5 602 - Concrete Pavement Construction →OPENING TO TRAFFIC
- 14:13, 19 March 2014 diff hist +70 602 - Concrete Pavement Construction →CONSTRUCTION
- 14:12, 19 March 2014 diff hist +33 N File:Table 602 % increase strength.png Table 602 % increase strength.png current
- 14:11, 19 March 2014 diff hist +1,434 602 - Concrete Pavement Construction →CONSTRUCTION
- 14:02, 19 March 2014 diff hist +10,398 602 - Concrete Pavement Construction →CONSTRUCTION
- 13:57, 19 March 2014 diff hist +1 602 - Concrete Pavement Construction →[#Expansion Caps|Expansion Caps]]
- 13:56, 19 March 2014 diff hist -2 602 - Concrete Pavement Construction →Grade Control
- 13:56, 19 March 2014 diff hist 0 602 - Concrete Pavement Construction →Tining Device
- 13:55, 19 March 2014 diff hist +3 602 - Concrete Pavement Construction →Concrete Texturing
- 13:54, 19 March 2014 diff hist +2 602 - Concrete Pavement Construction →Header Joints
- 13:54, 19 March 2014 diff hist +1 602 - Concrete Pavement Construction →[#Expansion Caps|Expansion Caps]]
- 13:53, 19 March 2014 diff hist +62 602 - Concrete Pavement Construction →Header Joints
- 13:50, 19 March 2014 diff hist +21,545 602 - Concrete Pavement Construction →CONSTRUCTION
- 13:37, 19 March 2014 diff hist +35 N File:Fig 602-08.png Figure 602-8 Header Board Placement current
- 13:36, 19 March 2014 diff hist +40 N File:Fig 602-07.png Figure 602-7 Transverse Expansion Joints current
- 13:36, 19 March 2014 diff hist +40 N File:Fig 602-06.png Figure 602-6 Basket Pin and Basket Level current
- 13:35, 19 March 2014 diff hist +48 N File:Fig 602-05.png Figure 602-5 Positioning Dowel Basket Assemblies current
- 13:35, 19 March 2014 diff hist 0 602 - Concrete Pavement Construction →PLACING AND FINISHING CONCRETE
- 13:34, 19 March 2014 diff hist +5,371 602 - Concrete Pavement Construction →CONSTRUCTION
- 13:16, 19 March 2014 diff hist -114,008 602 - Concrete Pavement Construction →CONSTRUCTION
- 11:01, 19 March 2014 diff hist -59 MediaWiki:Sidebar
- 11:00, 19 March 2014 diff hist +11,900 705 - Foundation Piling
- 10:56, 19 March 2014 diff hist +1 718 - Drilled Shafts →CONSTRUCTION
- 10:56, 19 March 2014 diff hist -1 718 - Drilled Shafts →EQUIPMENT
- 10:56, 19 March 2014 diff hist +8 718 - Drilled Shafts →Prior to Drilled Shaft Operations
- 10:55, 19 March 2014 diff hist +1 718 - Drilled Shafts →During Drilling Operations
- 10:54, 19 March 2014 diff hist +6 718 - Drilled Shafts →Obstruction Removal
- 10:54, 19 March 2014 diff hist 0 718 - Drilled Shafts →Placing Steel Reinforcement
- 10:53, 19 March 2014 diff hist 0 718 - Drilled Shafts →Placing Concrete
- 10:53, 19 March 2014 diff hist 0 718 - Drilled Shafts →POST CONSTRUCTION INTEGRITY TESTING
- 10:52, 19 March 2014 diff hist +22 718 - Drilled Shafts →Placing Concrete
- 10:52, 19 March 2014 diff hist +31 718 - Drilled Shafts →POST CONSTRUCTION INTEGRITY TESTING
- 10:33, 19 March 2014 diff hist +16,308 718 - Drilled Shafts →EQUIPMENT
- 10:10, 19 March 2014 diff hist +613 718 - Drilled Shafts →CONSTRUCTION
- 10:08, 19 March 2014 diff hist +3,673 718 - Drilled Shafts →MATERIALS
- 10:02, 19 March 2014 diff hist +4,216 718 - Drilled Shafts →GENERAL
- 09:57, 19 March 2014 diff hist +869 718 - Drilled Shafts →GENERAL
- 09:56, 19 March 2014 diff hist +37 N File:Fig 718-9.png Figure 9. Improper concrete placement current
- 09:56, 19 March 2014 diff hist +54 N File:Fig 718-8.png Figure 8. Rebar cage being lowered into complete shaft current
- 09:55, 19 March 2014 diff hist +28 N File:Fig 718-7.png Figure 7. Rebar cage spacers current
- 09:55, 19 March 2014 diff hist +31 N File:Fig 718-6.png Figure 6. Soft rock core barrel current
- 09:55, 19 March 2014 diff hist +28 N File:Fig 718-5.png Figure 5. Muck bucket bottom current
- 09:54, 19 March 2014 diff hist +21 N File:Fig 718-4.png Figure 4. Muck bucket current
- 09:54, 19 March 2014 diff hist +34 N File:Fig 718-3.png Figure 3. Single flight rock auger current
- 09:54, 19 March 2014 diff hist +35 N File:Fig 718-2.png Figure 2. Double flight earth auger current
- 09:53, 19 March 2014 diff hist +34 N File:Fig 718-1.png Figure 1. Typical drill rig set up current
- 14:00, 18 March 2014 diff hist +55 N File:103 Figure 1.jpg Figure 1 – Approval Thresholds for contract revisions current
- 16:26, 11 March 2014 diff hist -198 602 - Concrete Pavement Construction →Inspection During and Following Concrete Placement
- 15:38, 11 March 2014 diff hist -2,233 602 - Concrete Pavement Construction →Acceptance of Materials
- 15:33, 11 March 2014 diff hist -47 602 - Concrete Pavement Construction →Plan Review and Field Book
- 15:32, 11 March 2014 diff hist -18 602 - Concrete Pavement Construction →Pavement Inspection Team
- 15:27, 11 March 2014 diff hist -703 602 - Concrete Pavement Construction →Concrete Testing Procedures
- 15:25, 11 March 2014 diff hist -2,179 602 - Concrete Pavement Construction →INSTRUCTIONS TO CONCRETE MIX OPERATIONS
- 12:16, 3 February 2014 diff hist +42 N File:Fig 705-6.png Figure 6. Typical conical pile pile points current
- 12:16, 3 February 2014 diff hist +40 N File:Fig 705-5.png Figure 5. Typical HP section pile points current
- 12:16, 3 February 2014 diff hist +50 N File:Fig 705-4.png Figure 4. Typical helmet and cushion configuration current
- 12:15, 3 February 2014 diff hist +39 N File:Fig 705-3.png Figure 3. Typical nylon hammer cushions current
- 12:15, 3 February 2014 diff hist +47 N File:Fig 705-2.png Figure 2. Typical pile driving equipment set up current
- 12:14, 3 February 2014 diff hist +26 N File:Fig 705-1.png Figure 1. Typical HP shape current
- 12:02, 3 February 2014 diff hist +1 MediaWiki:Sidebar
- 12:01, 3 February 2014 diff hist +58 MediaWiki:Sidebar
- 16:42, 29 January 2014 diff hist +30 704 - Steel Sheet Piling and Cofferdams →Cofferdam Installation
- 16:35, 29 January 2014 diff hist 0 704 - Steel Sheet Piling and Cofferdams →Cofferdam Installation
- 16:34, 29 January 2014 diff hist 0 704 - Steel Sheet Piling and Cofferdams →Cofferdam Installation
- 16:31, 29 January 2014 diff hist +112 704 - Steel Sheet Piling and Cofferdams →Cofferdam Installation
- 16:30, 29 January 2014 diff hist +62 N File:Fig 704-8.png Figure 704-8: Typical cofferdam bracing with walers and struts current
- 16:27, 29 January 2014 diff hist +58 704 - Steel Sheet Piling and Cofferdams →Cofferdam Installation
- 16:23, 29 January 2014 diff hist +208 704 - Steel Sheet Piling and Cofferdams →Contractor’s Design
- 16:22, 29 January 2014 diff hist +26 704 - Steel Sheet Piling and Cofferdams →Temporary Steel Sheet Piling - Temporary Steel Sheet Piling Left In Place (Construction)
- 16:20, 29 January 2014 diff hist +82 704 - Steel Sheet Piling and Cofferdams →Steel Sheet Piling Section Fabrication
- 16:18, 29 January 2014 diff hist 0 704 - Steel Sheet Piling and Cofferdams →Vibratory Hammers
- 16:17, 29 January 2014 diff hist +279 704 - Steel Sheet Piling and Cofferdams →Design and Approval Process
- 16:12, 29 January 2014 diff hist +8 704 - Steel Sheet Piling and Cofferdams →Cofferdams - Cofferdams Left In Place
- 16:11, 29 January 2014 diff hist +9 704 - Steel Sheet Piling and Cofferdams →Temporary Steel Sheet Piling - Temporary Steel Sheet Piling Left In Place
- 16:09, 29 January 2014 diff hist +96 704 - Steel Sheet Piling and Cofferdams →Permanent Steel Sheet Piling
- 16:08, 29 January 2014 diff hist +4 704 - Steel Sheet Piling and Cofferdams →Cofferdams
- 16:00, 29 January 2014 diff hist +12 704 - Steel Sheet Piling and Cofferdams →Tremie Installation
- 15:58, 29 January 2014 diff hist -14 704 - Steel Sheet Piling and Cofferdams →Obstruction Removal
- 15:56, 29 January 2014 diff hist +1,136 704 - Steel Sheet Piling and Cofferdams →CONSTRUCTION
- 15:53, 29 January 2014 diff hist +208 704 - Steel Sheet Piling and Cofferdams →Cofferdam Installation
- 15:50, 29 January 2014 diff hist +164 704 - Steel Sheet Piling and Cofferdams →Cofferdam Installation
- 15:29, 29 January 2014 diff hist +59 704 - Steel Sheet Piling and Cofferdams →Cofferdam Installation
- 15:27, 29 January 2014 diff hist +91 704 - Steel Sheet Piling and Cofferdams →Contractor’s Design
- 15:25, 29 January 2014 diff hist +86 704 - Steel Sheet Piling and Cofferdams →Permanent Steel Sheet Piling(Construction)
- 15:24, 29 January 2014 diff hist +494 704 - Steel Sheet Piling and Cofferdams →Design and Approval Process
- 15:17, 29 January 2014 diff hist +78 704 - Steel Sheet Piling and Cofferdams →Design and Approval Process
- 14:41, 29 January 2014 diff hist -1 714 - Temporary Structures and Approaches →Formwork
- 14:40, 29 January 2014 diff hist +2 714 - Temporary Structures and Approaches →Formwork
- 14:38, 29 January 2014 diff hist +6 714 - Temporary Structures and Approaches →Removal
- 14:37, 29 January 2014 diff hist +6 714 - Temporary Structures and Approaches →Temporary Bridge Structures, Falsework, Work Platforms and Scaffolding
- 14:34, 29 January 2014 diff hist +6 714 - Temporary Structures and Approaches →Formwork
- 14:33, 29 January 2014 diff hist +13 714 - Temporary Structures and Approaches →Temporary Bridge Structures, Falsework, Work Platforms and Scaffolding
- 14:31, 29 January 2014 diff hist +8 714 - Temporary Structures and Approaches →Temporary Earth Retaining Structures and Cofferdams
- 14:30, 29 January 2014 diff hist +16 714 - Temporary Structures and Approaches →Temporary Bridge Structures
- 14:27, 29 January 2014 diff hist +1 714 - Temporary Structures and Approaches →Temporary Bridge Structures
- 14:20, 29 January 2014 diff hist -7 714 - Temporary Structures and Approaches →GENERAL
- 14:17, 29 January 2014 diff hist -79 714 - Temporary Structures and Approaches →CONSTRUCTION AND MAINTENANCE
- 14:17, 29 January 2014 diff hist 0 714 - Temporary Structures and Approaches →DESIGN AND APPROVAL PROCESS
- 14:16, 29 January 2014 diff hist 0 714 - Temporary Structures and Approaches →REMOVAL
- 14:16, 29 January 2014 diff hist +8,166 714 - Temporary Structures and Approaches →CONSTRUCTION
- 14:15, 29 January 2014 diff hist -8,221 714 - Temporary Structures and Approaches →GENERAL
- 14:14, 29 January 2014 diff hist +71 714 - Temporary Structures and Approaches →#Temporary Bridge Structures, Falsework, Work Platforms and Scaffolding
- 14:13, 29 January 2014 diff hist +5 714 - Temporary Structures and Approaches →Temporary Earth Retaining Structures and Cofferdams
- 14:12, 29 January 2014 diff hist -258 714 - Temporary Structures and Approaches →GENERAL
- 14:09, 29 January 2014 diff hist +51 714 - Temporary Structures and Approaches →#Temporary Earth Retaining Structures and Cofferdams|
- 14:08, 29 January 2014 diff hist +133 714 - Temporary Structures and Approaches →Temporary Bridge Structures
- 14:03, 29 January 2014 diff hist +9 714 - Temporary Structures and Approaches →GENERAL
- 14:02, 29 January 2014 diff hist -54 714 - Temporary Structures and Approaches →GENERAL
- 13:57, 29 January 2014 diff hist -70 714 - Temporary Structures and Approaches →GENERAL
- 13:08, 29 January 2014 diff hist +18,663 714 - Temporary Structures and Approaches →GENERAL
- 12:39, 29 January 2014 diff hist +62 N File:714 Fig 5.png Figure 5. ASTM A6 permitted variations in sectional dimensions current
- 12:21, 29 January 2014 diff hist +52 N File:714 Fig 7.png Figure 7. Proper vibrating techniques in deep forms current
- 12:21, 29 January 2014 diff hist +54 N File:714 Fig 6.png Figure 6. ASTM A6 permitted variations in straightness current
- 12:20, 29 January 2014 diff hist +63 N File:714 Fig 5.jpg Figure 5. ASTM A6 permitted variations in sectional dimensions current