File list
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | User | Description | Versions |
---|---|---|---|---|---|---|
17:45, 17 August 2023 | Bondcoat9.jpg (file) | 1.43 MB | Clarkj25 | 1 | ||
08:41, 8 August 2014 | MDOT ProjectWise Explorer Install.pdf (file) | 1.41 MB | Guyona | A guide for External Users for Installing ProjectWise Explorer | 1 | |
09:55, 18 September 2019 | CMU 602 Load Tranfer Assembly Inspections Presentation.pdf (file) | 1.41 MB | McGowanR | 1 | ||
15:44, 3 June 2021 | 107.01 - Jobsite Post Fig. 2.png (file) | 1.33 MB | SchaeferS | 1 | ||
15:15, 14 December 2016 | DI-05650-060.jpg (file) | 1.33 MB | McGowanR | Construction on Bridge decks on the Square Lake Rd Interchange project. | 1 | |
12:40, 9 January 2018 | DI-05767-052.jpg (file) | 1.28 MB | McGowanR | Construction work on the US-23 Flex Route. | 1 | |
09:53, 26 September 2022 | 00 Michigan Risk Based Project Involvement Guidance September 2021 FINAL.pdf (file) | 1.24 MB | Clarkj25 | FHWA Michigan Division Guidance on RBPI | 1 | |
11:22, 8 June 2021 | Engineer certification list - JUNE 2021.jpg (file) | 1.22 MB | SchaeferS | 1 | ||
17:10, 26 July 2021 | MDOT Engineer certification list - July 2021.jpg (file) | 1.22 MB | SchaeferS | 1 | ||
16:30, 29 January 2014 | Fig 704-8.png (file) | 1.21 MB | Greenes2 | Figure 704-8: Typical cofferdam bracing with walers and struts | 1 | |
16:11, 12 October 2021 | Engineer Certification List - 10122021.jpg (file) | 1.2 MB | SchaeferS | 1 | ||
15:06, 16 January 2018 | 707.10 page 1.png (file) | 1.2 MB | JohnsonN23 | 1 | ||
11:45, 7 May 2019 | DI-06801-092.jpg (file) | 1.18 MB | McGowanR | 1 | ||
12:20, 29 January 2014 | 714 Fig 5.jpg (file) | 1.17 MB | Greenes2 | Figure 5. ASTM A6 permitted variations in sectional dimensions | 1 | |
17:46, 17 August 2023 | Bondcoat15.jpg (file) | 1.17 MB | Clarkj25 | 1 | ||
11:29, 13 December 2021 | Engineer certification list 12132021.jpg (file) | 1.16 MB | SchaeferS | 1 | ||
11:42, 16 February 2023 | Appendix A - Approval Path Flow Chart UPDATED 2022.pdf (file) | 1.15 MB | Clarkj25 | 1 | ||
15:50, 8 February 2021 | MDOT Engineer certification list - FEB 2021.jpg (file) | 1.15 MB | SchaeferS | 1 | ||
12:54, 19 May 2014 | Fig712.29.png (file) | 1.15 MB | HarrisR18 | 1 | ||
11:25, 3 February 2022 | Engineer certification list - Feb 3 2022.jpg (file) | 1.13 MB | SchaeferS | 1 | ||
12:52, 19 May 2014 | Fig712.26.png (file) | 1.13 MB | HarrisR18 | 1 | ||
15:42, 3 June 2021 | 107.01 - Jobsite Post Fig. 1.png (file) | 1.09 MB | SchaeferS | 1 | ||
12:21, 29 January 2014 | 714 Fig 6.png (file) | 1.07 MB | Greenes2 | Figure 6. ASTM A6 permitted variations in straightness | 1 | |
08:57, 9 May 2014 | Petosky US31.png (file) | 1.07 MB | Greenes2 | Construction of US-31 in Petosky. | 1 | |
08:57, 29 May 2014 | I-96 Livonia.png (file) | 1.07 MB | Greenes2 | Concrete Paving I-96 in Livonia | 1 | |
09:53, 8 August 2014 | Setting Up an Electronic Signature.pdf (file) | 1.03 MB | Guyona | Creating a Digital Identity with Adobe Reader | 1 | |
17:28, 17 August 2023 | Milling1.jpg (file) | 1.03 MB | Clarkj25 | 1 | ||
10:02, 8 August 2014 | How To Add A Digital Signature Via iPhone 422065 7.pdf (file) | 1.01 MB | Guyona | Creating a Digital Signature on the iPhone | 1 | |
09:28, 23 May 2013 | Fig502-2.jpg (file) | 1.01 MB | Rinarda | 1 | ||
13:33, 19 September 2018 | Construction Records Transmittal and Retrieval Procedures For MDOT TSCs.pdf (file) | 1.01 MB | McGowanR | Construction Records Transmittal and Retrieval Procedures For MDOT TSCs | 1 | |
09:06, 3 August 2020 | MERS 2020 User Guide.pdf (file) | 1,008 KB | SchaeferS | 1 | ||
12:47, 19 May 2014 | Fig712.14.png (file) | 962 KB | HarrisR18 | 1 | ||
12:14, 27 November 2023 | AFAD.jpg (file) | 959 KB | McGowanR | 1 | ||
15:38, 6 June 2018 | DI-06414-080.jpg (file) | 950 KB | McGowanR | Pouring concrete on the I-75 Rouge River project | 1 | |
13:54, 29 August 2023 | Gasdg.jpg (file) | 934 KB | Clarkj25 | 1 | ||
09:04, 7 March 2023 | Engineer certification list - Feb. 2023 - REVISED.jpg (file) | 932 KB | SchaeferS | 1 | ||
08:52, 9 May 2014 | Mackinac Bridge.png (file) | 926 KB | Greenes2 | Construction began 60 years ago this month on the "Mighty Mac" | 1 | |
12:50, 19 May 2014 | Fig712.21.png (file) | 915 KB | HarrisR18 | 1 | ||
09:54, 5 July 2022 | Engineer certification list - JUNE 2022.jpg (file) | 909 KB | SchaeferS | 1 | ||
12:39, 29 January 2014 | 714 Fig 5.png (file) | 902 KB | Greenes2 | Figure 5. ASTM A6 permitted variations in sectional dimensions | 1 | |
08:28, 20 May 2014 | Fig712.11.png (file) | 890 KB | HarrisR18 | 1 | ||
10:18, 11 September 2013 | Asphalt base.jpg (file) | 881 KB | Rinarda | Wikimedia Commons - http://en.wikipedia.org/wiki/File:Asphalt_base.jpg | 1 | |
17:46, 17 August 2023 | Bondcoat14.jpg (file) | 880 KB | Clarkj25 | 1 | ||
12:49, 19 May 2014 | Fig712.20.png (file) | 875 KB | HarrisR18 | 1 | ||
16:13, 20 June 2016 | CMU16-001 AMG Attachment Final.pdf (file) | 874 KB | McGowanR | 1 | ||
09:28, 23 May 2013 | Fig502-1.jpg (file) | 872 KB | Rinarda | 1 | ||
12:48, 19 May 2014 | Fig712.16.png (file) | 870 KB | HarrisR18 | 1 | ||
12:54, 12 May 2014 | Fig 708.3.png (file) | 870 KB | Greenes2 | Figure 708.3 – Structural Precast Concrete Fabrication Inspection Flowchart | 1 | |
15:18, 14 December 2016 | DI-05649-050.jpg (file) | 842 KB | McGowanR | Construction work on the M-1 Rail Woodward Ave. | 1 | |
08:23, 26 September 2017 | Jobsite Poster 9-26 page 2.pdf (file) | 835 KB | JohnsonN23 | 1 |