Search results

Jump to navigation Jump to search

Page title matches

Page text matches

  • Division 5 [[Category:Division 5]]
    7 members (1 subcategory, 0 files) - 10:41, 13 September 2023
  • ...t file. The IDR is to be generated when the contract value earned reaches 5, 10, and 25 percent value of the original contract amount. The notation of ...tract ID. As an example, when the original contract amount earned reaches 5 percent, all projects within the contract are to be paid at 50 percent of t
    2 KB (256 words) - 17:42, 12 January 2022
  • [[Category:Division 5]]
    610 bytes (69 words) - 18:16, 15 December 2021
  • [[Category:Division 5]]
    596 bytes (67 words) - 18:17, 15 December 2021
  • ...icable for trunkline projects with final completion dates on or after June 5, 2024. ...to local agency jobs and MDOT jobs with final completion dates before June 5, 2024.
    3 KB (385 words) - 15:22, 26 September 2023
  • <center><span STYLE="font: 40pt arial;">'''Division 4 Supplemental Information - Mandrel Testing of Plastic Pipe'''</span></cen ...nd verified using a proving ring. The mandrel is sized to allow for up to 5% deformation of the installed pipe. Nominal pipe diameters are defined in
    5 KB (815 words) - 10:40, 16 May 2024
  • [[Category:Division 5]]
    1 KB (174 words) - 18:17, 15 December 2021
  • ** https://mdotwiki.state.mi.us/images_construction/5/50/Documentation_Guide_2024-03-04.pdf|Documentation Guide * Division 1
    7 KB (920 words) - 07:15, 2 April 2024
  • The Construction Field Services (CFS) Division has revised the Hot Mix Asphalt (HMA) Production Manual. A brief descripti * Marshall Mixtures – Subsection 5: Added two new points at the end. (Page 6)
    4 KB (560 words) - 15:14, 19 June 2017
  • Any pipe with a top elevation within 5 feet (1.5 m) of the top of the pavement will be reviewed for removal. [[Category:Division 2]]
    2 KB (304 words) - 10:05, 13 September 2023
  • ...t.htm?fileName=1963.pdf Form 1963]. The sample size will not exceed five (5) items unless major deficiencies are discovered. Some areas on [https://md [[Category:Division 1]]
    4 KB (556 words) - 15:47, 6 May 2021
  • [[Category:Division 5]]
    2 KB (272 words) - 18:14, 15 December 2021
  • See [[501 - HMA Mixtures|Division 5, HMA]] and [[601 - PCC Pavement Mixtures|Division 6, Concrete]] for general materials requirements. Review the plans and [ht [[Category: Division 8]]
    4 KB (545 words) - 12:41, 19 January 2022
  • .... The current requirement is for the requester to submit the form at least 5 work days prior to the anticipated start date of excavation work (excludes [[Category:Division 1]]
    3 KB (370 words) - 11:08, 25 April 2023
  • [[Category:Division 5]]
    2 KB (335 words) - 18:15, 15 December 2021
  • <center>5</center> [[Category: Division 8]]
    3 KB (428 words) - 12:44, 19 January 2022
  • ...ed of reinforced or nonreinforced concrete. [[601 - PCC Pavement Mixtures|Division 6]] of this manual should be referenced for concrete construction. Thickne <center>5 inches (125 mm)</center>
    5 KB (706 words) - 11:49, 19 January 2022
  • *Bridge Barrier Railing, Type 5 ...:Fig711-02.png|200px|thumbnail|right|Figure 2 Bridge Barrier Railing, Type 5]]
    7 KB (1,050 words) - 11:46, 19 January 2022
  • <center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    68 KB (8,871 words) - 10:45, 13 May 2024
  • ...gh the Construction Operations Engineer in the Construction Field Services Division. The VEDT membership will consist of the following individuals (or their de ::e. Administrator of the Development Services Division (if a local agency project)
    9 KB (1,297 words) - 14:57, 11 October 2022

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)