Search results

Jump to navigation Jump to search
  • ...l Project Review (FPR) team will collect the Construction/Project Engineer’s proposed resolutions and forward to the TSC Manager, MDOT Construction Engi ...roject close-out does not mean the project can stay open indefinitely. It’s expected advancement towards project close-out will proceed, the pause reas
    13 KB (1,768 words) - 11:05, 13 July 2023
  • ...ed by an individual to be the legally binding equivalent of the individual's handwritten signature. [https://www.fhwa.dot.gov/construction/cqit/111204d ...he identity of the electronic signature may be verified by using that user’s public key.
    8 KB (1,208 words) - 15:30, 20 September 2023
  • * Aids the Engineer in coordinating and understanding the Contractor's work with other projects working within or near the contract limits. ...is intended to be used absent of any other schedule or when the Contractor’s native scheduling mechanisms do not meet specifications. If filled out corr
    8 KB (1,206 words) - 14:27, 29 February 2024
  • ...a formalized, tiered process for the submittal and review of a Contractor’s claim. The claim review process involves a formalized administrative proce ...dship_%26_Oversight_Plan_(S%26O_Plan) RBPI Stewardship and Oversight (RBPI S&O) plan] for potential inclusion of the FHWA Area Engineer in this claims p
    4 KB (643 words) - 12:08, 12 March 2024
  • ...st meet the material requirements in Special Detail SIG-010-A “Span Wire T.S. on Steel and Wood Poles”, Detail B, Pole Band Clamps on Steel Pole”, w It is the contractor's responsibility to notify MDOT’s Statewide Signal Shop prior to beginning any signal work. Traffic signal p
    9 KB (1,266 words) - 15:59, 2 April 2024
  • ...rack road and bridge construction projects in Michigan. It is used by MDOT’s Region, TSC and construction field offices, local public agencies, and cons * Inspector’s Daily Reports (IDR)
    25 KB (3,668 words) - 12:17, 1 May 2024
  • The special provision is not to compensate the Contractor for the Contractor’s responsibilities in subsection [https://www.michigan.gov/mdot/-/media/Proje ...any material off the ROW and on private property, a copy of the Contractor's written permission from the property owner is required and will be filed wi
    10 KB (1,390 words) - 10:07, 13 September 2023
  • ...t. Section 108.01 of the Standard Specifications refers to the department’s procedures for subcontracting, which are defined in this document. All con ...sponsibility to ensure they have received the cover page and pay item page(s) of the subcontract form prior to the start of work associated with the sub
    5 KB (744 words) - 17:38, 12 January 2022
  • ...y be tested or sampled at the point of production, manufacture or supplier's storage by the Bureau of Field Services or an appointed representative. Th *Aggregate Moisture Content - must be kept uniform for each day's run without evidence of any surplus water.
    15 KB (2,322 words) - 11:43, 19 January 2022
  • ...m) of a contract revision per subsection 109.05.C. When negotiating price(s), the engineer should include one or more of the following applicable detai ...o complete the work, materials, and other items detailed in the contractor’s estimate. Other items to consider may include the impacts of weather, proc
    6 KB (868 words) - 13:19, 6 June 2023
  • Guidance for the submittal of CPE's and 1165 Non-Compliance Documents an be found here: ...nce may assist the Contract Performance Evaluation Review Team and/or MDOT’s Prequalification Committee when reviewing patterns and trends. The Enginee
    20 KB (2,842 words) - 13:29, 4 October 2023
  • ...g information was added regarding Ignition Furnace: Procedure; Contractor's Responsibilities for the Establishment of Ignition Oven Correction Factors;
    4 KB (560 words) - 15:14, 19 June 2017
  • ...mple, nor test for quality control or assist in controlling the Contractor’s production operations. However, compression strength tests on the concrete Communication between MDOT and the Contractor’s QC staff is critical to the success of the QC/QA project.
    30 KB (4,172 words) - 17:23, 3 January 2024
  • ...urer and/or fabricator step certification for all items identified on MDOT’s Buy America - Pay Items and Materials that Require Step Certification list. ...ent is for fabricated elements that are stamped “Approved for Use” by MDOT’s Structural Fabrication Unit (internal or contracted inspection personnel) p
    14 KB (2,171 words) - 07:32, 19 September 2023
  • ...ractor’s breakdown, contact the Construction Field Services (CFS) Division’s Prevailing Wage Compliance Specialist. * Display all labor compliance posters and wage determination(s) on the jobsite.
    63 KB (9,521 words) - 14:09, 1 April 2024
  • **Use “IDR” for inspector’s daily report ...retion of the engineer based on the complexity of the project an inspector’s daily report (IDR) sequence number may be utilized. If a sequence number i
    57 KB (6,809 words) - 11:51, 1 May 2024
  • ...WA’s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan)|FHWA Risk-Based Project Involvement]]</center>||Updated content t ...%99s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan) View Here]
    68 KB (8,802 words) - 12:10, 1 May 2024
  • ...ntative and/or provide a daily copy of measured quantities to the engineer’s representative so discrepancies can be identified promptly. ...issue is known or being dealt with, they need to bring it to the engineer’s attention.
    28 KB (4,153 words) - 15:37, 11 January 2024
  • ...r_Contract_Revisions|procedure for developing costs for Contract Revision]]s 109.05.B (Unit Prices) or 109.05.C (Negotiated Prices) are unsuccessful the ...r and engineer will collaborate to develop a work plan from the contractor’s documented proposal. The work plan can vary in length/detail depending upo
    41 KB (6,267 words) - 17:31, 6 June 2023
  • In accordance with 23 CFR 635.102 and 23 CFR 635.120, FHWA’s Michigan Division has further clarified the definition of major changes as ...) FHWA Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)]. FHWA Form 1365 are no longer required.
    50 KB (7,380 words) - 16:11, 1 April 2024

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)