Search results

Jump to navigation Jump to search
  • ...sponsible for the project documentation regardless of who is on their team or how long they have been in charge of the project. Certified engineers who a ** Current Office Technician Certificate of Completion OR
    10 KB (1,464 words) - 13:56, 29 November 2023
  • ...nal requirements at a less cost or improve value or service at no increase or a minor increase in cost. The net savings of each proposal is usually share ...of maintenance, desired appearance, impact on utilities and right-of-way, or the design and safety standards.
    9 KB (1,297 words) - 14:57, 11 October 2022
  • If the HMA surface removed is 5 inches (130 mm) or less in thickness, the surface is considered part of the underlying materia ...in thickness and overlying a material such as concrete, masonry, aggregate or earth that is also removed, it will be measured and paid for as '''Pavement
    10 KB (1,390 words) - 10:07, 13 September 2023
  • ...e. Conversely a particular section might have topics that are unique and/or supplementary to the template.'' ...section should also describe why the work is done or what purpose the item or work serves in general. (IE Paint marking helps drivers delineate traffic
    14 KB (2,089 words) - 09:11, 11 April 2024
  • ...staked by project personnel with assistance of the Region Resource Analyst or Roadside Development personnel. ...on or species on the plans. This record will fulfill the requirements for documentation of location of the various plants. This report is subject to revision to c
    6 KB (797 words) - 17:08, 27 March 2023
  • ...cy:</u> A file deficiency that can be corrected with proper documentation or a letter to the file. *Documentation added to the file
    13 KB (1,768 words) - 11:05, 13 July 2023
  • ...ng documentation for this pay item is to be an IDR posted by the engineer (or their representative) and placed in the project file. The IDR is to be gen
    2 KB (256 words) - 17:42, 12 January 2022
  • ...on/index.php/Certified_Engineer_Process MDOT’s Certified Engineer Program] or is not eligible to obtain certification under this program. The non-certif ...he FPR is to verify that final contract quantities are supported by proper documentation and have been paid in accordance with contract documents and MDOT’s Stand
    19 KB (2,779 words) - 17:01, 6 November 2023
  • -- This module implements {{documentation}}. local cfg = mw.loadData('Module:Documentation/config')
    35 KB (4,418 words) - 09:28, 3 July 2014
  • ...ing, testing and acceptance can be referred to the Region materials staff, or to the Construction and Technology Support Area staff. ...e during their preparation, storage and use regardless of previous testing or manufacturer certifications. This applies to materials such as HMA and con
    5 KB (767 words) - 14:44, 21 September 2023
  • ...color, religion (in the context of employment), sex, national origin, age, or disability. ...is MDOT’s Title VI Coordinator. Orlando can be contacted at 517-241-7462 or at [mailto:CurryO@michigan.gov Orlando Curry] for any issues related to civ
    16 KB (2,309 words) - 14:51, 21 March 2024
  • ...ate to a category of projects, capital program administrative testing, and/or to perform testing related work for an un-programmed project wherein the ac *Construction season closing process, including preparation of forms, documentation, manual updates, etc. (salary and travel).
    5 KB (701 words) - 08:12, 16 October 2023
  • ...ication should be documented accordingly by means of IDR, or other project documentation. ...he material delivered to the project against the materials source list and/or FieldBook associations.
    4 KB (611 words) - 16:09, 25 May 2022
  • ...n Engineering || Provide full or as needed construction administration and/or inspection services. ...onnection and processing of multiple sub-systems data, and the display and/or control in a Traffic Operations Center (TOC). A TOC is a physical location
    17 KB (2,411 words) - 15:12, 19 June 2017
  • ...ges– These types of changes will not require additional approval processes or assembly of review teams. ...e program either monetarily, staffing, equipment, procedural, material and documentation requirements. Type 3 Major Changes are noted in the Major Changes Table on
    5 KB (787 words) - 14:52, 19 December 2023
  • ...s will be applicable for trunkline projects with final completion dates on or after June 5, 2024. ...-compliance may assist the Contract Performance Evaluation Review Team and/or MDOT’s Prequalification Committee when reviewing patterns and trends. Th
    20 KB (2,842 words) - 13:29, 4 October 2023
  • ...ade mix designs and provide them to the Engineer along with the supporting documentation (temperature, slump, air content and compressive strength) from each trial ...pecifications include either non-standard (MDOT specified) concrete mixes, or ones that are known to generate compressive strengths substantially higher
    26 KB (3,908 words) - 11:41, 10 January 2024
  • ...and diligent in promptly submitting material documentation and supporting documentation per the specifications and special provisions in the contract. If they have #The contractor should have a quality assurance check on documentation submittals to ensure that the submittals are in the correct format with ide
    28 KB (4,153 words) - 15:37, 11 January 2024
  • ...ls used in MDOT’s construction and maintenance projects must be tested and/or approved before incorporation into the project. Materials are approved bas Proprietary materials or products previously evaluated and approved by C&T. Approved materials and
    21 KB (3,052 words) - 16:41, 22 November 2023
  • ...and Technology Environmental Compliance Group by telephone at 517-322-1205 or Fax at 517-322-5664. Other backup numbers to call are 517-322-1647 and 517 ** Verification that the tank is located within MDOT or local agency ROW.
    9 KB (1,330 words) - 14:21, 23 September 2021

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)