  • ...and understanding the Contractor's work with other projects working within or near the contract limits. * Is required to resolve construction disputes and/or claims concerning contract time.
    8 KB (1,206 words) - 14:27, 29 February 2024
  • ...ers directly at the construction sites and later transferred to a network, or desktop computer, located in the field office responsible for managing the ...er and FieldBook Tutorials, FieldManager User’s Guide, Trns*port interface or technical questions, please contact the Help Desk [mailto:MDOT-Construction
    25 KB (3,668 words) - 12:17, 1 May 2024
  • ...-of-way (ROW) agreements should also be checked for any special provisions or agreements. ...n on the plans. Stumps and roots need not be removed from peat excavation or disposal areas. Stumps may be buried with a minimum cover of 2 feet (700 m
    8 KB (1,133 words) - 12:01, 28 March 2023
  • ...not reasonably be determined, the work starts before prices are negotiated or other payment methods for compensation are impractical. Any work started b ...eer must approve the additional work (Approval can be documented on an IDR or an e-mail).
    41 KB (6,267 words) - 17:31, 6 June 2023
  • ...nstruction and maintenance projects by the department, railroad companies, or private industry are the basis for most railroad-highway projects. ...ment, field, and operations personnel to facilitate safety recommendations or activities related to proposed projects. Non-trunkline on-site inspections
    12 KB (1,772 words) - 17:35, 14 December 2023
  • MDOT will not sample, nor test for quality control or assist in controlling the Contractor’s production operations. However, c ...Engineer records of QC tests and inspections within 24 hours after testing or inspection in a format acceptable to the Engineer.
    30 KB (4,172 words) - 17:23, 3 January 2024
  • Progress clause documentation must also take this 12 month acceptance period into account for final proje ...imes associated with unique special provisions where certain manufacturers or products are specified. More information regarding steel superstructure is
    14 KB (2,146 words) - 13:54, 29 November 2023
  • <b>Local Public Agency (LPA):</b> The Michigan Public Act 51 city, village, or county road commission/department who applied, thru MDOT, for funds to perf ...te project signatory responsibilities to MDOT staff of an equivalent level or higher.
    30 KB (4,182 words) - 18:40, 13 December 2023
  • ...treams. Any work below the ordinary high-water elevation of an inland lake or stream requires an Inland Lakes and Streams Permit. ...ny construction, enlargement, repair, reconstruction, alteration, removal, or abandonment of any dam requires a Dam Safety Permit.
    19 KB (2,830 words) - 17:02, 15 February 2024
  • ...Engineer. The Engineer has 30 days to address all deficiencies and submit documentation once the Final Project Review Report is received. ...details are fresh and personnel are readily available. When all work and documentation is complete then the Final Project Review can be completed.
    16 KB (2,430 words) - 15:46, 6 May 2021
  • ...be required of all Contractors having a contract which is funded in whole or in part with federal funds. The Contractor may, after award, request a waiver or modification of the DBE participation goal. The Contractor must submit evid
    27 KB (4,137 words) - 14:31, 17 April 2024
  • ...mpactive effort would only drive the backfill into the remaining material, or where it is not desirable to impound water in impervious soils that would t ...ground is not a pay item in this instance. Density tests are required for documentation.
    7 KB (1,044 words) - 10:08, 13 September 2023
  • ...equipment when inside containments or when exposed to dust containing lead or solvent and paint fumes. At a minimum, MDOT is required to provide a medica ...l notify the Engineer of the employee’s test results if the results are at or above 15 µg/dL.
    33 KB (4,797 words) - 11:46, 25 April 2023
  • ==BRIDGE CONSTRUCTION AND BRIDGE DECK CONSTRUCTION INSPECTION AND DOCUMENTATION== ...rcement, wet and dry bridge deck concrete depth measurements, and required documentation for bridge construction inspection. This document must be coordinated with
    33 KB (4,932 words) - 16:38, 12 May 2021
  • ...dge Elements and Systems (PBES) other than beams, and sound wall posts and/or panels. ...g and refer to whether the strands are tensioned before concrete placement or after concrete placement, respectively.
    27 KB (4,105 words) - 11:45, 19 January 2022
  • ...the past would have been covered with sod are now being treated with mulch or mulch blanket, as well as topsoil, seed and fertilizer. The amount of sod ...be dressed to plan tolerance. Plans will usually show areas requiring sod or mulch blanket. A permit to place should be issued before work begins.
    15 KB (2,398 words) - 13:12, 26 July 2022
  • ...orporated in the work. Materials should be checked for damage in shipment or storage and to insure conformity to the required dimension, appearance and ...duction, manufacture or supplier's storage by the Bureau of Field Services or an appointed representative. The project office should receive the resulti
    15 KB (2,322 words) - 11:43, 19 January 2022
  • ...ssed for any revisions to the contract that alters the nature, scope, cost or schedule of the project. ...fication. Contract revisions may be positive or negative in dollar value, or even have no dollar value associated. The criteria for determining approva
    50 KB (7,380 words) - 16:11, 1 April 2024
  • ...e typically used on MDOT projects, column type supports from below, hanger or suspension type supports from above, and diaphragm types, where the hydraul ...emporary hanger rods are used, reject any rods with notches, nicks, welds, or excessive corrosion. Each length of bar used to make hanger rods must be sa
    14 KB (2,289 words) - 17:29, 10 April 2023
  • ...onduit or pipe that is constructed to convey treated water for consumption or to provide water for emergency services such as Fire Departments. The pipes ...ide of the pipe. Each section of pipe can either come with push-on joints or be bolted mechanically. Note that there may be additional material require
    18 KB (2,799 words) - 14:01, 27 September 2023