  • [[File:IDR3.png|thumb|center|500px|Figure 101-3 - Sample IDR]] :3. The document names for original and revised IDRs must follow the current
    25 KB (3,668 words) - 12:17, 1 May 2024
  • ...given three (3) opportunities for each line width. After three (3) unsuccessful attempts for any line width, the equipment will be denied cer :'''The contractor will be allowed three (3) appointments to accomplish STEP 1 and STEP 2. If a vehicle cannot be certi
    56 KB (7,443 words) - 17:48, 9 October 2023
  • [[File:823-3.jpg|600px|thumb|center|'''Figure 3 - Valve Box''']] ...depth requirements shown on the plans. The minimum trench width should be 3 to 4 times the pipe diameter to allow for work on all sides of the pipe, un
    18 KB (2,799 words) - 14:01, 27 September 2023
  • <center>≥ 3 days</center> ...the second and next to last measurement will each be made with 2 inches to 3 inches of the straightedge resting on the existing pavement. Any irregular
    23 KB (3,714 words) - 10:16, 13 September 2023
  • ...ersight (S&O) Agreement] detailing the arrangement between FHWA’s Michigan Division and MDOT regarding agency roles and responsibilities with respect to federa ...d forward the contract modification and letter to the Financial Operations Division.
    30 KB (4,182 words) - 18:40, 13 December 2023
  • ...tremie applications without admixture or with Type A or D admixture or (i) 3- to 8-inch slump for tremie applications after the addition of Type F or G ...ions. This interlock is durable and ideal for repeated use. See Figure 704-3 below for the ball and socket type interlock. Hot rolled sections are typic
    30 KB (4,732 words) - 15:44, 29 February 2024
  • ...st to process weekly estimates is to be submitted to the Contract Services Division. ...ng that could be utilized on other MDOT projects. The Financial Operations Division, must be notified when all construction work is complete and accepted, but
    28 KB (4,153 words) - 15:37, 11 January 2024
  • Delineator and 3# U-Channel Posts :*Contact the Operations Field Services Division’s Structural Fabrication Unit ([mailto:MDOT-StructuralFabrication@michiga
    14 KB (2,146 words) - 13:54, 29 November 2023
  • ...s/construction/index.php/E-Construction#e-Construction.2FPaper_File_System Division 1 e-construction tables]. The element sequence and general format are as ...forms/GetDocument.htm?fileName=1903C.pdf 1903-C]||1903C YYYY-MM-DD 5E1 STA 3||Permanent||11/28/2023
    57 KB (6,792 words) - 10:37, 13 May 2024
  • In accordance with 23 CFR 635.102 and 23 CFR 635.120, FHWA’s Michigan Division has further clarified the definition of major changes as noted below: 3. Changes in character or scope of the project. Examples of these types of c
    50 KB (7,380 words) - 16:11, 1 April 2024
  • It is important to note that cleaning and coating 3 feet each side of the centerline of the pin and hanger is included in the H [[Category: Division 7]]
    14 KB (2,289 words) - 17:29, 10 April 2023
  • To prevent damage to the pipe, a minimum of 3 feet (1 meter) of cover must be maintained at all times, except when trimmi [[Category:Division 4]]
    15 KB (2,250 words) - 12:56, 4 October 2023
  • ...er for placement into the corresponding ProjectWise folder. See Figure 708.3 for more information on the fabrication inspection process. [[File:Fig_708.3.png|600px|thumbnail|center|Figure 708.3 – Structural Precast Concrete Fabrication Inspection Flowchart]]
    27 KB (4,105 words) - 11:45, 19 January 2022
  • ...usceptible to frost heave, such as silt, will not be placed within the top 3 feet (1 m) of subgrade when constructing embankments. ...ice from the embankment area. If the original ground contains more than 0.3 foot (90 mm) of frost within the limits of 1 on 1 slopes spreading outward
    78 KB (12,236 words) - 14:45, 21 September 2023
  • ...o an edge depth of ½ inch, and the concrete is to be removed to a depth of 3 inches measured from the edge of the concrete surface. Ensure concrete is ...slump. During hot and windy weather, the Contractor may increase slump to 3 in to 4 in, as determined by the Engineer.
    84 KB (13,299 words) - 11:46, 19 January 2022
  • [[File:706-3.jpg|800px|thumb|center|'''Figure 706-3 Standard Forming Components''']] ...and spaced (as measured between beam centers) at approximately the 1/4 and 3/4 points for beam spacings less than 9 feet and at approximately the 1/6, 1
    49 KB (7,967 words) - 12:41, 27 February 2024
  • [[File:Figure 104.01-3.JPG|thumb|center|600px|Topo Patterns]] ...taining the actual beam elevations. (See [[701 - Portland Cement Concrete|Division 7]] of this manual for more on structure elevations.)
    201 KB (30,214 words) - 14:43, 19 June 2017
  • [[File:Fig 705-3.png|thumb|center|600px|Figure 705-4 - Typical Nylon Hammer Cushions]] ...e used, then the pile should be driven until the pile reaches capacity for 3 consecutive inches or there are 12 blows in one inch.
    32 KB (5,122 words) - 14:16, 29 February 2024
  • [[File:Fig707.3.png|900px|thumbnail|center|Figure 707.2 - Steel Fabrication Inspection Flow ...n records are stored in the project folder in ProjectWise. See Figure 707.3 for a sample inspection memorandum.
    45 KB (7,017 words) - 13:22, 26 July 2022
  • <center>3</center> * Broken or missing welds as shown in Figure 602-3.
    87 KB (13,988 words) - 15:30, 8 May 2024