Search results

Jump to navigation Jump to search
  • ...t file. The IDR is to be generated when the contract value earned reaches 5, 10, and 25 percent value of the original contract amount. The notation of ...tract ID. As an example, when the original contract amount earned reaches 5 percent, all projects within the contract are to be paid at 50 percent of t
    2 KB (256 words) - 17:42, 12 January 2022
  • [[Category:Division 5]]
    610 bytes (69 words) - 18:16, 15 December 2021
  • [[Category:Division 5]]
    596 bytes (67 words) - 18:17, 15 December 2021
  • ...icable for trunkline projects with final completion dates on or after June 5, 2024. ...to local agency jobs and MDOT jobs with final completion dates before June 5, 2024.
    3 KB (385 words) - 15:22, 26 September 2023
  • <center><span STYLE="font: 40pt arial;">'''Division 4 Supplemental Information'''</span></center> ...nd verified using a proving ring. The mandrel is sized to allow for up to 5% deformation of the installed pipe. Nominal pipe diameters are defined in
    5 KB (809 words) - 14:29, 23 September 2021
  • [[Category:Division 5]]
    1 KB (174 words) - 18:17, 15 December 2021
  • ...nd verified using a proving ring. The mandrel is sized to allow for up to 5% deformation of the installed pipe. Nominal pipe diameters are defined in ...equired backfilling and compaction of the trench is completed, but between 5 and 10 work days prior to pavement surfacing or completion of final grade,
    5 KB (826 words) - 16:06, 6 May 2021
  • The Construction Field Services (CFS) Division has revised the Hot Mix Asphalt (HMA) Production Manual. A brief descripti * Marshall Mixtures – Subsection 5: Added two new points at the end. (Page 6)
    4 KB (560 words) - 15:14, 19 June 2017
  • Any pipe with a top elevation within 5 feet (1.5 m) of the top of the pavement will be reviewed for removal. [[Category:Division 2]]
    2 KB (304 words) - 10:05, 13 September 2023
  • ...t.htm?fileName=1963.pdf Form 1963]. The sample size will not exceed five (5) items unless major deficiencies are discovered. Some areas on [https://md [[Category:Division 1]]
    4 KB (556 words) - 15:47, 6 May 2021
  • [[Category:Division 5]]
    2 KB (272 words) - 18:14, 15 December 2021
  • See [[501 - HMA Mixtures|Division 5, HMA]] and [[601 - PCC Pavement Mixtures|Division 6, Concrete]] for general materials requirements. Review the plans and [ht [[Category: Division 8]]
    4 KB (545 words) - 12:41, 19 January 2022
  • .... The current requirement is for the requester to submit the form at least 5 work days prior to the anticipated start date of excavation work (excludes [[Category:Division 1]]
    3 KB (370 words) - 11:08, 25 April 2023
  • [[Category:Division 5]]
    2 KB (335 words) - 18:15, 15 December 2021
  • <center>5</center> [[Category: Division 8]]
    3 KB (428 words) - 12:44, 19 January 2022
  • If the HMA surface removed is 5 inches (130 mm) or less in thickness, the surface is considered part of the If the HMA surface removed is over 5 inches (130 mm) in thickness and overlying a material such as concrete, mas
    10 KB (1,390 words) - 10:07, 13 September 2023
  • ...ed of reinforced or nonreinforced concrete. [[601 - PCC Pavement Mixtures|Division 6]] of this manual should be referenced for concrete construction. Thickne <center>5 inches (125 mm)</center>
    5 KB (706 words) - 11:49, 19 January 2022
  • *Bridge Barrier Railing, Type 5 ...:Fig711-02.png|200px|thumbnail|right|Figure 2 Bridge Barrier Railing, Type 5]]
    7 KB (1,050 words) - 11:46, 19 January 2022
  • <center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    68 KB (8,802 words) - 12:10, 1 May 2024
  • ...gh the Construction Operations Engineer in the Construction Field Services Division. The VEDT membership will consist of the following individuals (or their de ::e. Administrator of the Development Services Division (if a local agency project)
    9 KB (1,297 words) - 14:57, 11 October 2022
  • <center><span STYLE="font: 15pt arial;">'''Construction Field Services Division '''</span></center> |<center>11/5/2018</center>||<center>[[Preconstruction_Meeting|Preconstruction Meeting]]<
    28 KB (3,726 words) - 16:02, 8 March 2023
  • | colspan="5" | | colspan="5" |
    13 KB (1,768 words) - 11:05, 13 July 2023
  • ...o check for irregularities. Any variation exceeding 3/16 inch in 10 foot (5.0 mm in 3 m) in the gutter or top of the curb is to be corrected before th Face forms are supported from the back form by use of division plates. See '''''Figure 802-3'''''. In addition to supporting the face fo
    12 KB (1,916 words) - 11:49, 19 January 2022
  • ...kness of the HMA pavement after cold-milling should range from 4 inches to 5 inches (100 mm to 125 mm). [[Category:Division 3]]
    4 KB (552 words) - 16:44, 12 January 2022
  • !Updated!! Division !! Section !! Summary !! What Changed |<center>5/13/2020</center>||<center>1 Supplemental</center>||<center>[[109.07_Final_I
    16 KB (2,430 words) - 15:46, 6 May 2021
  • ...vailable with the Construction Contracts Unit, Construction Field Services Division. *Initial Sample Size - A minimum of 5 percent of contract pay items (rounded up) must be reviewed initially or a
    19 KB (2,779 words) - 17:01, 6 November 2023
  • :5. Consultant project stakeholders&nbsp;&nbsp;(Development and/or Delivery St [[Category:Division 1]]
    7 KB (1,055 words) - 11:29, 14 July 2020
  • <center>5</center> [[Category: Division 8]]
    6 KB (797 words) - 17:08, 27 March 2023
  • ...compound is applied at a rate of 1 gallon per 25 square yards (1 liter per 5 m<sup>2</sup>). ...mm). Plain precast must be 6 inches (150 mm) thick and 15 square feet (1.5&nbsp;m2) surface area.
    4 KB (644 words) - 17:17, 19 September 2023
  • ...section 109.05.C, the contractor must provide the detailed estimate within 5 calendar days. A detailed cost estimate is recommended for justification o [[Category:Division 1]]
    6 KB (868 words) - 13:19, 6 June 2023
  • ...ording to specifications and contain an expansive admixture that creates a 5-10% increase in volume. They also contain very little chlorides and thus a [[Category:Division 7]]
    5 KB (749 words) - 11:43, 19 January 2022
  • ...ID=c961274a08c1423164e297c9d95b4e02&node=pt29.1.5&rgn=div5 29 CFR 3.3 Part 5 Federal Contract Law Provisions] electronic signatures are defined as a com [[Category: Division 1]]
    8 KB (1,208 words) - 15:30, 20 September 2023
  • When erecting woven wire fence, a line post must be placed every 15 feet (5 meters). Every end, corner, gate, angle, intersection or intermediate post [[Category: Division 8]]
    6 KB (864 words) - 12:42, 19 January 2022
  • The Construction Field Services Division (CFS) maintains a recommended procedure guide for damaged coating repair th :EGLE, Waste and Hazardous Material Division
    33 KB (4,797 words) - 11:46, 25 April 2023
  • A drainage structure shall not be placed within 5 feet (1.5 m) of the spring point of a street return so that the transverse joint will ...ortar. The bricks or blocks are then laid in courses with mortar joints 0.5 inch (13 mm) thick ± 0.1 inch (3 mm). Mortar joints should be of uniform
    7 KB (999 words) - 17:47, 12 January 2022
  • ...for the purpose of records retention) is the date the Financial Operations Division (FOD) does the final billing to FHWA for federal funds. In addition to the | [//{{SERVERNAME}}/images_construction/5/5d/IPhone_as_mouse_in_Citrix_on_iPad.pdf IPhone as mouse in Citrix on Ipad]
    12 KB (1,824 words) - 16:49, 18 April 2024
  • ...be considered cause for rejection, unless these defects exist in more than 5 percent of the entire shipment or delivery. ...’s marks designating the top and bottom of the pipe shall not be more than 5 degrees from the vertical plane through the longitudinal axis of the pipe.
    16 KB (2,323 words) - 17:47, 12 January 2022
  • ...ovals have been obtained, provide a copy to the Construction Field Service Division Resource Specialist for inclusion into the MiEnviro permit system. ...tions within that time frame are not possible the engineer must within the 5 days, submit a plan to EGLE describing the proposed actions. It is recomme
    19 KB (2,830 words) - 17:02, 15 February 2024
  • .../project engineer is notified of all commitments by the Contracts Services Division (CSD). The email notification includes all DBE commitment specifics and whe ...pecialist at 248-302-4589. Replacement of a DBE company requires a five (5) day written notice to the DBE firm with a copy to the construction/project
    27 KB (4,137 words) - 14:31, 17 April 2024
  • 5 to 10 weeks - Consult Work Zone Engineer 5 to 10 weeks - Consult Work Zone Engineer
    14 KB (2,146 words) - 13:54, 29 November 2023
  • ...For welded members, see American Welding Society, Bridge Welding Code, D1.5. <center>[[File:714 Fig 5.png|thumb|center|600px|Figure 714-5 - ASTM A6 permitted variatons in sectional dimensions]]</center>
    19 KB (2,733 words) - 11:47, 19 January 2022
  • ...icable for trunkline projects with final completion dates on or after June 5, 2024. ...to local agency jobs and MDOT jobs with final completion dates before June 5, 2024.
    20 KB (2,842 words) - 13:29, 4 October 2023
  • ...e concrete must be kept continuously wet and above 40 degrees for at least 5 days. Five cores must then be taken from the panel and tested in accordance Keep test panels continuously moist and above 40°F for 5 days after shotcrete application. Remove at least five cores from the test
    15 KB (2,249 words) - 18:23, 15 February 2024
  • ...’s marks designating the top and bottom of the pipe shall not be more than 5 degrees from the vertical plane through the longitudinal axis of the pipe. ...ng ability of corrugated metal pipe (CMP). A desirable minimum slope of 0.5 percent is suggested for CMP culverts. Every means should be taken to prov
    15 KB (2,250 words) - 12:56, 4 October 2023
  • ...Slopes on the low side of superelevated pavements with superelevations of 5 percent and less, and tilted pavement of two or more lanes, will be set up [[Category: Division 8]]
    15 KB (2,398 words) - 13:12, 26 July 2022
  • * Muck or clean out bucket – see Figures 4 and 5 for a muck bucket example. [[File:Fig 718-5.png|600px|framed|center|Figure 5. Muck bucket bottom]]
    28 KB (4,324 words) - 11:40, 25 April 2023
  • In accordance with 23 CFR 635.102 and 23 CFR 635.120, FHWA’s Michigan Division has further clarified the definition of major changes as noted below: 5. Any changes to incentive requirements, liquidated damages, A+B provisions,
    50 KB (7,380 words) - 16:11, 1 April 2024
  • [[File:823-5.jpg|600px|thumb|center|'''Figure 5 - Hydrant Installation, with Gate Valve''']] ...veyor has provided stakes for the work. Typically survey stakes are offset 5 and 10 feet from the centerline of the work. There is potential that paint
    18 KB (2,799 words) - 14:01, 27 September 2023
  • ...t use de-foaming (air- detraining) admixtures. Furnish concrete containing 5.0 to 8.0 percent entrained air, except as follows: ::'''1.''' Provide an entrained air content of 5.5 to 8.5 percent for concrete containing Type F or Type G admixtures;
    12 KB (1,593 words) - 13:11, 26 July 2022
  • '''<nowiki>*</nowiki>''' Note that cementitious content may be reduced by 5% if a water reducer is used. '''<nowiki>*</nowiki>''' Note that cementitious content may be reduced by 5% if a water reducer is used.
    26 KB (3,908 words) - 11:41, 10 January 2024

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)