  • ...funded construction project. The same procedures for inspection, pay item documentation, quality control/quality assurance testing, and materials testing must be f
    1 KB (157 words) - 09:42, 3 January 2018
  • ...portance. Failure to follow the procedures can result in loss of State and/or Federal-Aid funding for the projects. ...intain current certification. All existing office technician certification or similarly titled certifications expire after four (4) years unless stated o
    2 KB (218 words) - 09:59, 3 April 2024
  • ==Interim Project Documentation Reviews== ...s early in the active portion of the project as practical to ensure proper documentation throughout the remainder of the project. Document all interim review findi
    4 KB (556 words) - 15:47, 6 May 2021
  • ...ions from established MDOT procedures are required related to construction documentation the Engineer must document a Letter to the File explaining the situation, r #A description of the issue/deficiency, deviation from contract or MDOT Construction Manual, including quantities and costs
    3 KB (387 words) - 15:48, 6 May 2021
  • -- Configuration for Module:Documentation -- Here you can set the values of the parameters and messages used in Module:Documentation to
    18 KB (2,100 words) - 09:28, 3 July 2014
  • ...ly funded project’s limits are proposed to be extended, regardless of cost or oversight responsibilities. '''''Failure to obtain environmental clearance ...ineer of Construction and Technology will notify the requestor of a denial or acceptance within five business days.
    4 KB (572 words) - 14:54, 19 January 2022
  • ===[[#Documentation|Documentation]]=== ...e to be removed or reduced to smaller diameter particles with a jackhammer or similar device.
    4 KB (536 words) - 14:18, 16 February 2022
  • ...warranty special provision still require inspection staffing and complete documentation prior to payment, including MDOT materials certifications, MDOT yield check ...ing projects, including those that contain special provisions 03SP502D and/or 03SP502E. These tasks include:
    6 KB (848 words) - 14:44, 19 January 2022
  • Perhaps the single most important type of project documentation is the Inspector’s Daily Report (IDR) and its variations. Because of the ...ntities by underlining, underlining in red, recording in a different color or some other method.
    3 KB (456 words) - 14:09, 28 January 2013
  • ...uing pay item adjustments can be found in the applicable special provision or the Standard Specifications for Construction. ...opriately evaluates potential negative assessments, rejection of material, or removal of material in a timely manner. The review will promote efficient
    9 KB (1,226 words) - 10:05, 2 May 2023
  • ...ion-635.123 23 CFR 635.123] outlines the regulations for determination and documentation of pay quantities. Materials specifically produced or purchased for the project and stockpiled for use on the project may be paid
    4 KB (456 words) - 09:22, 11 July 2023
  • ...erial on unstable, saturated or rutted subgrade and that placement methods or equipment do not distort (rut) the existing subgrade. ...obtained. This information needs to be recorded in a field book or other documentation.
    3 KB (427 words) - 14:12, 16 February 2022
  • ...h any request for an extension to the durations, whether by the Contractor or the Department, documented in writing. ...notified of claim prior to settlement and have opportunity to review claim documentation prior to settlement. Regulations concerning FHWA participation in claims c
    4 KB (643 words) - 12:08, 12 March 2024
  • ...tion 109.05.C. When negotiating price(s), the engineer should include one or more of the following applicable details during the analysis and justificat ...it prices on other projects in the area, weighted average unit prices, and/or historical prices for similar work.
    6 KB (868 words) - 13:19, 6 June 2023
  • ...subcontract attachments, in their office or project files (either in paper or electronic format). Subcontracting requirements do not affect the required ...FS) subcontract compliance analyst to schedule and perform the interim and/or post construction reviews. The review is performed to ensure the subcontrac
    5 KB (744 words) - 17:38, 12 January 2022
  • #Changed Condition Utility Delay - Utility delays and/or extras resulting from the department’s design phase utility coordination ...uction defines compensable delays. Although this section includes utility or railroad interference within the project limits, the delays caused by [http
    9 KB (1,295 words) - 10:58, 4 May 2022
  • ...ce Assessment Program (CAP) review noted several findings related to field documentation on construction projects. FHWA and MDOT [[media:CAP Action Plan MAD JUN1720 ...nspector Daily Reports, calculations, forms, reporting requirements, field documentation, etc. This procedure will be incorporated into the MDOT Construction Manua
    3 KB (453 words) - 15:43, 6 May 2021
  • local namespace = getNamespace(args) or 'other' -- "other" avoids nil table keys local params = mappings[namespace] or {}
    6 KB (836 words) - 09:28, 3 July 2014
  • ...incorporated into the project, regardless if they are defined as temporary or not, must meet the requirements in the Special Provision for Source of Stee * Steel or iron products used in pavements, bridges, tunnels or other structures, which include, but are not limited to, the following: fab
    14 KB (2,171 words) - 07:32, 19 September 2023
  • ..., and creating egress and ingress for temporary batch plants. When ingress or egress is added to a current interstate, MDOT must request written permissi ...-approved during the design process, but any new breaks, location changes, or other modifications occurring after letting will need to follow the guidanc
    4 KB (581 words) - 11:59, 22 May 2023