Pages without language links
Jump to navigation
Jump to search
The following pages do not link to other language versions.
Showing below up to 50 results in range #1 to #50.
View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)
- 1001 - Concrete Production Equipment and Facilities
- 1002 - Contractor Quality Control for Concrete
- 1003 - Quality Assurance (Acceptance) for Concrete
- 1004 - Portland Cement Concrete Mixtures
- 1005 - Mortar and Grout Mixtures
- 1006 - Patching, Repair, & Overlay Mixtures
- Invalid title with namespace "(Main)" and text "101.4_INSPECTOR’S_DAILY_REPORT_(IDR)"
- 101 - Terms, Format, and Conditions
- 102.01 Prequalification of Bidders
- 102.02 Contents of Proposal - Progress Clause
- 102.03 Interpretation of Bid Items in the Proposal
- 102.04 Examination of Plans, Specifications, and Work Site
- 102.05 Preparation of Bid Items in the Proposal
- 102.06 Irregular Bids
- 102.07 Delivery of Bid
- 102.08 Withdrawal or Revision of Bid
- 102.09 Downloading of Bids
- 102.10 Bid Review
- 102.11 Bid Rejection
- 102.12 Bid Rejection Appeal
- 102.13 Consideration of Bids
- 102.14 Execution and Award of Contract
- 102.15 Requirements of Contract Bonds
- 102.16 Bid Guaranty Payment
- 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)
- 102.18 - OJT Program
- 102.19 Evaluation of Contractor Performance and Contract Non-Compliance
- 103.01 Intent of the Contract
- 103.02 Contract Revisions
- 103.03 Contractor Engineer Communication
- 104.01 Authority of the Department
- 104.02 Plans and Working Drawings
- 104.03 Deviations from the Plans
- 104.04 Conformity with the Contrat
- 104.05 Removal of Unauthorized Work
- 104.06 Coordination of Drawing Dimensions and Contract Documentation
- 104.07 Contractor Obligations
- 104.08 Cooperation by the Contractor
- 104.09 Lines, Grades, and Elevations
- 104.10 Claim for Extra Compensation or Extension of Time
- 104.11 Work Zone Safety and Mobility
- 104.12 Approval for Use of the Right of Way
- 105.01 Quality and Scope of Supply
- 105.02 Natural Material Sources Found Within the Excavation Limits
- 105.03 Borrow Materials
- 105.04 Miscellameous Quantities
- 105.05 Approval of Materials Incorporated into the Work
- 105.06 Storage of Materials
- 105.07 Handling and Transporting Materials
- 105.08 Nonconforming Materials