Difference between revisions of "Main Page"

From MediaWiki
Jump to navigation Jump to search
Line 109: Line 109:
 
|-
 
|-
 
|<center>07/02/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[708_-_Prestressed_Concrete|708 - Prestressed Concrete]]</center>||Major revision to entire section content on Prestressed_Concrete.  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=708_-_Prestressed_Concrete View Here]
 
|<center>07/02/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[708_-_Prestressed_Concrete|708 - Prestressed Concrete]]</center>||Major revision to entire section content on Prestressed_Concrete.  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=708_-_Prestressed_Concrete View Here]
−
|-
 
−
|<center>05/29/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_6 Division 6]</center>||<center>[[602_-_Concrete_Pavement_Construction|602 - Concrete Pavement Construction]]</center>||Major revision to entire section content on 602 - Concrete Pavement Construction  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=602_-_Concrete_Pavement_Construction View Here]
 
−
|-
 
−
|<center>05/01/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=Frequently_Searched_Items Frequently Searched Items]</center>||Updated the [[Frequently_Searched_Items|Frequently Searched Items page]] (top left corner menu). ||[https://mdotwiki.state.mi.us/construction/index.php?title=Frequently_Searched_Items View Here]
 
−
|-
 
−
|<center>04/30/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=Standard_Naming_Convention#MDOT_Standard_Naming_Convention MDOT Standard Naming Convention]</center>||Major update of MDOT Standard Naming Convention from old PDF format to WikiMedia table in Construction Manual.  Naming Convention information can now be sorted by Name, Numbers, Form Number, Date of last revision, etc. by clicking on table header columns.  All form numbers are also hyperlinked directly to the form. ||[https://mdotwiki.state.mi.us/construction/index.php?title=Standard_Naming_Convention#MDOT_Standard_Naming_Convention View Here]
 
−
|-
 
−
|<center>04/08/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=Category:Division_8 Division 8]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=807_-_Guardrail,_Guardrail_Terminals,_and_Miscellaneous_Posts#Guardrail 807_-_Guardrail, Guardrail Terminals, and MiscellaneousPosts]</center>||Updated Section 807 to reflect new guidance on lapping guardrail for temporary traffic shifts. ||[https://mdotwiki.state.mi.us/construction/index.php?title=807_-_Guardrail%2C_Guardrail_Terminals%2C_and_Miscellaneous_Posts&type=revision&diff=8258&oldid=6563 Compare Here]
 
−
|-
 
−
|<center>04/02/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[810_-_Permanent_Traffic_Signs_and_Supports|810 - Permanent Traffic Signs and Supports]], [[819_-_Electrical_and_Lighting|819 - Electrical and Lighting]], [[820_-_Traffic_Signals|820 - Traffic Signals]], [[826_Intelligent_Transportation_Systems|826 - Intelligent Transportation Systems]]</center>||Updated contents of 810, 819, 820 & 826 to reflect changes in anchor bolt inspection procedures.||[https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanent_Traffic_Signs_and_Supports#INSPECTION_.26_TESTING View Here]
 
−
|-
 
−
|<center>04/01/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09 - Archeological and Historical Findings]]</center>||Updated Section 107.09 Archeological and Historical Findings to reflect new contact information for MDOT LAP Archaeologist||[https://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&type=revision&diff=8222&oldid=6842 Compare Here]
 
−
|-
 
−
|<center>02/29/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[710_-_Waterproofing_and_Protective_Covers|710 - Waterproofing and Protective Covers]]</center>||Major revision to entire section content on Waterproofing and Protective Covers.  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=710_-_Waterproofing_and_Protective_Covers View Here]
 
−
|-
 
−
|<center>02/29/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[704_-_Steel_Sheet_Piling_and_Cofferdams|704 - Steel Sheet Piling and Cofferdams]]</center>||Major revision to entire section content on Steel Sheet Piling and Cofferdams.  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=704_-_Steel_Sheet_Piling_and_Cofferdams View Here]
 
−
|-
 
−
|<center>02/29/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[705_-_Foundation_Piling|705 - Foundation Piling]]</center>||Major revision to entire section content on Foundation Piling.  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=705_-_Foundation_Piling#CONSTRUCTION View Here]
 
−
|-
 
−
|<center>02/13/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[706_-_Structural_Concrete|706 - Structural Concrete]]</center>||Major revision to entire section content on Structural Concrete.  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=706_-_Structural_Concrete View Here]
 
−
|-
 
−
|<center>01/18/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[709_-_Timber_Sturctures|709 - Timber Sturctures]]</center>||Major revision to section content on Timber Bridge Structures.  Addition of pictures, figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=709_-_Timber_Sturctures View Here]
 
−
|-
 
−
|<center>01/03/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[FHWA’s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan)|FHWA Risk-Based Project Involvement]]</center>||Updated content to include link to 2024 RBPI project list.
 
−
||[https://mdotwiki.state.mi.us/construction/index.php?title=FHWA%E2%80%99s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan) View Here]
 
−
|-
 
−
|<center>12/05/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Division 10]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=1004_-_Portland_Cement_Concrete_Mixtures 1004 Portland Cement Concrete Mixtures]</center>||Relocated former content in 601 to 1004.  Updates and new content added.||[https://mdotwiki.state.mi.us/construction/index.php?title=1004_-_Portland_Cement_Concrete_Mixtures&type=revision&diff=7745&oldid=7516 Compare Here]
 
−
|-
 
−
|<center>11/23/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Division 10]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=1003_-_Quality_Assurance_(Acceptance)_for_Concrete 1003 Quality Assurance for Concrete]</center>||Relocated former content in 605 to 1003.  Updates and new content added.||[https://mdotwiki.state.mi.us/construction/index.php?title=1003_-_Quality_Assurance_%28Acceptance%29_for_Concrete&type=revision&diff=7783&oldid=7739 Compare Here]
 
−
|-
 
−
|<center>11/22/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Division 10]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=1002_-_Contractor_Quality_Control_for_Concrete 1002 Contractor Quality Control for Concrete]</center>||Relocated former content in 604 to 1002.  Updates and new content added.||[https://mdotwiki.state.mi.us/construction/index.php?title=1002_-_Contractor_Quality_Control_for_Concrete&type=revision&diff=7853&oldid=7514 Compare Here]
 
−
|-
 
−
|<center>10/18/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||Updated the Indirect Testing coding for FY24||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges View Here]
 
−
|-
 
−
|<center>10/11/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[811_-_Permanent_Pavement_Markings#Uniform_Price_Adjustment.2C_Regular_Dry_Paint_and_Low_Temperature_Waterborne_Paint|811 Permanent Pavement Markings]]</center>||Updated Permanent Pavement Markings payment table to include 2023 price adjustments||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&action=historysubmit&type=revision&diff=7717&oldid=7461 Compare Here]
 
−
|-
 
−
|<center>9/26/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[823_-_Water_Mains|823 - Water Mains]]</center>||Added new content to previously empty Section 823 with pictures, video, and re-format to new Construction Manual style.||[https://mdotwiki.state.mi.us/construction/index.php?title=823_-_Water_Mains&type=revision&diff=7654&oldid=6579 Compare Here]
 
−
|-
 
−
|<center>9/25/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Division 10]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Division 10 - Mix Designs]</center>||Created entire New Division of Construction Manual for Division 10 - Mix Designs with links to Standard Specifications for 1001 - Concrete Production Equipment and Facilities, 1002 - Contractor Quality Control for Concrete, 1003 - Quality Assurance (Acceptance) for Concrete, 1004 - Portland Cement Concrete Mixtures, 1005 - Mortar and Grout Mixtures, and 1006 - Patching, Repair, & Overlay Mixtures.||[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Compare Here]
 
−
|-
 
−
|<center>9/25/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/900_-_Materials Division 9]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/900_-_Materials Division 9 - Materials]</center>||Created entire New Division of Construction Manual for Division 9 Materials with links to Standard Specifications for each of the 23 Sections.||[https://mdotwiki.state.mi.us/construction/index.php/900_-_Materials Compare Here]
 
−
|-
 
−
|<center>09/20/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]<center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/E-Signature#Transition_to_OneSpan E-Signature]</center>||Added clarification for Stamp approval of 0582B Moisture & Density Determination form.  Also created [[E-Signature#Tranistion_to_OneSpan_.E2.80.93_Frequently_Asked_Signature_Questions|Frequently Asked Signature Questions]] Section on page with signature clarification on 1302, 0501, 1100A, 1165 and 0582B forms||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=7626&oldid=7574 View Here]
 
−
|-
 
−
|<center>9/11/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]<center>||<center>[[105.10_Buy_America_Source_of_Steel_and_Iron|105.10 - Buy America Source of Steel and Iron]]</center>||Removal of CFS maintained Buy America certification process.||[https://mdotwiki.state.mi.us/construction/index.php?title=105.10_Buy_America_Source_of_Steel_and_Iron&type=revision&diff=7496&oldid=7012 Compare Here]
 
−
|-
 
−
|<center>9/7/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_5 Division 5]</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501 - Plant Produced Hot Mix Asphalt]]</center>||Updated contents of entire section 501 with pictures, video, and re-format to new Construction Manual style.||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&type=revision&diff=7488&oldid=6529 Compare Here]
 
−
|-
 
−
|<center>9/5/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[810_-_Permanent_Traffic_Signs_and_Supports|810 - Permanent Traffic Signs and Supports]]</center>||Updated contents of entire section 810 with pictures, video, and re-format to new Construction Manual style.||[https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanent_Traffic_Signs_and_Supports&type=revision&diff=7449&oldid=6245 Compare Here]
 
−
|-
 
−
|<center>8/30/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[820_-_Traffic_Signals|820 - Traffic Signals]]</center>||Clarification on payment for signal work.||[https://mdotwiki.state.mi.us/construction/index.php?title=820_-_Traffic_Signals&type=revision&diff=7460&oldid=6807 Compare Here]
 
−
|-
 
−
|<center>8/9/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Construction_Progress_Pay_Estimate_Approval_Process|109.07 - Construction Progress Pay Estimate Approval Process]]</center>||Updated contents of entire section 109.07 to reflect removal of digital signature requirements on Pay Estimates and add examples of PDF approval stamps||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=7257&oldid=7211 Compare Here]
 
−
|-
 
−
|<center>7/18/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Structural_Fabrication_Quality_Manual|105 - Structural Fabrication Quality Manual]]</center>||Updated content on Structural Fabrication Quality Manual for 2023 version 3 release.||[https://mdotwiki.state.mi.us/construction/index.php?title=Structural_Fabrication_Quality_Manual&type=revision&diff=7218&oldid=6595 Compare Here]
 
−
|-
 
−
|<center>07/13/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance|102.19 - Evaluation of Contractor Performance and Contract Non-Compliance]]</center>||New Section added for Evaluation of Contractor Performance and Contract Non-Compliance||[https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance Compare Here]
 
−
|-
 
−
|<center>07/13/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[102.01_Prequalification_of_Bidders|102.01 - Prequalification of Bidders]]</center>||Removal of Contractor Performance Evaluation (CPE) process and replacement with [https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance 1165 Notice of Non-Compliance Process] for trunkline projects.||[https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance Compare Here]
 
−
|-
 
−
|<center>06/06/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions|103.02 - Contract Revisions]]</center>||Updated guidance for electronic stamp approvals, AASHTOware software, Supporting Documentation for Extra work, & updated flow chart.  Also the threshold for Original Pay Item increase or decrease changed from $25k to $50k||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=7339&oldid=6861 Compare Here]
 
−
|-
 
−
|<center>05/24/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Prevailing_Wage|Prevailing Wage]]</center>||Updated Jobsite Posters||[https://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage View Here]
 
−
|-
 
−
|<center>05/18/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[107.06_Furnishing_Right-of-Way|107.06 - Furnishing Right-of-Way]]</center>||New Content added for Contractor Requests to break Limited Access Right-of-Way (LAROW) on Interstates||[https://mdotwiki.state.mi.us/construction/index.php?title=107.06_Furnishing_Right-of-Way&type=revision&diff=7045&oldid=4510 Compare Here]
 
−
|-
 
−
|<center>05/17/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[204_-_Removing_Miscellaneous_Structures_and_Materials#Vertical_Exploratory_Investigation_for_Relocation|204 - Removing Miscellaneous Structures and Materials]]</center>||Updated language for Vertical Exploratory Investigation for Relocation section||[https://mdotwiki.state.mi.us/construction/index.php?title=204_-_Removing_Miscellaneous_Structures_and_Materials&type=revision&diff=7032&oldid=6942 Compare Here]
 
−
|-
 
−
|<center>04/18/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208 - Soil Erosion and Sedimentation Control (NPDES)]]</center>||Added link to MDOT SESC Pocket Guide||[https://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&type=revision&diff=7008&oldid=6945 Compare Here]
 
−
|-
 
−
|<center>04/18/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[FieldManager]]</center>||Updated IDR requirements to replace digital signature with PDF stamp||[https://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&type=revision&diff=6999&oldid=6952 Compare Here]
 
−
|-
 
−
|<center>04/14/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#MDOT_Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Certified Engineer Process||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&type=revision&diff=6976&oldid=6969 Compare Here]
 
−
|-
 
−
|<center>03/20/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[E-Signature]]</center>||Updated MDOT Digital Signatures Guidance for One-Span||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=6909&oldid=6908 View Here]
 
−
|-
 
−
|<center>03/20/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Preconstruction_Meeting|Preconstruction Meeting]]</center>||Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2023||[https://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting View Here]
 
−
|-
 
−
|<center>03/08/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[108.09_Request_for_Time_Extensions_on_Work_Day,_Calendar_Day,_and_Calendar_Date_Contracts|108.09 - Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts]]</center>||Updated content for Extension of Time for Work Day, Calendar Day and Calendar Date Contracts and moved content from 108.07 to 108.09.||[https://mdotwiki.state.mi.us/construction/index.php?title=108.07_Extension_of_Time_on_Work_Day_Contracts&type=revision&diff=6865&oldid=6510 Compare Here]
 
−
|-
 
−
|<center>10/17/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use|Construction Field Services Indirect Testing Charges]]</center>||Updated content with FY2023 Program Numbers||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use View Here]
 
−
|-
 
−
|<center>10/11/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Construction_Value_Engineering_Change_Proposal_(VECP)|104 - Construction Value Engineering Change Proposal (VECP)]]</center>||Updated content for Construction Value Engineering Change Proposal (VECP).||[https://mdotwiki.state.mi.us/construction/index.php?title=Construction_Value_Engineering_Change_Proposal_%28VECP%29&type=revision&diff=6808&oldid=6761 Compare Here]
 
−
|-
 
−
|<center>10/11/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[820_-_Traffic_Signals|820 - Traffic Signals]]</center>||Added new Acceptance of Traffic Signal Work content, including pay item list and form.||[https://mdotwiki.state.mi.us/construction/index.php/820_-_Traffic_Signals#Acceptance_of_Traffice_Signal_Work View Here]
 
−
|-
 
−
|<center>9/19/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[FHWA’s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan)|FHWA Risk-Based Project Involvement]]</center>||Updated content to remove references to FHWA Projects of Division Interest (PoDI) and replaced with FHWA Risk-Based Project Involvement (RBPI).  References now link to the FHWA Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) page which contains instructions on how to locate each project's S&O Plan in ProjectWise to determine FHWA involvement.
 
−
||[https://mdotwiki.state.mi.us/construction/index.php/FHWA%E2%80%99s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan) View Here]
 
−
|-
 
−
|<center>7/21/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General|104.10 - Contractor Claim for Extra Compensation or Time Extension]]</center>||Updated Construction Claims Procedure document with July 2022 version.||[https://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General View Here]
 
−
|-
 
−
|<center>6/21/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[811_-_Permanent_Pavement_Markings#Temporary_Special_Markings_for_Cold_Weather|811 - Temporary Special Markings for Cold Weather]]</center>||Updated temporary special markings price negotiation costs||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6685&oldid=6666 Compare Here]
 
−
|-
 
−
|<center>5/18/2022</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Main_Page AASHTOWare Project Construction & Materials Software Manual (Wiki)]</center>||Added the AASHTOWare Project Construction & Materials Software Manual (Wiki) to the left sidebar of the Construction Manual Wiki||[https://mdotwiki.state.mi.us/aashtoware/index.php/Main_Page View Here]
 
−
|-
 
−
|<center>5/5/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[811_-_Permanent_Pavement_Markings#Durable_Pavement_Markings|811 - Permanent Pavement Markings]]</center>||Updated Durable Pavement Markings and Uniform Price Adjustment, Regular Dry Paint, and Low Temperature Waterborne Paint sections||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6666&oldid=6567 Compare Here]
 
−
|-
 
−
|<center>4/19/2022</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/images_construction/5/56/Documentation_Guide_2022_Final_04062022.pdf Documentation Guide 2022]</center>||Updated Documentation Guide 2022||[https://mdotwiki.state.mi.us/images_construction/5/56/Documentation_Guide_2022_Final_04062022.pdf View Here]
 
−
|-
 
−
|<center>3/16/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Holiday_Traffic_Safety_Provisions|Holiday Traffic Safety Provisions]]</center>||Updated table to project Holiday Traffic Safety Provisions and Closures dates to 2030||[https://mdotwiki.state.mi.us/construction/index.php/Holiday_Traffic_Safety_Provisions View Here]
 
−
|-
 
−
|<center>1/4/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Acceptance_of_Work|109.07 - Final Inspection, Acceptance, and Final Payment]]</center>||Updated contents of entire section 109.07 Final Inspection, Acceptance, and Final Payment||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6483&oldid=6380 Compare Here]
 
−
|-
 
−
|<center>12/21/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09 - Archeological and Historical Findings]]</center>||Updated contents of entire section 107.09 Archeological and Historical Findings||[https://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&type=revision&diff=6466&oldid=5618 Compare Here]
 
−
|-
 
−
|<center>11/23/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan|208 - Soil Erosion and Sedimentation Control (NPDES)]]</center>||Created new subsection "Sediment Discharge into Waters of the State of Michigan"||[https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan View Here]
 
−
|-
 
−
|<center>11/17/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions#Design_Errors|103.02 - Contract Revisions]]</center>||Added new section Design Errors and updated information in the Premium Costs for Design Errors and Field Issues||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6440&oldid=6436 Compare Here]
 
−
|-
 
−
|<center>10/27/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions#top|103.02 - Contract Revisions]]</center>||Updated content in Section 103.02 Construction Contract Modification Process Overview||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6436&oldid=6403 Compare Here]
 
−
|-
 
−
|<center>10/18/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||Updated the Indirect Testing coding for FY 2022||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges View Here]
 
−
|-
 
−
|<center>10/7/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions#Construction_Contract_and_Construction_Engineering_Phase_Funding_Revisions|103.02 - Contract Revisions]]</center>||Added new section for Construction Contract and Construction Engineering Phase Funding Revisions as well as LAP Project Considerations update regarding the same||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6403&oldid=6351 Compare Here]
 
−
|-
 
−
|<center>9/28/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[108.01_Subcontracting_of_Contract_Work|108.01 - Subcontracting of Contract Work]]</center>||Updated information in section 108.01 Subcontracting of Contract Work||[https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&type=revision&diff=6385&oldid=6292 Compare Here]
 
−
|-
 
−
|<center>9/16/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Preconstruction_Meeting|102 - Preconstruction Meeting]]</center>||Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2021||[https://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting View Here]
 
−
|-
 
−
|<center>9/8/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[108.05_Progress_Schedule|108.05 - Progress Schedule]]</center>||Replaced all information for 108.05 Progress Schedule section ||[https://mdotwiki.state.mi.us/construction/index.php?title=108.05_Progress_Schedule&type=revision&diff=6369&oldid=5269 Compare Here]
 
−
|-
 
−
|<center>9/2/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07 - Final Inspection, Acceptance, and Final Payment]]</center>|| Updated Final Estimates information and replaced Figure 109-1 ||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6367&oldid=6151 Compare Here]
 
−
|-
 
−
|<center>9/1/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Removed table and updated Standard Naming Convention Alpha/Numeric lists||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&type=revision&diff=6359&oldid=6293 Compare Here]
 
−
|-
 
−
|<center>8/25/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions#Requirements_for_FHWA_Review_on_Projects_of_Division_Interest_.28PoDI.29|103.02 - Contract Revisions]]</center>||Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity.||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6351&oldid=6350 Compare Here]
 
−
|-
 
−
|<center>8/3/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Structural_Fabrication_Quality_Manual|105 - Structural Fabrication Quality Manual]]</center>||Updated content on Structural Fabrication Quality Manual page.||[https://mdotwiki.state.mi.us/construction/index.php?title=Structural_Fabrication_Quality_Manual&type=revision&diff=6347&oldid=6006 Compare Here]
 
−
|-
 
−
|<center>6/16/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02 - Progress Clause]]</center>||Updated Boilerplate Progress Clause Template document link (revision June 2021)||[https://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause View Here]
 
−
|-
 
−
|<center>6/16/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|105 - Materials Quality Assurance Procedures Manual]]</center>||Added 2021 MQAP content||[https://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual#2021_Summary_of_Revisions_to_the_MQAP View Here]
 
−
|-
 
−
|<center>6/8/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[107.01_Laws_to_be_Observed|107.01 - Laws to be Observed]]</center>||Created Section 107.01 Laws to be Observed||[https://mdotwiki.state.mi.us/construction/index.php/107.01_Laws_to_be_Observed View Here]
 
−
|-
 
−
|<center>5/11/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Office_Technician_Process#Office_Technician_Certification_Requirements|Certified Office Technician Process]]</center>||Clarification of Prerequisites for Office Tech Certification||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Office_Technician_Process&type=revision&diff=6216&oldid=6167 Compare Here]
 
−
|-
 
−
|<center>4/19/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07 - Final Inspection, Acceptance, and Final Payment]]</center>||Updated Final Estimates information||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6151&oldid=5946 Compare Here]
 
−
|-
 
−
|<center>3/15/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Digital_Calculations_for_Payment|104 - Digital Calculations for Payment]]</center>||Created new Digital Calculations for Payment section under Division 1, Section 104||[https://mdotwiki.state.mi.us/construction/index.php/Digital_Calculations_for_Payment View Here]
 
−
|-
 
−
|<center>2/9/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[712_-_Bridge_Rehabilitation,_Concrete#Hydrodemolition|712 - Bridge Rehabilitation, Concrete]]</center>||Added the Site Activation/Deactivation information||[http://mdotwiki.state.mi.us/construction/index.php?title=712_-_Bridge_Rehabilitation%2C_Concrete&diff=6115&oldid=5606 Compare Here]
 
−
|-
 
−
|<center>2/9/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Other_Documentation|715 - Cleaning and Coating Existing Structural Steel]]</center>||Updated information under Item #6, Site Activation/Deactivation||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=6118&oldid=5598 Compare Here]
 
 
|-
 
|-
 
|}
 
|}

Revision as of 17:54, 4 September 2025

www.michigan.gov/mdot


CONSTRUCTION MANUAL


Logo.jpg


Bureau of Field Services
Construction Field Services Division

Box culvert construction on M-10 in Clare County.

MDOT Mission Statement

Providing the highest quality integrated transportation services for economic benefit and improved quality of life.


Current News

AASHTOWare Project Construction & Materials Software Manual

Support for AASHTOware Construction and Materials can be found at the new AASHTOWare Project Construction & Materials Software Manual

For any additional support please contact the AASHTOWare Helpdesk email [email protected] or the FieldManager Helpdesk email [email protected].

MI MDOT Software Support.png

[top of page]


Recent Major Changes

The table below is a list of Major changes.

Updated Division Section Summary What Changed
09/03/2025
Division 1
107.15 Compliance with Laws; Environmental Protection
Updated guidance for field staff on signing manifests or other documents related to hazardous or non-hazardous materials. Compare Here
08/26/2025
Division 1 Supplemental
Construction Field Services Indirect Testing Charges
Updated the Indirect Testing coding for FY26 Compare Here
08/26/2025
Division 2
206 - Excavation and Backfill for Structures
Major revision to entire section content on 206 - Excavation and Backfill for Structures. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/26/2025
Division 2
207 - Obliterating Roadway
Major revision to entire section content on 207 - Obliterating Roadway. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/26/2025
Division 2
208 - Soil Erosion and Sedimentation Control (NPDES)
Major revision to entire section content on 208 - Soil Erosion and Sedimentation Control (NPDES). New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/26/2025
Division 2
209 - Project Cleanup
Major revision to entire section content on 209 - Project Cleanup. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/21/2025
Division 4
401 - Culverts
Major revision to entire section content on 401 - Culverts. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/21/2025
Division 4
402 - Storm Sewers
Major revision to entire section content on 402 - Storm Sewers. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/21/2025
Division 4
403 - Drainage Structures
Major revision to entire section content on 403 - Drainage Structures. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/19/2025
Division 2
204 - Removing Miscellaneous Structures and Materials
Major revision to entire section content on 204 - Removing Miscellaneous Structures and Materials. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/19/2025
Division 2
205 - Roadway Earthwork
Major revision to entire section content on 205 - Roadway Earthwork. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
07/31/2025
Division 2
201 - Clearing
Major revision to entire section content on 201 - Clearing. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
07/31/2025
Division 2
202 - Removing Trees, Stumps, and Corduroy
Major revision to entire section content on 202 - Removing Trees, Stumps, and Corduroy. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
07/31/2025
Division 2
203 - Removing Drainage Structures, Culverts, and Sewers
Major revision to entire section content on 203 - Removing Drainage Structures, Culverts, and Sewers. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
07/29/2025
Sidebar
Documentation Guide 2025
Updated Documentation Guide 2025 View Here
07/28/2025
Division 1 Supplemental
MDOT Standard Naming Convention
Significant update of MDOT Standard Naming Conventions. DWR Calculation attachments relocated to 208 folder. Compare Changes
07/28/2025
Division 1 Supplemental
Inspector’s Daily Work Report (DWR)
Updated Inspectors Daily Work Report (DWR) page with new requirements. Compare Changes
04/28/2025
Division 1 Supplemental
Preconstruction Meeting
Updated Trunk Line Boilerplate Preconstruction Meeting Minutes - 04-28-2025 View Here
03/30/2025
Division 5
501 - Plant Produced Hot Mix Asphalt
Updated section 501 to include the MDOT HMA Paving Operations Training Videos. View Here
03/04/2025
Division 1
103.02 - Contract Revisions
Updated guidance for Construction Phase Funding Revisions Compare Here
03/03/2025
Division 1
Civil Rights Programs
former Disadvantaged Business Enterprises (DBE) page renamed to Civil Rights Programs View Here
01/15/2025
Division 1
Inspector’s Daily Work Report (DWR)
Updated Inspectors Daily Work Report (DWR) page for AASHTOWare with new content and sample DWR. View Here
01/14/2025
Division 1
109.07 - Final Inspection, Acceptance, and Final Payment
Updated contents of entire section 109.07 to reflect process on AASHTOWare contracts. Compare Here
01/14/2025
Division 1
109.04 Progress and Partial Payments
Updated contents of entire section 109.04 to reflect process on AASHTOWare contracts. Compare Here
12/09/2024
Division 8
810 - Permanent Traffic Signs and Supports
Updated directions for placement of installation date sticker on signs. Compare Here
11/06/2024
Construction Manual
Construction Manual
Updates to entire Contruction Manual to change terminology from IDR to DWR and from Contract Modification to Change Order to meet AASHTOWare terminology. Table of Contents
10/21/2024
Division 1
Section 110 - Mobilization
Deleted page Section 150 - Mobilization, replaced with Section 110 - Mobilization per new spec book View Here
10/21/2024
Division 1 Supplemental
Construction Field Services Indirect Testing Charges
Updated the Indirect Testing coding for FY25 View Here
10/21/2024
Division 8
811 Permanent Pavement Markings
Updated Permanent Pavement Markings payment table to include 2024 price adjustments View Here
10/14/2024
Division 1 Supplemental
Preconstruction Meeting
Updated Trunk Line Boilerplate Preconstruction Meeting Minutes - 10-14-2024 View Here
10/03/2024
Division 1
103 - Work Orders
Updated instructions for issuing and processing work orders including stamped authorizations. Compare Here
09/26/2024
Division 7
706 - Structural Concrete
Minor revisions to section 706 content on Structural Concrete. Compare Here
09/26/2024
Division 2
208 - Soil Erosion and Sedimentation Control (NPDES)
Added link to new MDOT SESC Pocket Guide View Here
09/05/2024
Division 7
707 - Structural Steel
Major revision to entire section content on Structural Steel. New content, additional pictures/figures, and re-format to new Construction Manual format. View Here
07/22/2024
Division 8
821 - Preservation of Land Monuments and Property Corners
New content added for previously empty section 821 - Preservation of Land Monuments and Property Corners. View Here
07/02/2024
Division 7
708 - Prestressed Concrete
Major revision to entire section content on Prestressed_Concrete. New content, additional pictures/figures, and re-format to new Construction Manual format. View Here

A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.

[top of page]


Recent Minor Changes

The table below is a list of Minor changes.

Updated Division Section Summary What Changed
08/25/2025
Division 1
103.02 - Contract Revisions
Updated guidance in Contract Revisions - Premium Costs for Design Errors and Field Issues to include a link to ACEC Dispute Resolution Process for design issues. Compare Here
05/20/2025
Division 8
821 - Preservation of Land Monuments and Property Corners
Minor update of example documents for monument corners tables 821 - Preservation of Land Monuments and Property Corners. View Here
04/29/2025
Division 8
820 Notification of Traffic Signal Work
Updated contact information for Traffic Signal work. View Here
03/20/2025
Division 1 Supplemental
Certified Engineer List
Updated Certified Engineer list to March 2025. View Here
02/06/2025
Division 7
715 - Cleaning and Coating Existing Structural Steel
Removed guidance which conflicted with the standard specs. Compare Here
02/04/2025
Division 1
Inspector’s Daily Work Report (DWR)
Updated Inspectors Daily Work Report (DWR) page to remove approval stamp which no longer applies. View Here
02/04/2025
Division 1 Supplemental
Certified Engineer List
Updated Certified Engineer list to February 2025. View Here
01/13/2025
Division 1 Supplemental
MDOT Standard Naming Convention
Addition of Form 1459 - Structure Installation Inspection Request form to Standard Naming Convention. (Reminder you can sort list by recent changes column) Compare Here
11/13/2024
Division 2
205 - Disposing of Surplus and Unsuitable Material
Minor update to Region notification prior to off-site disposal of soils Compare Here
10/01/2024
Division 1 Supplemental
Certified Engineer List
Updated Certified Engineer list to October 2024. View Here
09/30/2024
Division 8
821 - Preservation of Land Monuments and Property Corners
Minor update for contacts on Local Agency Projects 821 - Preservation of Land Monuments and Property Corners. Compare Here
08/19/2024
Division 8
821 - Preservation of Land Monuments and Property Corners
Updated PLSS Natural Witness Example 821 - Preservation of Land Monuments and Property Corners. Compare Here
08/15/2024
Division 1 Supplemental
Dispute Review Board
Updated links and added clarification langauge on process to add or remove DRB from projects. Compare Here
07/01/2024
Division 8
826 – Intelligent Transportation Systems
Updated Section 826 with minor edits and added to left side menu. Compare Here
07/01/2024
Division 8
825 - Sanitary Sewer Systems
Updated Section 825 with minor edits and added to left side menu. Compare Here

[top of page]


Sign Up for Updates

To learn about how to sign up to receive updates related to MDOT's Construction Manual Wiki along with other State of Michigan content check out the video provided below.

Click here to learn how to sign up for MDOT notifications

ListServ Red Envelope2.PNG

Preamble

This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:

  1. Hold paramount the safety, health, and welfare of the public.
  2. Perform Services only in areas of their competence.
  3. Issue public statement only in an objective and truthful manner.
  4. Act for each employer or client as faithful agents or trustees.
  5. Avoid deceptive acts.
  6. Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.


This manual has been formatted and organized to follow the MDOT Standard Specifications outline with divisions and sections set up to facilitate easy cross referencing.

Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the MDOT Construction Manual Content Revision Procedures page.


[top of page]