Difference between revisions of "Main Page"

From MediaWiki
Jump to navigation Jump to search
(→‎Recent Major Changes: Added 105's Removal of CFS maintained Buy America Certification Process)
 
(167 intermediate revisions by 2 users not shown)
Line 33: Line 33:
  
 
==[[#Recent Major Changes|Recent Major Changes]]==
 
==[[#Recent Major Changes|Recent Major Changes]]==
The table below is a list of Major changes.   
+
The table below is a list of Major changes to the Construction Manual in the past 12 months.   
<div style="overflow:auto; height:200px; width:700px">
+
<div style="overflow:auto; height:350px; width:850px">
{| class="wikitable" style="background:orange; color:black"
+
{| class="wikitable sortable" style="background:orange; color:black"
 
!Updated!! Division !! Section !! Summary !! What Changed
 
!Updated!! Division !! Section !! Summary !! What Changed
 
|-
 
|-
|<center>9/11/2023</center>||<center>105</center>||<center>[[105.10_Buy_America_Source_of_Steel_and_Iron|105.10 Buy America Source of Steel and Iron]]</center>||Removal of CFS maintained Buy America certification process.||[https://mdotwiki.state.mi.us/construction/index.php?title=105.10_Buy_America_Source_of_Steel_and_Iron&type=revision&diff=7496&oldid=7012 Compare Here]
+
|<center>09/03/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[107.15_Compliance_with_Laws;_Environmental_Protection|107.15 Compliance with Laws; Environmental Protection]]</center>||Updated guidance for field staff on signing manifests or other documents related to hazardous or non-hazardous materials. ||[https://mdotwiki.state.mi.us/construction/index.php?title=107.15_Compliance_with_Laws%3B_Environmental_Protection&type=revision&diff=9421&oldid=6508 Compare Here]
 
|-
 
|-
|<center>9/7/2023</center>||<center>501</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501 - Plant Produced Hot Mix Asphalt]]</center>||Updated contents of entire section 501 with pictures, video, and re-format to new CM style.||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&type=revision&diff=7488&oldid=6529 Compare Here]
+
|<center>08/26/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||Updated the Indirect Testing coding for FY26||[https://mdotwiki.state.mi.us/construction/index.php?title=Construction_Field_Services_Indirect_Testing_Charges&type=revision&diff=9407&oldid=8707 Compare Here]
 
|-
 
|-
|<center>9/5/2023</center>||<center>810</center>||<center>[[810_-_Permanent_Traffic_Signs_and_Supports|810 - Permanent Traffic Signs and Supports]]</center>||Updated contents of entire section 810 with pictures, video, and re-format to new CM style.||[https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanent_Traffic_Signs_and_Supports&type=revision&diff=7449&oldid=6245 Compare Here]
+
|<center>08/26/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[206_-_Excavation_and_Backfill_for_Structures|206 - Excavation and Backfill for Structures]]</center>|||Major revision to entire section content on [[206_-_Excavation_and_Backfill_for_Structures|206 - Excavation and Backfill for Structures]].  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=206_-_Excavation_and_Backfill_for_Structures&type=revision&diff=9400&oldid=7525 Compare Here]
 
|-
 
|-
|<center>8/30/2023</center>||<center>820</center>||<center>[[820_-_Traffic_Signals|820 - Traffic Signals]]</center>||Clarification on payment for signal work.||[https://mdotwiki.state.mi.us/construction/index.php?title=820_-_Traffic_Signals&type=revision&diff=7460&oldid=6807 Compare Here]
+
|<center>08/26/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[207_-_Obliterating_Roadway|207 - Obliterating Roadway]]</center>|||Major revision to entire section content on [[207_-_Obliterating_Roadway|207 - Obliterating Roadway]].  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=207_-_Obliterating_Roadway&type=revision&diff=9381&oldid=7521 Compare Here]
 
|-
 
|-
|<center>8/9/2023</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Construction_Progress_Pay_Estimate_Approval_Process|109.07]]</center>||Updated contents of entire section 109.07 to reflect removal of digital signature requirements on Pay Estimates and add examples of PDF approval stamps||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=7257&oldid=7211 Compare Here]
+
|<center>08/26/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208 - Soil Erosion and Sedimentation Control (NPDES)]]</center>|||Major revision to entire section content on [[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208 - Soil Erosion and Sedimentation Control (NPDES)]]. New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&type=revision&diff=9401&oldid=7988 Compare Here]
 
|-
 
|-
|<center>7/18/2023</center>||<center>1</center>||<center>[[Structural_Fabrication_Quality_Manual|105 Structural Fabrication Quality Manual]]</center>||Updated content on Structural Fabrication Quality Manual for 2023 version 3 release.||[https://mdotwiki.state.mi.us/construction/index.php?title=Structural_Fabrication_Quality_Manual&type=revision&diff=7218&oldid=6595 Compare Here]
+
|<center>08/26/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[209_-_Project_Cleanup|209 - Project Cleanup]]</center>|||Major revision to entire section content on [[209_-_Project_Cleanup|209 - Project Cleanup]].  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=209_-_Project_Cleanup&type=revision&diff=9399&oldid=6520 Compare Here]
 
|-
 
|-
|<center>07/13/2023</center>||<center>1</center>||<center>[[102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance|102.19]]</center>||New Section added for Evaluation of Contractor Performance and Contract Non-Compliance||[https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance Compare Here]
+
|<center>08/21/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_4 Division 4]</center>||<center>[[401_-_Culverts|401 - Culverts]]</center>|||Major revision to entire section content on [[401_-_Culverts|401 - Culverts]].  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=401_-_Culverts&type=revision&diff=9270&oldid=7706 Compare Here]
 
|-
 
|-
|<center>07/13/2023</center>||<center>1</center>||<center>[[102.01_Prequalification_of_Bidders|102.01]]</center>||Removal of Contractor Performance Evaluation (CPE) process and replacement with [https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance 1165 Notice of Non-Compliance Process] for trunkline projects.||[https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance Compare Here]
+
|<center>08/21/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_4 Division 4]</center>||<center>[[402_-_Storm_Sewers|402 - Storm Sewers]]</center>|||Major revision to entire section content on [[402_-_Storm_Sewers|402 - Storm Sewers]].  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=402_-_Storm_Sewers&type=revision&diff=9269&oldid=6522 Compare Here]
 
|-
 
|-
|<center>06/06/2023</center>||<center>1</center>||<center>[[103.02_Contract_Revisions|103.02 Contract Revisions]]</center>||Updated guidance for electronic stamp approvals, AASHTOware software, Supporting Documentation for Extra work, & updated flow chart.  Also the threshold for Original Pay Item increase or decrease changed from $25k to $50k||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=7339&oldid=6861 Compare Here]
+
|<center>08/21/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_4 Division 4]</center>||<center>[[403_-_Drainage_Structures|403 - Drainage Structures]]</center>|||Major revision to entire section content on [[403_-_Drainage_Structures|403 - Drainage Structures]].  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=403_-_Drainage_Structures&type=revision&diff=9271&oldid=6523 Compare Here]
|-
 
|<center>05/24/2023</center>||<center>1</center>||<center>[[Prevailing_Wage|Prevailing Wage]]</center>||Updated Jobsite Posters||[https://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage View Here]
 
 
|-
 
|-
|<center>05/18/2023</center>||<center>1</center>||<center>[[107.06_Furnishing_Right-of-Way|107.06]]</center>||New Content added for Contractor Requests to break Limited Access Right-of-Way (LAROW) on Interstates||[https://mdotwiki.state.mi.us/construction/index.php?title=107.06_Furnishing_Right-of-Way&type=revision&diff=7045&oldid=4510 Compare Here]
+
|<center>08/19/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[204_-_Removing_Miscellaneous_Structures_and_Materials|204 - Removing Miscellaneous Structures and Materials]]</center>|||Major revision to entire section content on [[204_-_Removing_Miscellaneous_Structures_and_Materials|204 - Removing Miscellaneous Structures and Materials]].  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=204_-_Removing_Miscellaneous_Structures_and_Materials&type=revision&diff=9273&oldid=8734 Compare Here]
 
|-
 
|-
|<center>05/17/2023</center>||<center>2</center>||<center>[[204_-_Removing_Miscellaneous_Structures_and_Materials#Vertical_Exploratory_Investigation_for_Relocation|204]]</center>||Updated language for Vertical Exploratory Investigation for Relocation section||[https://mdotwiki.state.mi.us/construction/index.php?title=204_-_Removing_Miscellaneous_Structures_and_Materials&type=revision&diff=7032&oldid=6942 Compare Here]
+
|<center>08/19/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[205_-_Roadway_Earthwork|205 - Roadway Earthwork]]</center>|||Major revision to entire section content on [[205_-_Roadway_Earthwork|205 - Roadway Earthwork]].  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=205_-_Roadway_Earthwork&type=revision&diff=9274&oldid=8830 Compare Here]
 
|-
 
|-
 
+
|<center>07/31/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[201_-_Clearing|201 - Clearing]]</center>|||Major revision to entire section content on [[201_-_Clearing|201 - Clearing]].  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=201_-_Clearing&type=revision&diff=9096&oldid=8741 Compare Here]
|<center>04/18/2023</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Added link to MDOT SESC Pocket Guide||[https://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&type=revision&diff=7008&oldid=6945 Compare Here]
 
 
|-
 
|-
|<center>04/18/2023</center>||<center>1 Supplemental</center>||<center>[[FieldManager]]</center>||Updated IDR requirements to replace digital signature with PDF stamp||[https://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&type=revision&diff=6999&oldid=6952 Compare Here]
+
|<center>07/31/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[202_-_Removing_Trees,_Stumps,_and_Corduroy|202 - Removing Trees, Stumps, and Corduroy]]</center>|||Major revision to entire section content on [[202_-_Removing_Trees,_Stumps,_and_Corduroy|202 - Removing Trees, Stumps, and Corduroy]].  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=202_-_Removing_Trees%2C_Stumps%2C_and_Corduroy&type=revision&diff=9097&oldid=8722 Compare Here]
 
|-
 
|-
|<center>04/14/2023</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#MDOT_Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Certified Engineer Process||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&type=revision&diff=6976&oldid=6969 Compare Here]
+
|<center>07/31/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[203_-_Removing_Drainage_Structures,_Culverts,_and_Sewers|203 - Removing Drainage Structures, Culverts, and Sewers]]</center>|||Major revision to entire section content on [[203_-_Removing_Drainage_Structures,_Culverts,_and_Sewers|203 - Removing Drainage Structures, Culverts, and Sewers]].  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=203_-_Removing_Drainage_Structures%2C_Culverts%2C_and_Sewers&type=revision&diff=9098&oldid=7520 Compare Here]
 
|-
 
|-
|<center>03/20/2023</center>||<center>1 Supplemental</center>||<center>[[E-Signature]]</center>||Updated MDOT Digital Signatures Guidance for One-Span||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=6909&oldid=6908 View Here]
+
|<center>07/29/2025</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/images_construction/5/52/Documentation_Guide_2025-03-21-R.pdf Documentation Guide 2025]</center>||Updated Documentation Guide 2025||[https://mdotwiki.state.mi.us/images_construction/5/52/Documentation_Guide_2025-03-21-R.pdf View Here]
 
|-
 
|-
|<center>03/20/2023</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2023||[https://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting View Here]
+
|<center>07/28/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=Standard_Naming_Convention#MDOT_Standard_Naming_Convention MDOT Standard Naming Convention]</center>||Significant update of MDOT Standard Naming Conventions.  DWR Calculation attachments relocated to 208 folder.  ||[https://mdotwiki.state.mi.us/construction/index.php?title=Standard_Naming_Convention&type=revision&diff=9052&oldid=9046 Compare Changes]
 
|-
 
|-
|<center>03/08/2023</center>||<center>1</center>||<center>[[108.09_Request_for_Time_Extensions_on_Work_Day,_Calendar_Day,_and_Calendar_Date_Contracts|108.09]]</center>||Updated content for Extension of Time for Work Day, Calendar Day and Calendar Date Contracts and moved content from 108.07 to 108.09.||[https://mdotwiki.state.mi.us/construction/index.php?title=108.07_Extension_of_Time_on_Work_Day_Contracts&type=revision&diff=6865&oldid=6510 Compare Here]
+
|<center>07/28/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1 Supplemental]</center>||<center>[[Inspector’s_Daily_Work_Report_(DWR)|Inspector’s Daily Work Report (DWR)]]</center>||Updated Inspectors Daily Work Report (DWR) page with new requirements. ||[https://mdotwiki.state.mi.us/construction/index.php?title=Inspector%E2%80%99s_Daily_Work_Report_%28DWR%29&type=revision&diff=9050&oldid=8913 Compare Changes]
 
|-
 
|-
|<center>10/17/2022</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use|Construction Field Services Indirect Testing Charges]]</center>||Updated content with FY2023 Program Numbers||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use View Here]
+
|<center>04/28/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Preconstruction_Meeting|Preconstruction Meeting]]</center>||Updated Trunk Line Boilerplate Preconstruction Meeting Minutes - 04-28-2025||[https://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting#Trunkline_Boilerplate_Preconstruction_Meeting_Minutes View Here]
 
|-
 
|-
|<center>10/11/2022</center>||<center>1</center>||<center>[[Construction_Value_Engineering_Change_Proposal_(VECP)|104]]</center>||Updated content for Construction Value Engineering Change Proposal (VECP).||[https://mdotwiki.state.mi.us/construction/index.php?title=Construction_Value_Engineering_Change_Proposal_%28VECP%29&type=revision&diff=6808&oldid=6761 Compare Here]
+
|<center>03/30/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_5 Division 5]</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501 - Plant Produced Hot Mix Asphalt]]</center>||Updated section 501 to include the [[501_-_Plant_Produced_Hot_Mix_Asphalt#HMA_Paving_Operations_Videos|MDOT HMA Paving Operations Training Videos]].||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt#HMA_Paving_Operations_Videos View Here]
 
|-
 
|-
|<center>10/11/2022</center>||<center>8</center>||<center>[[820_-_Traffic_Signals|820]]</center>||Added new Acceptance of Traffic Signal Work content, including pay item list and form.||[https://mdotwiki.state.mi.us/construction/index.php/820_-_Traffic_Signals#Acceptance_of_Traffice_Signal_Work View Here]
+
|<center>03/04/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions|103.02 - Contract Revisions]]</center>||Updated guidance for Construction Phase Funding Revisions ||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=8934&oldid=8823 Compare Here]
|-
+
|-
|<center>9/19/2022</center>||<center>1 Supplemental</center>||<center>[[FHWA’s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan)|FHWA Risk-Based Project Involvement]]</center>||Updated content to remove references to FHWA Projects of Division Interest (PoDI) and replaced with FHWA Risk-Based Project Involvement (RBPI).  References now link to the FHWA Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) page which contains instructions on how to locate each project's S&O Plan in ProjectWise to determine FHWA involvement.
+
|<center>03/03/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=Civil_Rights_Programs Civil Rights Programs]</center>||former ''Disadvantaged Business Enterprises (DBE)'' page renamed to [[Civil_Rights_Programs|Civil Rights Programs]]||[https://mdotwiki.state.mi.us/construction/index.php?title=Civil_Rights_Programs View Here]
||[https://mdotwiki.state.mi.us/construction/index.php/FHWA%E2%80%99s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan) View Here]
 
 
|-
 
|-
|<center>7/21/2022</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General|104.10]]</center>||Updated Construction Claims Procedure document with July 2022 version.||[https://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General View Here]
+
|<center>01/15/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Inspector’s_Daily_Work_Report_(DWR)|Inspector’s Daily Work Report (DWR)]]</center>||Updated Inspectors Daily Work Report (DWR) page for AASHTOWare with new content and sample DWR. ||[https://mdotwiki.state.mi.us/construction/index.php?title=Inspector%E2%80%99s_Daily_Work_Report_(DWR) View Here]
 
|-
 
|-
|<center>6/21/2022</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Temporary_Special_Markings_for_Cold_Weather|811]]</center>||Updated temporary special markings price negotiation costs||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6685&oldid=6666 Compare Here]
+
|<center>01/14/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109.07 - Final Inspection, Acceptance, and Final Payment]]</center>||Updated contents of entire section 109.07 to reflect process on AASHTOWare contracts.||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=8861&oldid=8828 Compare Here]
 
|-
 
|-
|<center>5/18/2022</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Main_Page AASHTOWare Project Construction & Materials Software Manual (Wiki)]</center>||Added the AASHTOWare Project Construction & Materials Software Manual (Wiki) to the left sidebar of the Construction Manual Wiki||[https://mdotwiki.state.mi.us/aashtoware/index.php/Main_Page View Here]
+
|<center>01/14/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.04_Progress_and_Partial_Payments|109.04 Progress and Partial Payments]]</center>||Updated contents of entire section 109.04 to reflect process on AASHTOWare contracts.||[https://mdotwiki.state.mi.us/construction/index.php?title=109.04_Progress_and_Partial_Payments&type=revision&diff=8876&oldid=7159 Compare Here]
 
|-
 
|-
|<center>5/5/2022</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Durable_Pavement_Markings|811]]</center>||Updated Durable Pavement Markings and Uniform Price Adjustment, Regular Dry Paint, and Low Temperature Waterborne Paint sections||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6666&oldid=6567 Compare Here]
+
|<center>12/09/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[810_-_Permanent_Traffic_Signs_and_Supports|810 - Permanent Traffic Signs and Supports]]</center>||Updated directions for placement of installation date sticker on signs.||[https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanent_Traffic_Signs_and_Supports&type=revision&diff=8836&oldid=8237 Compare Here]
 
|-
 
|-
|<center>4/19/2022</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/images_construction/5/56/Documentation_Guide_2022_Final_04062022.pdf Documentation Guide 2022]</center>||Updated Documentation Guide 2022||[https://mdotwiki.state.mi.us/images_construction/5/56/Documentation_Guide_2022_Final_04062022.pdf View Here]
+
|<center>11/06/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=Category:Construction_Manual Construction Manual]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=Category:Construction_Manual Construction Manual]</center>||Updates to entire Contruction Manual to change terminology from IDR to DWR and from Contract Modification to Change Order to meet AASHTOWare terminology. ||[https://mdotwiki.state.mi.us/construction/index.php?title=Category:Construction_Manual Table of Contents]
 
|-
 
|-
|<center>3/16/2022</center>||<center>1</center>||<center>[[Holiday_Traffic_Safety_Provisions|Holiday Traffic Safety Provisions]]</center>||Updated table to project Holiday Traffic Safety Provisions and Closures dates to 2030||[https://mdotwiki.state.mi.us/construction/index.php/Holiday_Traffic_Safety_Provisions View Here]
+
|<center>10/21/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[110_Mobilization|Section 110 - Mobilization]]</center>||Deleted page Section 150 - Mobilization, replaced with [[110_Mobilization|Section 110 - Mobilization]] per new spec book||[https://mdotwiki.state.mi.us/construction/index.php?title=110_Mobilization View Here]
 
|-
 
|-
|<center>1/4/2022</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Acceptance_of_Work|109.07]]</center>||Updated contents of entire section 109.07 Final Inspection, Acceptance, and Final Payment||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6483&oldid=6380 Compare Here]
+
|<center>10/21/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||Updated the Indirect Testing coding for FY25||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges View Here]
 
|-
 
|-
|<center>12/21/2021</center>||<center>1</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09]]</center>||Updated contents of entire section 107.09 Archeological and Historical Findings||[https://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&type=revision&diff=6466&oldid=5618 Compare Here]
+
|<center>10/21/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[811_-_Permanent_Pavement_Markings#Uniform_Price_Adjustment.2C_Regular_Dry_Paint_and_Low_Temperature_Waterborne_Paint|811 Permanent Pavement Markings]]</center>||Updated Permanent Pavement Markings payment table to include 2024 price adjustments||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Here]
 
|-
 
|-
|<center>11/23/2021</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan|208]]</center>||Created new subsection "Sediment Discharge into Waters of the State of Michigan"||[https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan View Here]
+
|<center>10/14/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Preconstruction_Meeting|Preconstruction Meeting]]</center>||Updated Trunk Line Boilerplate Preconstruction Meeting Minutes - 10-14-2024||[https://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting#Trunkline_Boilerplate_Preconstruction_Meeting_Minutes View Here]
 
|-
 
|-
|<center>11/17/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Design_Errors|103.02]]</center>||Added new section Design Errors and updated information in the Premium Costs for Design Errors and Field Issues||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6440&oldid=6436 Compare Here]
+
|<center>10/03/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Work_Order|103 - Work Orders]]</center>||Updated instructions for issuing and processing work orders including stamped authorizations. ||[https://mdotwiki.state.mi.us/construction/index.php?title=Work_Order&type=revision&diff=8694&oldid=6597 Compare Here]
 
|-
 
|-
|<center>10/27/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#top|103.02]]</center>||Updated content in Section 103.02 Construction Contract Modification Process Overview||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6436&oldid=6403 Compare Here]
+
|<center>09/26/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[706_-_Structural_Concrete|706 - Structural Concrete]]</center>||Minor revisions to section 706 content on Structural Concrete.||[https://mdotwiki.state.mi.us/construction/index.php?title=706_-_Structural_Concrete&type=revision&diff=8684&oldid=8619 Compare Here]
 
|-
 
|-
|<center>10/18/2021</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||Updated the Indirect Testing coding for FY 2022||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges View Here]
+
|<center>09/26/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208 - Soil Erosion and Sedimentation Control (NPDES)]]</center>||Added link to new [https://www.michigan.gov/mdot/-/media/Project/Websites/MDOT/Programs/Highway-Programs/Environmental-Efforts/Stormwater-Management/Education/Construction-Site-Soil-Erosion-Pollution-Prevention-Pocket-Guide.pdf?rev=14bf25edefc640f0a631cdb8001b2603&hash=4100856D6E3088CC92BB13447B5BE08C MDOT SESC Pocket Guide]||[https://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Construction_Site_Soil_Erosion_.26_Pollution_Prevention_Pocket_Guide View Here]
 
|-
 
|-
|<center>10/7/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Construction_Contract_and_Construction_Engineering_Phase_Funding_Revisions|103.02]]</center>||Added new section for Construction Contract and Construction Engineering Phase Funding Revisions as well as LAP Project Considerations update regarding the same||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6403&oldid=6351 Compare Here]
+
|<center>09/05/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[707_-_Structural_Steel|707 - Structural Steel]]</center>||Major revision to entire section content on Structural Steel.  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=707_-_Structural_Steel View Here]
 
|-
 
|-
|<center>9/28/2021</center>||<center>1</center>||<center>[[108.01_Subcontracting_of_Contract_Work|108.01]]</center>||Updated information in section 108.01 Subcontracting of Contract Work||[https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&type=revision&diff=6385&oldid=6292 Compare Here]
+
|<center>07/22/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[821_-_Preservation_of_Land_Monuments_and_Property_Corners|821 - Preservation of Land Monuments and Property Corners]]</center>||New content added for previously empty section [[821_-_Preservation_of_Land_Monuments_and_Property_Corners|821 - Preservation of Land Monuments and Property Corners]].||[https://mdotwiki.state.mi.us/construction/index.php?title=821_-_Preservation_of_Land_Monuments_and_Property_Corners View Here]
 
|-
 
|-
|<center>9/16/2021</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2021||[https://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting View Here]
+
|<center>07/02/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[708_-_Prestressed_Concrete|708 - Prestressed Concrete]]</center>||Major revision to entire section content on Prestressed_Concrete. New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=708_-_Prestressed_Concrete View Here]
|-
 
|<center>9/8/2021</center>||<center>1</center>||<center>[[108.05_Progress_Schedule|108.05]]</center>||Replaced all information for 108.05 Progress Schedule section ||[https://mdotwiki.state.mi.us/construction/index.php?title=108.05_Progress_Schedule&type=revision&diff=6369&oldid=5269 Compare Here]
 
|-
 
|<center>9/2/2021</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07]]</center>|| Updated Final Estimates information and replaced Figure 109-1 ||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6367&oldid=6151 Compare Here]
 
|-
 
|<center>9/1/2021</center>||<center>1 Supplemental</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Removed table and updated Standard Naming Convention Alpha/Numeric lists||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&type=revision&diff=6359&oldid=6293 Compare Here]
 
|-
 
|<center>8/25/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Requirements_for_FHWA_Review_on_Projects_of_Division_Interest_.28PoDI.29|103.02]]</center>||Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity.||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6351&oldid=6350 Compare Here]
 
|-
 
|<center>8/3/2021</center>||<center>1</center>||<center>[[Structural_Fabrication_Quality_Manual|105 Structural Fabrication Quality Manual]]</center>||Updated content on Structural Fabrication Quality Manual page.||[https://mdotwiki.state.mi.us/construction/index.php?title=Structural_Fabrication_Quality_Manual&type=revision&diff=6347&oldid=6006 Compare Here]
 
|-
 
|<center>6/16/2021</center>||<center>1 Supplemental</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02]]</center>||Updated Boilerplate Progress Clause Template document link (revision June 2021)||[https://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause View Here]
 
|-
 
|<center>6/16/2021</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|105]]</center>||Added 2021 MQAP content||[https://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual#2021_Summary_of_Revisions_to_the_MQAP View Here]
 
|-
 
|<center>6/8/2021</center>||<center>1</center>||<center>[[107.01_Laws_to_be_Observed|107.01]]</center>||Created Section 107.01 Laws to be Observed||[https://mdotwiki.state.mi.us/construction/index.php/107.01_Laws_to_be_Observed View Here]
 
|-
 
|<center>5/11/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Office_Technician_Process#Office_Technician_Certification_Requirements|Certified Office Technician Process]]</center>||Clarification of Prerequisites for Office Tech Certification||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Office_Technician_Process&type=revision&diff=6216&oldid=6167 Compare Here]
 
|-
 
|<center>4/19/2021</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07]]</center>||Updated Final Estimates information||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6151&oldid=5946 Compare Here]
 
|-
 
|<center>3/15/2021</center>||<center>1</center>||<center>[[Digital_Calculations_for_Payment|104]]</center>||Created new Digital Calculations for Payment section under Division 1, Section 104||[https://mdotwiki.state.mi.us/construction/index.php/Digital_Calculations_for_Payment View Here]
 
|-
 
|<center>2/9/2021</center>||<center>7</center>||<center>[[712_-_Bridge_Rehabilitation,_Concrete#Hydrodemolition|712]]</center>||Added the Site Activation/Deactivation information||[http://mdotwiki.state.mi.us/construction/index.php?title=712_-_Bridge_Rehabilitation%2C_Concrete&diff=6115&oldid=5606 Compare Here]
 
|-
 
|<center>2/9/2021</center>||<center>7</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Other_Documentation|715]]</center>||Updated information under Item #6, Site Activation/Deactivation||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=6118&oldid=5598 Compare Here]
 
 
|-
 
|-
 
|}
 
|}
Line 147: Line 117:
  
 
==[[#Recent Minor Changes|Recent Minor Changes]]==
 
==[[#Recent Minor Changes|Recent Minor Changes]]==
The table below is a list of Minor changes.   
+
The table below is a list of Minor changes to the Construction Manual in the past 12 months.   
<div style="overflow:auto; height:200px; width:700px">
+
<div style="overflow:auto; height:350px; width:850px">
{| class="wikitable" style="background:yellow; color:black"
+
{| class="wikitable sortable" style="background:yellow; color:black"
 
|-
 
|-
 
!Updated!! Division !! Section !! Summary !! What Changed
 
!Updated!! Division !! Section !! Summary !! What Changed
https://mdotwiki.state.mi.us/construction/index.php/Construction_Technology_Support_Resources
 
|-
 
|<center>08/30/2023</center>||<center>819</center>||<center>[819_-_Electrical_and_Lighting|819 - Electrical and Lighting]</center>||Removed outdated language on 2015 Bid Letting.||[https://mdotwiki.state.mi.us/construction/index.php?title=819_-_Electrical_and_Lighting&type=revision&diff=7450&oldid=6575 Compare Here]
 
|-
 
|<center>08/30/2023</center>||<center>811</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT 811 Uniform Price Adjustment]</center>||Added Wet Reflective Paint to Uniform Price Adjustments||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=7461&oldid=6747 Compare Here]
 
|-
 
|<center>08/30/2023</center>||<center>820</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/820_-_Traffic_Signals#Acceptance_of_Traffic_Signal_Work 820 Acceptance of Traffic Signal Work]</center>||Clarified Acceptance Criteria for Traffic Signal Work||[https://mdotwiki.state.mi.us/construction/index.php?title=820_-_Traffic_Signals&type=revision&diff=7452&oldid=6807 Compare Here]
 
|-
 
|<center>08/22/2023</center>||<center>Supplemental 1</center>||<center>[[Construction_Technology_Support_Resources|Construction Technology Support Resources]]</center>||Updated Construction Technology Support Contacts & Help Desk info.||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Technology_Support_Resources Compare Here]
 
|-
 
|<center>08/22/2023</center>||<center>1</center>||<center>[[102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance|102.19]]</center>||Additional info on transition from CPEs to Notice of Non-Compliance added with link to 20SP-102D-01||[https://mdotwiki.state.mi.us/construction/index.php?title=102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance&type=revision&diff=7329&oldid=7222 Compare Here]
 
|-
 
|<center>08/21/2023</center>||<center>501</center>||<center>[[https://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt#Surface_Preperation|501 Plant Produced Hot Mix Asphalt - Base Preparation]</center>||Updated Base preparation, Bond Coat Structure Adjustments, Yield Calcs and Milling Sections to include photos & examples||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&type=revision&diff=7322&oldid=6529 Compare Here]
 
|-
 
|<center>07/13/2023</center>||<center>1</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Project_Closeout_Escalation_of_Accountability Project Closeout Escalation of Accountability], [[Local_Agency_Program_(LAP)|Local Agency Program (LAP)]], [http://mdotwiki.state.mi.us/construction/index.php/FieldManager FieldManager] [https://mdotwiki.state.mi.us/construction/index.php/104.07_Contractor_Obligations 104.07 Contractor Obligations],  [https://mdotwiki.state.mi.us/construction/index.php/102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)#Construction_Guidance 102.18 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)],  [https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Non-Compliance_of_SESC 208 - Soil Erosion and Sedimentation Control (NPDES)]]</center>||Revised to reflect removal of CPE process and reference Notice of Non-Compliance Process.||[https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance Compare Here]
 
|-
 
|<center>07/10/2023</center>||<center>3</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Division_3_Supplemental_Information Division 3 Supplemental Information]</center>||Removed outdated information on MICHIGAN CERTIFIED AGGREGATE TECHICIAN PROGRAM TRANSITION.||[https://mdotwiki.state.mi.us/construction/index.php?title=Division_3_Supplemental_Information&type=revision&diff=7155&oldid=4286 Compare Here]
 
|-
 
|<center>07/10/2023</center>||<center>1</center>||<center>[[102.01_Prequalification_of_Bidders#Processing_of_Contractor_Performance_Evaluations|102.01 Contractor Performance Evaluations]]</center>||Added examples of PDF approval stamps.||[https://mdotwiki.state.mi.us/construction/index.php?title=102.01_Prequalification_of_Bidders&type=revision&diff=7151&oldid=7149 Compare Here]
 
|-
 
|<center>07/10/2023</center>||<center>Supplemental 1</center>||<center>[[Prevailing_Wage#Wage_Rate_Interviews|Wage Rate Interviews]]</center>||Added example pdf stamp approval.||[https://mdotwiki.state.mi.us/construction/index.php?title=Prevailing_Wage&type=revision&diff=6960&oldid=6954 Compare Here]
 
|-
 
|<center>07/10/2023</center>||<center>Supplemental 1<center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/E-Signature#Transition_to_OneSpan E-Signature]</center>||Added clarificaion on Pay Estimate Signature process||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=7141&oldid=7140 View Here]
 
|-
 
|<center>6/20/2023</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/images_construction/1/1c/Documentation_Guide_June_2023.pdf Documentation Guide 2023]</center>||Updated Documentation Guide June 2023||[https://mdotwiki.state.mi.us/images_construction/1/1c/Documentation_Guide_June_2023.pdf View Here]
 
|-
 
|<center>06/06/2023</center>||<center>109.05</center>||<center>[[109.05_Payment_for_Contract_Revisions|DOCUMENTING_PRICE_NEGOTIATIONS]]</center>||Updated for FHWA Risk Based Project Involvement.||[https://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&type=revision&diff=7099&oldid=6957 Compare Here]
 
|-
 
|<center>04/06/2023</center>||<center>Supplemental 1</center>||<center>[[Prevailing_Wage#Wage_Rate_Interviews|Wage Rate Interviews]]</center>||Added/clarified pdf stamp approval directive and not the use of OneSpan.||[https://mdotwiki.state.mi.us/construction/index.php?title=Prevailing_Wage&type=revision&diff=6960&oldid=6954 Compare Here]
 
|-
 
|<center>03/08/2023</center>||<center>Supplemental 1</center>||<center>[[104.10_Claim_for_Extra_Compensation_or_Extension_of_Time|104.10]]</center>||Updated contact info for MDOT Construction Contracts Engineer.||[https://mdotwiki.state.mi.us/construction/index.php?title=104.10_Claim_for_Extra_Compensation_or_Extension_of_Time&type=revision&diff=6873&oldid=6834 Compare Here]
 
|-
 
|<center>03/07/2023</center>||<center>1</center>||<center>[[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions|103.02 Contract Revisions]]</center>||Updated Flow Chart for Contract Modifications approval for FHWA RBPI process.||[https://mdotwiki.state.mi.us/images_construction/8/84/Appendix_A_-_Approval_Path_Flow_Chart_UPDATED_3-7-23_Final.pdf View Here]
 
|-
 
|<center>02/16/2023</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer list to February 2023.||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 
|-
 
|<center>02/07/2023</center>||<center>1 Supplemental</center>||<center>[[Project_with_Consultant_Oversight|Project with Consultant Oversight]]</center>||Updated language used.||[https://mdotwiki.state.mi.us/construction/index.php?title=Project_with_Consultant_Oversight&type=revision&diff=6854&oldid=5171 Compare Here]
 
|-
 
|<center>12/01/2022</center>||<center>1 Supplemental</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated alpha/numeric standard naming convention lists as of 11/30/2022||[https://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View Here]
 
|-
 
|<center>11/10/2022</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions|109.05]]</center>||Added clarification of acceptable documentation for Force Account Labor on State Funded projects with no Federal Prevailing Wages.||[https://mdotwiki.state.mi.us/construction/index.php/109.05_Payment_for_Contract_Revisions#Labor Compare Here]
 
|-
 
|<center>10/18/2022</center>||<center>1</center>||<center>[[Preconstruction_Meeting#Preconstruction_Meeting_Minutes|Preconstruction Meeting]]</center>||Added verbiage stating preconstruction meetings must not be conducted prior to award of the project.||[https://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&type=revision&diff=6815&oldid=6590 Compare Here]
 
|-
 
|<center>10/05/2022</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Uniform_Price_Adjustment.2C_Regular_Dry_Paint_and_Low_Temperature_Waterborne_Paint|811]]</center>||Updated Permanent Pavement Markings payment table to include 2022 prices||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=6047&oldid=5647 Compare Here]
 
|-
 
|<center>7/20/2022</center>||<center>307</center>||<center>[[307_-_Aggregate_Shoulders_and_Approaches#MEASUREMENT_AND_PAYMENT|Aggregate Shoulders and Approaches, Measurement and Payment]]</center>||Updated moisture content change information under Measurement and Payment||[https://mdotwiki.state.mi.us/construction/index.php?title=307_-_Aggregate_Shoulders_and_Approaches&type=revision&diff=6699&oldid=6620 Compare Here]
 
|-
 
|<center>7/5/2022</center>||<center>1 supplemental</center>||<center>[[Dispute_Review_Board_(DRB)#Dispute_Review_Board_.28DRB.29|Dispute Review Board]]</center>||Updated link to public-facing website for DRB and updated pdf file as of July 2022||[https://mdotwiki.state.mi.us/construction/index.php?title=Dispute_Review_Board_%28DRB%29&type=revision&diff=6696&oldid=6695 Compare Here]
 
|-
 
|<center>7/5/2022</center>||<center>1 supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List to June 2022||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 
 
|-
 
|-
|<center>6/30/2022</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Updated lead times for Steel Pipe pile in excess of 14 inches diameter..., Concrete Beams, and added Precast Box Culverts and Ductile Iron Watermain||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6687&oldid=6675 Compare Here]
+
|<center>08/25/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions|103.02 - Contract Revisions]]</center>||Updated guidance in [[103.02_Contract_Revisions#Premium_Costs_for_Design_Errors_and_Field_Issues|Contract Revisions - Premium Costs for Design Errors and Field Issues]] to include a link to [https://stateofmichigan.sharepoint.com/sites/MDOT-SPC-Inside/Shared%20Documents/Forms/AllItems.aspx?id=%2Fsites%2FMDOT%2DSPC%2DInside%2FShared%20Documents%2FFinance%2FPM%20Tools%2FMDOT%20Dispute%20Resolution%20Policy%20%2D%202022%2Epdf&parent=%2Fsites%2FMDOT%2DSPC%2DInside%2FShared%20Documents%2FFinance%2FPM%20Tools&xsdata=MDV8MDJ8Q2xhcmtKMjVAbWljaGlnYW4uZ292fGE3NDQwMTdlNjUwODRjYWJiZmY4MDhkZGUzZDk3MjI2fGQ1ZmI3MDg3Mzc3NzQyYWQ5NjZhODkyZWY0NzIyNWQxfDB8MHw2Mzg5MTcyNDUyMzIxMjg2MTN8VW5rbm93bnxUV0ZwYkdac2IzZDhleUpGYlhCMGVVMWhjR2tpT25SeWRXVXNJbFlpT2lJd0xqQXVNREF3TUNJc0lsQWlPaUpYYVc0ek1pSXNJa0ZPSWpvaVRXRnBiQ0lzSWxkVUlqb3lmUT09fDB8fHw%3D&sdata=M1dIU09aOFRuZzUrMm9xTkxRVTJlM25mMkxlQWtid3VudXFRWDMxVkY0RT0%3D&clickparams=eyAiWC1BcHBOYW1lIiA6ICJNaWNyb3NvZnQgT3V0bG9vayIsICJYLUFwcFZlcnNpb24iIDogIjE2LjAuMTkwMjkuMjAyMDgiLCAiT1MiIDogIldpbmRvd3MiIH0%3D ACEC Dispute Resolution Process for design issues].  ||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=9393&oldid=9069 Compare Here]
 
|-
 
|-
|<center>6/7/2022</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Turbidity_Curtain|208]]</center>||Added new Turbidity Curtain section||[https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Turbidity_Curtain View Here]
+
|<center>05/20/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[821_-_Preservation_of_Land_Monuments_and_Property_Corners|821 - Preservation of Land Monuments and Property Corners]]</center>||Minor update of example documents for monument corners tables [[821_-_Preservation_of_Land_Monuments_and_Property_Corners|821 - Preservation of Land Monuments and Property Corners]].||[https://mdotwiki.state.mi.us/construction/index.php?title=821_-_Preservation_of_Land_Monuments_and_Property_Corners#Corner_Tables View Here]
 
|-
 
|-
|<center>5/26/2022</center>||<center>1</center>||<center>[[Process_for_Documenting_Certified_Materials_in_FieldManager|Process for Documenting Certified Materials in FieldManager]]</center>||Updated content and added samples||[https://mdotwiki.state.mi.us/construction/index.php?title=Process_for_Documenting_Certified_Materials_in_FieldManager&type=revision&diff=6682&oldid=6591 Compare Here]
+
|<center>04/29/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/820_-_Traffic_Signals#Notification_of_Traffic_Signal_Work 820 Notification of Traffic Signal Work]</center>||Updated contact information for Traffic Signal work.||[https://mdotwiki.state.mi.us/construction/index.php?title=820_-_Traffic_Signals#Notification_of_Traffic_Signal_Work View Here]
 
|-
 
|-
|<center>4/14/2022</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List to April 2022||[https://mdotwiki.state.mi.us/images_construction/e/ec/Engineer_certification_list_-_April_2022.pdf View Here]
+
|<center>03/20/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated [https://mdotwiki.state.mi.us/images_construction/5/5f/012_Engineer_certification_list_-MARCH_19_2025.pdf Certified Engineer list] to March 2025.||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process#Current_Certified_Engineers View Here]
 
|-
 
|-
|<center>4/14/2022</center>||<center>1 Supplemental</center>||<center>[[Dispute_Review_Board_(DRB)#Dispute_Review_Board_Process_Flowchart|Dispute Review Board Process Flowchart]]</center>||Updated DRB Process Flowchart to 2022||[https://mdotwiki.state.mi.us/construction/index.php/Dispute_Review_Board_(DRB)#Dispute_Review_Board_Process_Flowchart View Here]
+
|<center>02/06/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel Division 7]</center>||<center>[[715 - Cleaning_and_Coating_Existing_Structural_Steel|715 - Cleaning and Coating Existing Structural Steel]]</center>||Removed guidance which conflicted with the standard specs.  ||[https://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&type=revision&diff=8917&oldid=7024 Compare Here]
 
|-
 
|-
|<center>3/15/2022</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109.07]]</center>||Updated and reorganized section to clarifying information||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6637&oldid=6483 Compare Here]
+
|<center>02/04/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Inspector’s_Daily_Work_Report_(DWR)|Inspector’s Daily Work Report (DWR)]]</center>||Updated Inspectors Daily Work Report (DWR) page to remove approval stamp which no longer applies.  ||[https://mdotwiki.state.mi.us/construction/index.php?title=Inspector%E2%80%99s_Daily_Work_Report_(DWR) View Here]
 
|-
 
|-
|<center>2/17/2022</center>||<center>1 Supplemental</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated alpha/numeric standard naming convention lists as of 2/17/2022||[https://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View Here]
+
|<center>02/04/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated [https://mdotwiki.state.mi.us/images_construction/c/c8/012_Engineer_certification_list_-FEBRUARY_03_2025.pdf Certified Engineer list] to February 2025.||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process#Current_Certified_Engineers View Here]
 
|-
 
|-
|<center>2/3/2022</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List for February 2022||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
+
|<center>01/13/2025</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=Standard_Naming_Convention#MDOT_Standard_Naming_Convention MDOT Standard Naming Convention]</center>||Addition of [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1459.pdf Form 1459 - Structure Installation Inspection Request] form to [[Standard_Naming_Convention|Standard Naming Convention]]. ''(Reminder you can sort list by recent changes column)'' ||[https://mdotwiki.state.mi.us/construction/index.php?title=Standard_Naming_Convention&type=revision&diff=8874&oldid=8604 Compare Here]
 
|-
 
|-
|<center>1/18/2022</center>||<center>1 Supplemental</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Updated Typical Long-Lead Items table Lead Times for Delineator and 3# U-Channel Posts||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6530&oldid=6485 Compare Here]
+
|<center>11/13/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[205_-_Roadway_Earthwork#Disposing_of_Surplus_and_Unsuitable_Material|205 - Disposing of Surplus and Unsuitable Material]]</center>||Minor update to Region notification prior to off-site disposal of soils||[https://mdotwiki.state.mi.us/construction/index.php?title=205_-_Roadway_Earthwork&type=revision&diff=8830&oldid=8757 Compare Here]
 
|-
 
|-
|<center>1/5/2022</center>||<center>1</center>||<center>[[Final_Project_Review_Report|Final Project Review Report]]</center>||Updated Final Project Review Report User Guide to September 2020 version||[https://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review_Report&type=revision&diff=6488&oldid=6174 Compare Here]
+
|<center>10/01/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated [https://mdotwiki.state.mi.us/images_construction/a/a3/012_Engineer_certification_list_-OCTOBER_2024.pdf Certified Engineer list] to October 2024.||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process#Current_Certified_Engineers View Here]
 
|-
 
|-
|<center>1/4/2022</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Updated/added Typical Long-Lead Items times for Guardrail-Steel||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6485&oldid=6353 Compare Here]
+
|<center>09/30/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[821_-_Preservation_of_Land_Monuments_and_Property_Corners|821 - Preservation of Land Monuments and Property Corners]]</center>||Minor update for contacts on Local Agency Projects [[821_-_Preservation_of_Land_Monuments_and_Property_Corners|821 - Preservation of Land Monuments and Property Corners]].||[https://mdotwiki.state.mi.us/construction/index.php?title=821_-_Preservation_of_Land_Monuments_and_Property_Corners&type=revision&diff=8687&oldid=8628 Compare Here]
 
|-
 
|-
|<center>1/4/2022</center>||<center>1 Supplemental</center>||<center>[[Local_Agency_Program_(LAP)#Construction_Manual_index.2Flinks_for_.E2.80.98LAP_Project_Considerations.E2.80.99|Local Agency Program]]</center>||Added Archeological and Historical Findings resource||[https://mdotwiki.state.mi.us/construction/index.php/Local_Agency_Program_(LAP)#Construction_Manual_index.2Flinks_for_.E2.80.98LAP_Project_Considerations.E2.80.99 View Here]
+
|<center>08/19/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[821_-_Preservation_of_Land_Monuments_and_Property_Corners|821 - Preservation of Land Monuments and Property Corners]]</center>||Updated PLSS Natural Witness Example [[821_-_Preservation_of_Land_Monuments_and_Property_Corners|821 - Preservation of Land Monuments and Property Corners]].||[https://mdotwiki.state.mi.us/construction/index.php?title=821_-_Preservation_of_Land_Monuments_and_Property_Corners&type=revision&diff=8628&oldid=8596 Compare Here]
 
|-
 
|-
|<center>12/14/2021</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501]]</center>||Updated 2012 to 2020 Spec Book reference||[https://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt View Here]
+
|<center>08/15/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Dispute_Review_Board_(DRB)#Dispute_Review_Board_.28DRB.29|Dispute Review Board]]</center>||Updated links and added clarification langauge on process to add or remove DRB from projects. ||[https://mdotwiki.state.mi.us/construction/index.php?title=Dispute_Review_Board_%28DRB%29&type=revision&diff=8624&oldid=6696 Compare Here]
 
|-
 
|-
|<center>12/13/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List for December 2021||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
+
|<center>07/01/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=Category:Division_8 Division 8]</center>||<center>[[826_–_Intelligent_Transportation_Systems|826 – Intelligent Transportation Systems]]</center>||Updated Section 826 with minor edits and added to left side menu.  ||[https://mdotwiki.state.mi.us/construction/index.php?title=826_%E2%80%93_Intelligent_Transportation_Systems&type=revision&diff=8250&oldid=8249 Compare Here]
 
|-
 
|-
|<center>11/17/2021</center>||<center>1</center>||<center>[[FieldManager#Bi-Annual_FieldManager_User_Account_Verification_Process|Bi-Annual FieldManager User Account Verification Process]]</center>||Updated all content.||[https://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&type=revision&diff=6438&oldid=6103 Compare Here]
+
|<center>07/01/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=Category:Division_8 Division 8]</center>||<center>[[825_-_Sanitary_Sewer_Systems|825 - Sanitary Sewer Systems]]</center>||Updated Section 825 with minor edits and added to left side menu. ||[https://mdotwiki.state.mi.us/construction/index.php?title=825_-_Sanitary_Sewer_Systems&type=revision&diff=8529&oldid=7708 Compare Here]
 
|-
 
|-
 
|}
 
|}

Latest revision as of 17:56, 4 September 2025

www.michigan.gov/mdot


CONSTRUCTION MANUAL


Logo.jpg


Bureau of Field Services
Construction Field Services Division

Box culvert construction on M-10 in Clare County.

MDOT Mission Statement

Providing the highest quality integrated transportation services for economic benefit and improved quality of life.


Current News

AASHTOWare Project Construction & Materials Software Manual

Support for AASHTOware Construction and Materials can be found at the new AASHTOWare Project Construction & Materials Software Manual

For any additional support please contact the AASHTOWare Helpdesk email MDOT-ConstructionSoftware@michigan.gov or the FieldManager Helpdesk email FieldManager-Admin@michigan.gov.

MI MDOT Software Support.png

[top of page]


Recent Major Changes

The table below is a list of Major changes to the Construction Manual in the past 12 months.

Updated Division Section Summary What Changed
09/03/2025
Division 1
107.15 Compliance with Laws; Environmental Protection
Updated guidance for field staff on signing manifests or other documents related to hazardous or non-hazardous materials. Compare Here
08/26/2025
Division 1 Supplemental
Construction Field Services Indirect Testing Charges
Updated the Indirect Testing coding for FY26 Compare Here
08/26/2025
Division 2
206 - Excavation and Backfill for Structures
Major revision to entire section content on 206 - Excavation and Backfill for Structures. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/26/2025
Division 2
207 - Obliterating Roadway
Major revision to entire section content on 207 - Obliterating Roadway. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/26/2025
Division 2
208 - Soil Erosion and Sedimentation Control (NPDES)
Major revision to entire section content on 208 - Soil Erosion and Sedimentation Control (NPDES). New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/26/2025
Division 2
209 - Project Cleanup
Major revision to entire section content on 209 - Project Cleanup. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/21/2025
Division 4
401 - Culverts
Major revision to entire section content on 401 - Culverts. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/21/2025
Division 4
402 - Storm Sewers
Major revision to entire section content on 402 - Storm Sewers. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/21/2025
Division 4
403 - Drainage Structures
Major revision to entire section content on 403 - Drainage Structures. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/19/2025
Division 2
204 - Removing Miscellaneous Structures and Materials
Major revision to entire section content on 204 - Removing Miscellaneous Structures and Materials. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
08/19/2025
Division 2
205 - Roadway Earthwork
Major revision to entire section content on 205 - Roadway Earthwork. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
07/31/2025
Division 2
201 - Clearing
Major revision to entire section content on 201 - Clearing. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
07/31/2025
Division 2
202 - Removing Trees, Stumps, and Corduroy
Major revision to entire section content on 202 - Removing Trees, Stumps, and Corduroy. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
07/31/2025
Division 2
203 - Removing Drainage Structures, Culverts, and Sewers
Major revision to entire section content on 203 - Removing Drainage Structures, Culverts, and Sewers. New content, additional pictures/figures, and re-format to new Construction Manual format. Compare Here
07/29/2025
Sidebar
Documentation Guide 2025
Updated Documentation Guide 2025 View Here
07/28/2025
Division 1 Supplemental
MDOT Standard Naming Convention
Significant update of MDOT Standard Naming Conventions. DWR Calculation attachments relocated to 208 folder. Compare Changes
07/28/2025
Division 1 Supplemental
Inspector’s Daily Work Report (DWR)
Updated Inspectors Daily Work Report (DWR) page with new requirements. Compare Changes
04/28/2025
Division 1 Supplemental
Preconstruction Meeting
Updated Trunk Line Boilerplate Preconstruction Meeting Minutes - 04-28-2025 View Here
03/30/2025
Division 5
501 - Plant Produced Hot Mix Asphalt
Updated section 501 to include the MDOT HMA Paving Operations Training Videos. View Here
03/04/2025
Division 1
103.02 - Contract Revisions
Updated guidance for Construction Phase Funding Revisions Compare Here
03/03/2025
Division 1
Civil Rights Programs
former Disadvantaged Business Enterprises (DBE) page renamed to Civil Rights Programs View Here
01/15/2025
Division 1
Inspector’s Daily Work Report (DWR)
Updated Inspectors Daily Work Report (DWR) page for AASHTOWare with new content and sample DWR. View Here
01/14/2025
Division 1
109.07 - Final Inspection, Acceptance, and Final Payment
Updated contents of entire section 109.07 to reflect process on AASHTOWare contracts. Compare Here
01/14/2025
Division 1
109.04 Progress and Partial Payments
Updated contents of entire section 109.04 to reflect process on AASHTOWare contracts. Compare Here
12/09/2024
Division 8
810 - Permanent Traffic Signs and Supports
Updated directions for placement of installation date sticker on signs. Compare Here
11/06/2024
Construction Manual
Construction Manual
Updates to entire Contruction Manual to change terminology from IDR to DWR and from Contract Modification to Change Order to meet AASHTOWare terminology. Table of Contents
10/21/2024
Division 1
Section 110 - Mobilization
Deleted page Section 150 - Mobilization, replaced with Section 110 - Mobilization per new spec book View Here
10/21/2024
Division 1 Supplemental
Construction Field Services Indirect Testing Charges
Updated the Indirect Testing coding for FY25 View Here
10/21/2024
Division 8
811 Permanent Pavement Markings
Updated Permanent Pavement Markings payment table to include 2024 price adjustments View Here
10/14/2024
Division 1 Supplemental
Preconstruction Meeting
Updated Trunk Line Boilerplate Preconstruction Meeting Minutes - 10-14-2024 View Here
10/03/2024
Division 1
103 - Work Orders
Updated instructions for issuing and processing work orders including stamped authorizations. Compare Here
09/26/2024
Division 7
706 - Structural Concrete
Minor revisions to section 706 content on Structural Concrete. Compare Here
09/26/2024
Division 2
208 - Soil Erosion and Sedimentation Control (NPDES)
Added link to new MDOT SESC Pocket Guide View Here
09/05/2024
Division 7
707 - Structural Steel
Major revision to entire section content on Structural Steel. New content, additional pictures/figures, and re-format to new Construction Manual format. View Here
07/22/2024
Division 8
821 - Preservation of Land Monuments and Property Corners
New content added for previously empty section 821 - Preservation of Land Monuments and Property Corners. View Here
07/02/2024
Division 7
708 - Prestressed Concrete
Major revision to entire section content on Prestressed_Concrete. New content, additional pictures/figures, and re-format to new Construction Manual format. View Here

A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.

[top of page]


Recent Minor Changes

The table below is a list of Minor changes to the Construction Manual in the past 12 months.

Updated Division Section Summary What Changed
08/25/2025
Division 1
103.02 - Contract Revisions
Updated guidance in Contract Revisions - Premium Costs for Design Errors and Field Issues to include a link to ACEC Dispute Resolution Process for design issues. Compare Here
05/20/2025
Division 8
821 - Preservation of Land Monuments and Property Corners
Minor update of example documents for monument corners tables 821 - Preservation of Land Monuments and Property Corners. View Here
04/29/2025
Division 8
820 Notification of Traffic Signal Work
Updated contact information for Traffic Signal work. View Here
03/20/2025
Division 1 Supplemental
Certified Engineer List
Updated Certified Engineer list to March 2025. View Here
02/06/2025
Division 7
715 - Cleaning and Coating Existing Structural Steel
Removed guidance which conflicted with the standard specs. Compare Here
02/04/2025
Division 1
Inspector’s Daily Work Report (DWR)
Updated Inspectors Daily Work Report (DWR) page to remove approval stamp which no longer applies. View Here
02/04/2025
Division 1 Supplemental
Certified Engineer List
Updated Certified Engineer list to February 2025. View Here
01/13/2025
Division 1 Supplemental
MDOT Standard Naming Convention
Addition of Form 1459 - Structure Installation Inspection Request form to Standard Naming Convention. (Reminder you can sort list by recent changes column) Compare Here
11/13/2024
Division 2
205 - Disposing of Surplus and Unsuitable Material
Minor update to Region notification prior to off-site disposal of soils Compare Here
10/01/2024
Division 1 Supplemental
Certified Engineer List
Updated Certified Engineer list to October 2024. View Here
09/30/2024
Division 8
821 - Preservation of Land Monuments and Property Corners
Minor update for contacts on Local Agency Projects 821 - Preservation of Land Monuments and Property Corners. Compare Here
08/19/2024
Division 8
821 - Preservation of Land Monuments and Property Corners
Updated PLSS Natural Witness Example 821 - Preservation of Land Monuments and Property Corners. Compare Here
08/15/2024
Division 1 Supplemental
Dispute Review Board
Updated links and added clarification langauge on process to add or remove DRB from projects. Compare Here
07/01/2024
Division 8
826 – Intelligent Transportation Systems
Updated Section 826 with minor edits and added to left side menu. Compare Here
07/01/2024
Division 8
825 - Sanitary Sewer Systems
Updated Section 825 with minor edits and added to left side menu. Compare Here

[top of page]


Sign Up for Updates

To learn about how to sign up to receive updates related to MDOT's Construction Manual Wiki along with other State of Michigan content check out the video provided below.

Click here to learn how to sign up for MDOT notifications

ListServ Red Envelope2.PNG

Preamble

This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:

  1. Hold paramount the safety, health, and welfare of the public.
  2. Perform Services only in areas of their competence.
  3. Issue public statement only in an objective and truthful manner.
  4. Act for each employer or client as faithful agents or trustees.
  5. Avoid deceptive acts.
  6. Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.


This manual has been formatted and organized to follow the MDOT Standard Specifications outline with divisions and sections set up to facilitate easy cross referencing.

Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the MDOT Construction Manual Content Revision Procedures page.


[top of page]