User contributions
Jump to navigation
Jump to search
- 08:11, 23 July 2020 diff hist +37 N File:MDOT Production Rates.xlsx original file lost, reloading to site current
- 08:09, 23 July 2020 diff hist 0 File:MDOT Production Rates .xlsx SchaeferS uploaded a new version of "File:MDOT Production Rates .xlsx" current
- 17:00, 22 July 2020 diff hist +321 Main Page →Recent Minor Changes: Added FieldManager Update
- 16:53, 22 July 2020 diff hist -1,673 FieldManager →Inspector's Daily Report (IDR): updated IDR info
- 16:33, 22 July 2020 diff hist +182 FieldManager →Standard Rounding Convention Guidance: Updated/Added HMA section
- 16:08, 22 July 2020 diff hist +327 Main Page →Recent Major Changes: Added change to 109.05 Payment for Contract Revisions
- 12:50, 22 July 2020 diff hist +117 E-Construction →LAP Project Considerations: added link
- 12:26, 22 July 2020 diff hist +118 Preconstruction Meeting →LAP Project Considerations: added links
- 12:20, 22 July 2020 diff hist +4,052 Local Agency Program (LAP) updated content and links
- 12:01, 22 July 2020 diff hist -14,470 Local Agency Program (LAP) Add newly updated LAP information to this section
- 10:23, 22 July 2020 diff hist +297 Main Page →Recent Major Changes: Updates to Section 105, adding 2020 MQAP content
- 10:18, 22 July 2020 diff hist +1 m Materials Quality Assurance Procedures Manual →2020 Summary of Revision to the MQAP: corrected typo
- 10:07, 22 July 2020 diff hist +9,839 Materials Quality Assurance Procedures Manual Added 2020 Summary of Revisions to the MQAP
- 14:26, 21 July 2020 diff hist +929 E-Construction Rework on LAP Project Considerations (didn't save from last week's update)
- 14:21, 21 July 2020 diff hist 0 File:PW LAP Construction Template image1.jpg SchaeferS uploaded a new version of "File:PW LAP Construction Template image1.jpg" current
- 14:19, 21 July 2020 diff hist 0 N File:PW LAP Construction Template image.png current
- 13:24, 21 July 2020 diff hist +2 109.07 Final Inspection, Acceptance, and Final Payment →LAP Project Considerations: Changed header type
- 13:23, 21 July 2020 diff hist +2 109.07 Final Inspection, Acceptance, and Final Payment →LAP Project Considerations: Changed header type
- 13:23, 21 July 2020 diff hist +2 109.07 Final Inspection, Acceptance, and Final Payment →LAP Project Considerations: changed header type
- 13:22, 21 July 2020 diff hist +2 109.07 Final Inspection, Acceptance, and Final Payment →LAP Project Considerations: Changed header type