Uploads by McGowanR
Jump to navigation
Jump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
12:23, 22 May 2019 | Numeric Linked 5-22-19.pdf (file) | 272 KB | Updated Minimum Elements Component Naming Example for File 306 Form 1976. Previously listed as: 1174 YYYY‐MM‐DD GJM XYZ Supplier Plant 1 Revised to: 1976 YYYY‐MM‐DD GJM XYZ Supplier Plant 1 | 1 | |
12:07, 22 May 2019 | Numeric order econ.pdf (file) | 272 KB | Updated Minimum Elements Component Naming Example for File 306 Form 1976. Previously listed as: 1174 YYYY‐MM‐DD GJM XYZ Supplier Plant 1 Revised to: 1976 YYYY‐MM‐DD GJM XYZ Supplier Plant 1 | 3 | |
14:05, 20 June 2019 | Standard Naming Convention.pdf (file) | 273 KB | 1 | ||
11:35, 30 April 2018 | DI-06384-020.jpg (file) | 279 KB | I-69 construction project in Flint. | 1 | |
19:55, 13 February 2020 | Standard Naming Convention Revised 2-13-20.pdf (file) | 290 KB | 1 | ||
13:18, 4 November 2020 | Standard Naming Convention Revised 11-4-2020.pdf (file) | 302 KB | Minor Syntax and Linking Correction to 10-29-20 file as per Mo Azam | 1 | |
15:41, 29 March 2016 | Managing Info Tech Mobile Inspector within FieldManager.pdf (file) | 323 KB | Mobile Inspector Device Setup Guide | 1 | |
16:49, 14 December 2016 | 1190.pdf (file) | 325 KB | 1 | ||
15:02, 14 December 2016 | DI-05222-017.jpg (file) | 351 KB | I-96.Cascade Rd Diverging Diamond Interchange project in Grand Rapids, Kent County | 1 | |
12:35, 9 January 2018 | DI-06215-039.jpg (file) | 683 KB | Construction work on the US-127 Sound Wall between Grand River ave and Lake Lansing Rd. | 1 | |
13:48, 5 September 2018 | DI-06570-091.jpg (file) | 710 KB | US-131 10 Mile to 14 Mile Rd construction in Kent County. placing cement treated subbase | 1 | |
11:57, 6 March 2019 | DI-06711-091.jpg (file) | 721 KB | 1 | ||
12:39, 9 January 2018 | DI-06239-007.jpg (file) | 788 KB | Underground sewer pipe being put in under I-75 for Plaza. | 1 | |
15:18, 14 December 2016 | DI-05649-050.jpg (file) | 842 KB | Construction work on the M-1 Rail Woodward Ave. | 1 | |
16:13, 20 June 2016 | CMU16-001 AMG Attachment Final.pdf (file) | 874 KB | 1 | ||
15:38, 6 June 2018 | DI-06414-080.jpg (file) | 950 KB | Pouring concrete on the I-75 Rouge River project | 1 | |
12:14, 27 November 2023 | AFAD.jpg (file) | 959 KB | 1 | ||
13:33, 19 September 2018 | Construction Records Transmittal and Retrieval Procedures For MDOT TSCs.pdf (file) | 1.01 MB | Construction Records Transmittal and Retrieval Procedures For MDOT TSCs | 1 | |
11:45, 7 May 2019 | DI-06801-092.jpg (file) | 1.18 MB | 1 | ||
12:40, 9 January 2018 | DI-05767-052.jpg (file) | 1.28 MB | Construction work on the US-23 Flex Route. | 1 | |
15:15, 14 December 2016 | DI-05650-060.jpg (file) | 1.33 MB | Construction on Bridge decks on the Square Lake Rd Interchange project. | 1 | |
09:55, 18 September 2019 | CMU 602 Load Tranfer Assembly Inspections Presentation.pdf (file) | 1.41 MB | 1 | ||
14:47, 28 February 2019 | Documentation Guide Final Draft 02-25-19.pdf (file) | 1.74 MB | 1 | ||
16:47, 31 July 2019 | Documentation Guide Final Draft 07-29-19.pdf (file) | 2.53 MB | 1 | ||
09:31, 18 September 2019 | CMU 602 Load Tranfer Assembly Inspections Presentation.pptx (file) | 3.62 MB | 1 | ||
11:24, 1 May 2018 | Test JBoss WMV.wmv (file) | 10.89 MB | Test | 1 |