Search results

Jump to navigation Jump to search
  • ==[[#CONSTRUCTION|'''CONSTRUCTION''']]== ...er an asset is constructed. Please reference [https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanent_Traffic_Signs_and_Supports#INSPECTION_.26_T
    2 KB (199 words) - 15:46, 2 April 2024
  • ==[[#CONSTRUCTION|'''CONSTRUCTION''']]== ...s constructed or installed. Please reference [https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanent_Traffic_Signs_and_Supports#INSPECTION_.26_T
    2 KB (214 words) - 16:07, 2 April 2024
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== [[Category:Construction Manual]]
    1 KB (177 words) - 12:47, 19 January 2022
  • :[http://mdotwiki.state.mi.us/construction/index.php/Construction_Contract_Modification_Process_Overview Contract Modi ...Standard-Specifications-Construction.pdf MDOT 2020 Standard Specifications Construction]
    2 KB (328 words) - 08:52, 8 May 2024
  • #REDIRECT [[E-Construction#Standard_Naming_Convention_for_Documents]]
    69 bytes (7 words) - 14:50, 22 August 2018
  • #REDIRECT [[E-Construction#Standard_Naming_Convention_for_Documents]]
    69 bytes (7 words) - 14:53, 22 August 2018
  • #REDIRECT [[E-Construction#General_Procedures_for_Construction_Records_Retention]]
    82 bytes (8 words) - 14:58, 22 August 2018
  • #REDIRECT [[Construction Value Engineering Change Proposal (VECP)]]
    67 bytes (7 words) - 09:37, 8 June 2017
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== ...and stumps should be measured according to the Standard Specifications for Construction and the location of each item should be reported on the IDR when completed,
    2 KB (326 words) - 10:07, 13 September 2023
  • ==[[#CONSTRUCTION|CONSTRUCTION]]== Service must be maintained during these construction operations.
    2 KB (304 words) - 10:05, 13 September 2023
  • ...uirements for these projects are the same as any state or federally funded construction project. The same procedures for inspection, pay item documentation, qualit ...tance and submission of the final estimate remain the same as for standard construction projects. In order to process the final estimate, the project records will
    1 KB (157 words) - 09:42, 3 January 2018
  • #REDIRECT [[MDOT Construction Manual Content Revision Procedures]]
    66 bytes (7 words) - 13:01, 28 April 2021
  • ==CONSTRUCTION== ...012/150%20Mobilization.pdf Section 150] of the Standard Specifications for Construction are to be documented on the IDR.
    2 KB (256 words) - 17:42, 12 January 2022
  • <center>[mailto:?body=https://mdotwiki.state.mi.us/construction/index.php/107.01_Laws_to_be_Observed Email this Page]</center> ...aterial is a combination of background information and actions required by construction administration staff to ensure compliance with all applicable rules and reg
    650 bytes (79 words) - 17:20, 13 July 2021
  • ...://mdotwiki.state.mi.us/aashtoware/index.php/Main_Page AASHTOWare Project Construction and Materials Software Manual]
    347 bytes (42 words) - 10:57, 22 August 2023
  • ...ese concerns, by either party, should be addressed and resolved at the pre-construction meeting. ==[[#CONSTRUCTION|CONSTRUCTION]]==
    2 KB (293 words) - 12:42, 19 January 2022
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Structural_Fabrication_Quality_Manual Email this Page]</div> ...s [https://www.michigan.gov/mdot/programs/bridges-and-structures/structure-construction/structural-fabrication-unit/structural-fabrication-quality-manual SFQM webs
    1 KB (141 words) - 15:24, 11 January 2024
  • <center>[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting Email this Page]</center> ...representative, sent to all attendees, and placed in projects ProjectWise construction folder in file 107 Preconstruction and Progress Meetings.
    2 KB (320 words) - 11:18, 14 September 2023
  • ...tyle="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/107.15_Compliance_with_Laws;_Environmental_Protection Email this Dust control is very important, especially during the earthwork phase of construction. Adequate dust control measures will be maintained by the Contractor so as
    686 bytes (98 words) - 17:36, 12 January 2022
  • ...ly under construction is addressed in the MDOT Standard Specifications for Construction, section 103.02.D, which describes the Suspension of Work Ordered by the En ...on 104.01.B describes the Authority of the Engineer to Suspend Work during construction.
    3 KB (442 words) - 17:11, 6 May 2021

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)