Search results

Jump to navigation Jump to search
  • *'''Tier 1''' – Projects selected by the region or TSC with regular plan sets. ITS | 1 ||Projects with regular plan sets and ITS projects. At a minimum, recommen
    7 KB (1,055 words) - 11:29, 14 July 2020
  • The Freight Services and Safety Division of the Bureau of Urban and Public Transportation is responsible for recomme ...pections are performed by the local agency and Freight Services and Safety Division.
    12 KB (1,772 words) - 17:35, 14 December 2023
  • ...ons for Construction. Projects with all major work on a single pay item or division will only be considered if the other submitted projects contain a more dive ...only be allowable if the Certified Engineer has a minimum of 2 closed and 1 open project to show in the past two years, similar to Certified Engineer A
    10 KB (1,464 words) - 13:56, 29 November 2023
  • ...ntrol, of the Standard Specifications for Construction, and any applicable supplemental specifications, Michigan Department of Environment, Great Lakes, and Energy ...stumps, brush, shrubs and other vegetation occurring between lines 3 feet (1 m) outside the grading limits. Grading limits will include the vertical cu
    8 KB (1,133 words) - 12:01, 28 March 2023
  • ...w.ecfr.gov/cgi-bin/text-idx?SID=c961274a08c1423164e297c9d95b4e02&node=pt29.1.5&rgn=div5 29 CFR 3.3 Part 5 Federal Contract Law Provisions] electronic si [[Category: Division 1]]
    8 KB (1,208 words) - 15:30, 20 September 2023
  • ...an be obtained from the Specifications and Estimates Section in the Design Division. The contractor does not bid on these pay items. The pay items are establ (*) The supplemental pay item description can be as appropriate for the project, but it must use
    9 KB (1,226 words) - 10:05, 2 May 2023
  • ...for the purpose of records retention) is the date the Financial Operations Division (FOD) does the final billing to FHWA for federal funds. In addition to the | [//{{SERVERNAME}}/images_construction/1/15/ProjectWise_Unique_SP_search.pdf ProjectWise Unique Search] || Guidance
    12 KB (1,824 words) - 16:49, 18 April 2024
  • ...vailable with the Construction Contracts Unit, Construction Field Services Division. *After January 1, 2021, the review team must also have at least two materials related certif
    19 KB (2,779 words) - 17:01, 6 November 2023
  • ...emedies may also include steps identified in [https://ecfr.io/Title-02/sp2.1.180.d 2 CFR 200: Subpart D], including: [[Category:Division 1]]
    13 KB (1,768 words) - 11:05, 13 July 2023
  • Additional documentation, narratives, and supplemental files may be necessary to comply with the scheduling specifications and can [[category:Division 1]]
    8 KB (1,206 words) - 14:27, 29 February 2024
  • ...m Integrator || Provide integration of ITS devices into the sub-system<sup>1</sup> and overall system<sup>2</sup>. <sup>1</sup>Sub-system: A single field device location where ITS devices are inst
    17 KB (2,411 words) - 15:12, 19 June 2017
  • <div id="701.03.A.1"></div> ::'''1.''' Batch plant equipment, certification, and certification waiver requirem
    12 KB (1,593 words) - 13:11, 26 July 2022
  • <center><span STYLE="font: 40pt arial;">'''Division 7 Supplemental Information'''</span></center> ...Bridge Decks Concrete Depth Measurements, for all bridge deck pours. See Division 706 of the Construction Manual for a sample form and instructions. Concret
    33 KB (4,932 words) - 16:38, 12 May 2021
  • ...SID=4f4c8515fcb6873787857e30df84a31b&mc=true&node=pt23.1.635&rgn=div5#se23.1.635_1105 23 CFR 635.105], MDOT is responsible for the construction of all F ...ersight (S&O) Agreement] detailing the arrangement between FHWA’s Michigan Division and MDOT regarding agency roles and responsibilities with respect to federa
    30 KB (4,182 words) - 18:40, 13 December 2023
  • * Supplemental Specifications ...t line at right angles to the pavement’s centerline, within a tolerance of 1 inch per lane width. The longitudinal joint adjacent to other lanes, ramps
    23 KB (3,714 words) - 10:16, 13 September 2023
  • ...placing a concrete mixture of portland cement, blended portland cement, supplemental cementitious materials, fine aggregate, coarse aggregate, water, and admi <div id="601.03.A.1"></div>
    36 KB (5,127 words) - 13:21, 26 July 2022
  • The Office of Business Development (OBD) has developed a supplemental guide to assist construction staff in the monitoring of CUF activitie .../project engineer is notified of all commitments by the Contracts Services Division (CSD). The email notification includes all DBE commitment specifics and whe
    27 KB (4,137 words) - 14:31, 17 April 2024
  • 1.81 x 19.54 = 35.367 Sft 12.25 x 55.18 x 1.12 = 757.070 Cft
    26 KB (3,807 words) - 11:03, 22 August 2023
  • ...ction/index.php/E-Construction#e-Construction.2FPaper_File_System Division 1 e-construction tables]. The element sequence and general format are as fo [[File:Naming image 1.jpg]]
    57 KB (6,809 words) - 13:43, 25 April 2024
  • ::* Supplemental unemployment benefit programs ...the contractor’s breakdown, contact the Construction Field Services (CFS) Division’s Prevailing Wage Compliance Specialist.
    63 KB (9,521 words) - 14:09, 1 April 2024

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)