Search results

Jump to navigation Jump to search
  • ...sponsible for the project documentation regardless of who is on their team or how long they have been in charge of the project. Certified engineers who a ** Current Office Technician Certificate of Completion OR
    10 KB (1,464 words) - 13:56, 29 November 2023
  • ...d or broken down to at least 3 feet (1 m) below final ground elevation and/or final pavement surface. Portions of existing structures and/or culvert structures not interfering with new construction will be removed to
    9 KB (1,264 words) - 13:09, 13 May 2024
  • ...nal requirements at a less cost or improve value or service at no increase or a minor increase in cost. The net savings of each proposal is usually share ...of maintenance, desired appearance, impact on utilities and right-of-way, or the design and safety standards.
    9 KB (1,297 words) - 14:57, 11 October 2022
  • ...e. Conversely a particular section might have topics that are unique and/or supplementary to the template.'' ...section should also describe why the work is done or what purpose the item or work serves in general. (IE Paint marking helps drivers delineate traffic
    14 KB (2,089 words) - 09:11, 11 April 2024
  • ...staked by project personnel with assistance of the Region Resource Analyst or Roadside Development personnel. ...on or species on the plans. This record will fulfill the requirements for documentation of location of the various plants. This report is subject to revision to c
    6 KB (797 words) - 17:08, 27 March 2023
  • ...cy:</u> A file deficiency that can be corrected with proper documentation or a letter to the file. *Documentation added to the file
    13 KB (1,768 words) - 11:05, 13 July 2023
  • ...ng documentation for this pay item is to be an IDR posted by the engineer (or their representative) and placed in the project file. The IDR is to be gen
    2 KB (256 words) - 17:42, 12 January 2022
  • ...on/index.php/Certified_Engineer_Process MDOT’s Certified Engineer Program] or is not eligible to obtain certification under this program. The non-certif ...he FPR is to verify that final contract quantities are supported by proper documentation and have been paid in accordance with contract documents and MDOT’s Stand
    19 KB (2,779 words) - 17:01, 6 November 2023
  • -- This module implements {{documentation}}. local cfg = mw.loadData('Module:Documentation/config')
    35 KB (4,418 words) - 09:28, 3 July 2014
  • ...ing, testing and acceptance can be referred to the Region materials staff, or to the Construction and Technology Support Area staff. ...e during their preparation, storage and use regardless of previous testing or manufacturer certifications. This applies to materials such as HMA and con
    5 KB (767 words) - 14:44, 21 September 2023
  • ...color, religion (in the context of employment), sex, national origin, age, or disability. ...is MDOT’s Title VI Coordinator. Orlando can be contacted at 517-241-7462 or at [mailto:CurryO@michigan.gov Orlando Curry] for any issues related to civ
    16 KB (2,309 words) - 14:51, 21 March 2024
  • ...ate to a category of projects, capital program administrative testing, and/or to perform testing related work for an un-programmed project wherein the ac *Construction season closing process, including preparation of forms, documentation, manual updates, etc. (salary and travel).
    5 KB (701 words) - 08:12, 16 October 2023
  • ...ication should be documented accordingly by means of IDR, or other project documentation. ...he material delivered to the project against the materials source list and/or FieldBook associations.
    4 KB (611 words) - 16:09, 25 May 2022
  • ...n Engineering || Provide full or as needed construction administration and/or inspection services. ...onnection and processing of multiple sub-systems data, and the display and/or control in a Traffic Operations Center (TOC). A TOC is a physical location
    17 KB (2,411 words) - 15:12, 19 June 2017
  • ...ges– These types of changes will not require additional approval processes or assembly of review teams. ...e program either monetarily, staffing, equipment, procedural, material and documentation requirements. Type 3 Major Changes are noted in the Major Changes Table on
    5 KB (787 words) - 14:52, 19 December 2023
  • ...s will be applicable for trunkline projects with final completion dates on or after June 5, 2024. ...-compliance may assist the Contract Performance Evaluation Review Team and/or MDOT’s Prequalification Committee when reviewing patterns and trends. Th
    20 KB (2,842 words) - 13:29, 4 October 2023
  • ...ade mix designs and provide them to the Engineer along with the supporting documentation (temperature, slump, air content and compressive strength) from each trial ...pecifications include either non-standard (MDOT specified) concrete mixes, or ones that are known to generate compressive strengths substantially higher
    26 KB (3,908 words) - 11:41, 10 January 2024
  • ...and diligent in promptly submitting material documentation and supporting documentation per the specifications and special provisions in the contract. If they have #The contractor should have a quality assurance check on documentation submittals to ensure that the submittals are in the correct format with ide
    28 KB (4,153 words) - 15:37, 11 January 2024
  • <center><span STYLE="font: 40pt arial;">'''Underground or Above Ground Fuel Storage Tanks'''</span></center> ...and Technology Environmental Compliance Group by telephone at 517-322-1205 or Fax at 517-322-5664. Other backup numbers to call are 517-322-1647 and 517
    9 KB (1,344 words) - 10:51, 16 May 2024
  • ...ls used in MDOT’s construction and maintenance projects must be tested and/or approved before incorporation into the project. Materials are approved bas Proprietary materials or products previously evaluated and approved by C&T. Approved materials and
    21 KB (3,052 words) - 16:41, 22 November 2023
  • ...and understanding the Contractor's work with other projects working within or near the contract limits. * Is required to resolve construction disputes and/or claims concerning contract time.
    8 KB (1,206 words) - 14:27, 29 February 2024
  • ...ers directly at the construction sites and later transferred to a network, or desktop computer, located in the field office responsible for managing the ...er and FieldBook Tutorials, FieldManager User’s Guide, Trns*port interface or technical questions, please contact the Help Desk [mailto:MDOT-Construction
    25 KB (3,668 words) - 12:17, 1 May 2024
  • ...-of-way (ROW) agreements should also be checked for any special provisions or agreements. ...n on the plans. Stumps and roots need not be removed from peat excavation or disposal areas. Stumps may be buried with a minimum cover of 2 feet (700 m
    8 KB (1,133 words) - 12:01, 28 March 2023
  • ...not reasonably be determined, the work starts before prices are negotiated or other payment methods for compensation are impractical. Any work started b ...eer must approve the additional work (Approval can be documented on an IDR or an e-mail).
    41 KB (6,267 words) - 17:31, 6 June 2023
  • ...nstruction and maintenance projects by the department, railroad companies, or private industry are the basis for most railroad-highway projects. ...ment, field, and operations personnel to facilitate safety recommendations or activities related to proposed projects. Non-trunkline on-site inspections
    12 KB (1,772 words) - 17:35, 14 December 2023
  • MDOT will not sample, nor test for quality control or assist in controlling the Contractor’s production operations. However, c ...Engineer records of QC tests and inspections within 24 hours after testing or inspection in a format acceptable to the Engineer.
    30 KB (4,172 words) - 17:23, 3 January 2024
  • Progress clause documentation must also take this 12 month acceptance period into account for final proje ...imes associated with unique special provisions where certain manufacturers or products are specified. More information regarding steel superstructure is
    14 KB (2,146 words) - 13:54, 29 November 2023
  • <b>Local Public Agency (LPA):</b> The Michigan Public Act 51 city, village, or county road commission/department who applied, thru MDOT, for funds to perf ...te project signatory responsibilities to MDOT staff of an equivalent level or higher.
    30 KB (4,182 words) - 18:40, 13 December 2023
  • ...treams. Any work below the ordinary high-water elevation of an inland lake or stream requires an Inland Lakes and Streams Permit. ...ny construction, enlargement, repair, reconstruction, alteration, removal, or abandonment of any dam requires a Dam Safety Permit.
    19 KB (2,830 words) - 17:02, 15 February 2024
  • ...Engineer. The Engineer has 30 days to address all deficiencies and submit documentation once the Final Project Review Report is received. ...details are fresh and personnel are readily available. When all work and documentation is complete then the Final Project Review can be completed.
    16 KB (2,430 words) - 15:46, 6 May 2021
  • ...be required of all Contractors having a contract which is funded in whole or in part with federal funds. The Contractor may, after award, request a waiver or modification of the DBE participation goal. The Contractor must submit evid
    27 KB (4,137 words) - 14:31, 17 April 2024
  • ...mpactive effort would only drive the backfill into the remaining material, or where it is not desirable to impound water in impervious soils that would t ...ground is not a pay item in this instance. Density tests are required for documentation.
    7 KB (1,044 words) - 10:08, 13 September 2023
  • ...equipment when inside containments or when exposed to dust containing lead or solvent and paint fumes. At a minimum, MDOT is required to provide a medica ...l notify the Engineer of the employee’s test results if the results are at or above 15 µg/dL.
    33 KB (4,797 words) - 11:46, 25 April 2023
  • ==BRIDGE CONSTRUCTION AND BRIDGE DECK CONSTRUCTION INSPECTION AND DOCUMENTATION== ...rcement, wet and dry bridge deck concrete depth measurements, and required documentation for bridge construction inspection. This document must be coordinated with
    33 KB (4,932 words) - 16:38, 12 May 2021
  • ...dge Elements and Systems (PBES) other than beams, and sound wall posts and/or panels. ...g and refer to whether the strands are tensioned before concrete placement or after concrete placement, respectively.
    27 KB (4,105 words) - 11:45, 19 January 2022
  • ...the past would have been covered with sod are now being treated with mulch or mulch blanket, as well as topsoil, seed and fertilizer. The amount of sod ...be dressed to plan tolerance. Plans will usually show areas requiring sod or mulch blanket. A permit to place should be issued before work begins.
    15 KB (2,398 words) - 13:12, 26 July 2022
  • ...orporated in the work. Materials should be checked for damage in shipment or storage and to insure conformity to the required dimension, appearance and ...duction, manufacture or supplier's storage by the Bureau of Field Services or an appointed representative. The project office should receive the resulti
    15 KB (2,322 words) - 11:43, 19 January 2022
  • ...ssed for any revisions to the contract that alters the nature, scope, cost or schedule of the project. ...fication. Contract revisions may be positive or negative in dollar value, or even have no dollar value associated. The criteria for determining approva
    50 KB (7,380 words) - 16:11, 1 April 2024
  • ...e typically used on MDOT projects, column type supports from below, hanger or suspension type supports from above, and diaphragm types, where the hydraul ...emporary hanger rods are used, reject any rods with notches, nicks, welds, or excessive corrosion. Each length of bar used to make hanger rods must be sa
    14 KB (2,289 words) - 17:29, 10 April 2023
  • ...onduit or pipe that is constructed to convey treated water for consumption or to provide water for emergency services such as Fire Departments. The pipes ...ide of the pipe. Each section of pipe can either come with push-on joints or be bolted mechanically. Note that there may be additional material require
    18 KB (2,799 words) - 14:01, 27 September 2023
  • ...following standard naming convention for naming and organizing electronic documentation created during the administration of state and federally funded constructio '''Format: | FFFF or Variable | XXX | YYYY-MM-DD | XXXX | RX | Variable | XXXXXX'''
    57 KB (6,792 words) - 10:37, 13 May 2024
  • ...may result in heavy vehicles or construction equipment turning on the line or tracking material over a recessed area. ...is includes multiple applications applied in late fall, winter months, and/or early spring prior to durable markings being placed, being mindful of seaso
    56 KB (7,443 words) - 17:48, 9 October 2023
  • ...-ConstructionSoftware@michigan.gov MDOT-ConstructionSoftware@michigan.gov] or the FieldManager Helpdesk email [mailto:FieldManager-Admin@michigan.gov Fie ..., & updated flow chart. Also the threshold for Original Pay Item increase or decrease changed from $25k to $50k||[https://mdotwiki.state.mi.us/construct
    68 KB (8,871 words) - 10:45, 13 May 2024
  • ...ype of joints specified. Pavement includes mainline pavement, base course or concrete shoulders. * Concrete pavement condition survey or project log
    23 KB (3,714 words) - 10:16, 13 September 2023
  • ...perly constructed & installed correctly in the proper location. Misplaced or irregular signs can create a critical hazard to traffic. ...hall be complete and cover all materials which are identified on the plans or in the specifications. The Materials source list and documentations shall b
    19 KB (2,827 words) - 15:38, 2 April 2024
  • ...orkers whose duties are primarily administrative, executive, professional, or clerical, rather than manual. The required contract clauses exerting prevai ...that must be met or exceeded to comply with the requirements. A contractor or subcontractor performing work subject to a DBRA wage determination may sati
    63 KB (9,521 words) - 14:09, 1 April 2024
  • ...ted into the finished work at least 3 feet below the surface of the ground or is entirely under water. ...rent requirements of the National Ready Mixed Concrete Association (NRMCA) or other Department approved certification programs for automatic control and
    36 KB (5,127 words) - 13:21, 26 July 2022
  • ...cify treated timber piles. Foundation piles provide support for the bridge or structure when the existing soils do not provide adequate bearing capacity ...iles are battered no flatter than 3V:1H. This can be increased to 2.5V:1H or even 2V:1H where soil conditions are not good enough to provide sufficient
    32 KB (5,122 words) - 14:16, 29 February 2024
  • ...ons for Construction. Structural steel may be in the form of plate, rolled or bent shapes, hollow structural shapes, tube railing, steel deck grating, mo ...ngs are generally scheduled when the fabrication is more complex in nature or the fabricator is new to working with the Department but can be held for an
    45 KB (7,017 words) - 13:22, 26 July 2022
  • ...be incorporated in the pavement have been approved for use through testing or via pre-approved products lists as required for the contract. Most material ...rify that the assemblies were built in accordance with the standard plans. Documentation of Acceptance by Region materials personnel is required. Figures 602-1 and
    87 KB (13,988 words) - 15:30, 8 May 2024
  • ...rrow material. The Contractor will not remove borrow from the highway ROW or from MDOT-owned excess property unless authorized by the Engineer. Prior t ...remove borrow material from outside the grading limits (and either inside or outside the ROW), a statement disclaiming the quality and usefulness of the
    78 KB (12,236 words) - 14:45, 21 September 2023
  • ...and know how to perform the assigned tasks. Everyone, regardless of title or job function, must be aware of the need for safe work practices. Occupatio ...ed on one side with respect to a reference surface such as an adjacent mat or cut. It is used to match the profile of the edge of a mat to that of the a
    139 KB (21,114 words) - 15:08, 30 January 2024
  • ...ecking into a known elevation; alignment operations, such as bridge layout or sewer staking, are not to be left before checking into known control points ...rs are acceptable. Data generated with data collectors and total stations or GPS units must be downloaded and a hard copy provided. It must be provided
    201 KB (30,214 words) - 14:43, 19 June 2017
  • ...on, grouting, and carbon fiber wrapping. These rehabilitation techniques, or any combination of them, are used to improve the existing condition, and in ...eas of concrete removal, saw cutting the boundaries, hand chipping shallow or hand chipping deep, patch preparation and placing of the new concrete. Dec
    84 KB (13,299 words) - 11:46, 19 January 2022

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)