Search results

Jump to navigation Jump to search

Page title matches

  • <center><span STYLE="font: 40pt arial;">'''Division 2 Supplemental Information'''</span></center> :Waste Management Division
    9 KB (1,330 words) - 14:21, 23 September 2021

Page text matches

  • !colspan="2" | '''Construction Manual Table of Contents''' ...ps://mdotwiki.state.mi.us/construction/index.php?title=Category:Division_1 Division 1]
    4 KB (552 words) - 12:35, 1 May 2024
  • 12 x 231 = 2,772 Sft 2,772 x 1Syd/9Sft = 308 Syd
    1 KB (182 words) - 12:15, 1 May 2024
  • The selected project for interim review must have a minimum duration of 2 months and must be at least 30 percent complete by the time of the review. [[Category:Division 1]]
    4 KB (556 words) - 15:47, 6 May 2021
  • ...Safety Topics1.png|150px|left|link=https://www.michigan.gov/documents/mdot/2-High_Visibility_Safety_Apparel_in_Highway_Work_Zones_517655_7.pdf]]!![[File File:Safety Topics1.png|link=https://www.michigan.gov/documents/mdot/2-High_Visibility_Safety_Apparel_in_Highway_Work_Zones_517655_7.pdf
    28 KB (3,726 words) - 16:02, 8 March 2023
  • <center><span STYLE="font: 40pt arial;">'''Division 2 Supplemental Information'''</span></center> :Waste Management Division
    9 KB (1,330 words) - 14:21, 23 September 2021
  • <center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    68 KB (8,802 words) - 12:10, 1 May 2024
  • <div id="701.03.A.2"></div> ::'''2.''' Materials handling requirements of subsection [[Section 601 - Portlan
    12 KB (1,593 words) - 13:11, 26 July 2022
  • The Construction Field Services (CFS) Division has revised the Hot Mix Asphalt (HMA) Production Manual. A brief descripti ...: Removed “2-1500 grams samples of mixture (Virgin Mix Design only)” and “2-1900 grams samples of mixture “Reclaimed Asphalt Pavement Mixture only”
    4 KB (560 words) - 15:14, 19 June 2017
  • *'''Tier 2''' – Log projects selected by the region, TSC, or requested by a project :2. FHWA area engineer (FHWA oversight project only)
    7 KB (1,055 words) - 11:29, 14 July 2020
  • !Updated!! Division !! Section !! Summary !! What Changed |<center>6/9/2020</center>||<center>1 Supplemental</center>||<center>[[Interim_File_Review|Interim File Review]]</center>||Cre
    16 KB (2,430 words) - 15:46, 6 May 2021
  • ...ntrol, of the Standard Specifications for Construction, and any applicable supplemental specifications, Michigan Department of Environment, Great Lakes, and Energy ...xcavation or disposal areas. Stumps may be buried with a minimum cover of 2 feet (700 mm) in peat disposal areas, if approved.
    8 KB (1,133 words) - 12:01, 28 March 2023
  • ...ons for Construction. Projects with all major work on a single pay item or division will only be considered if the other submitted projects contain a more dive ...office project list and select the 3 projects to be examined for review. (2 closed and one active project)
    10 KB (1,464 words) - 13:56, 29 November 2023
  • ...may also include steps identified in [https://ecfr.io/Title-02/sp2.1.180.d 2 CFR 200: Subpart D], including: ...suspension or debarment proceedings [https://ecfr.io/Title-02/cfr180_main 2 CFR Part 180]
    13 KB (1,768 words) - 11:05, 13 July 2023
  • ...ck In, Export, etc. More information about functions is available on page 2 and 3 of this [http://www.michigan.gov/documents/mdot/MDOT_ProjectWise_Web_ ...for the purpose of records retention) is the date the Financial Operations Division (FOD) does the final billing to FHWA for federal funds. In addition to the
    12 KB (1,824 words) - 16:49, 18 April 2024
  • ...placing a concrete mixture of portland cement, blended portland cement, supplemental cementitious materials, fine aggregate, coarse aggregate, water, and admi ! colspan="2" |
    36 KB (5,127 words) - 13:21, 26 July 2022
  • ...tion of ITS devices into the sub-system<sup>1</sup> and overall system<sup>2</sup>. <sup>2</sup>Overall system: The connection and processing of multiple sub-systems
    17 KB (2,411 words) - 15:12, 19 June 2017
  • <center><span STYLE="font: 40pt arial;">'''Division 7 Supplemental Information'''</span></center> ...Bridge Decks Concrete Depth Measurements, for all bridge deck pours. See Division 706 of the Construction Manual for a sample form and instructions. Concret
    33 KB (4,932 words) - 16:38, 12 May 2021
  • | colspan="2" | | colspan="2" |
    30 KB (4,172 words) - 17:23, 3 January 2024
  • ...ersight (S&O) Agreement] detailing the arrangement between FHWA’s Michigan Division and MDOT regarding agency roles and responsibilities with respect to federa * Michigan Concrete Certifications (ACI Level 1, and Level 2)
    30 KB (4,182 words) - 18:40, 13 December 2023
  • * Supplemental Specifications ...o as not to disturb the existing base. If the existing base was more than 2 inches low before removal, corrections can be made by adding aggregate base
    23 KB (3,714 words) - 10:16, 13 September 2023

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)