Oldest pages

Jump to navigation Jump to search

Showing below up to 100 results in range #21 to #120.

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)

  1. 102.11 Bid Rejection‏‎ (10:10, 11 April 2017)
  2. 102.12 Bid Rejection Appeal‏‎ (10:11, 11 April 2017)
  3. 102.13 Consideration of Bids‏‎ (10:12, 11 April 2017)
  4. 103.01 Intent of the Contract‏‎ (15:38, 11 April 2017)
  5. 103.03 Contractor Engineer Communication‏‎ (15:52, 11 April 2017)
  6. 104.02 Plans and Working Drawings‏‎ (07:48, 12 April 2017)
  7. 104.03 Deviations from the Plans‏‎ (07:52, 12 April 2017)
  8. 104.04 Conformity with the Contrat‏‎ (07:55, 12 April 2017)
  9. 104.05 Removal of Unauthorized Work‏‎ (07:57, 12 April 2017)
  10. 104.06 Coordination of Drawing Dimensions and Contract Documentation‏‎ (08:03, 12 April 2017)
  11. 104.08 Cooperation by the Contractor‏‎ (08:10, 12 April 2017)
  12. 104.11 Work Zone Safety and Mobility‏‎ (11:18, 12 April 2017)
  13. 104.12 Approval for Use of the Right of Way‏‎ (11:21, 12 April 2017)
  14. 105.02 Natural Material Sources Found Within the Excavation Limits‏‎ (09:44, 14 April 2017)
  15. 105.03 Borrow Materials‏‎ (09:48, 14 April 2017)
  16. 105.04 Miscellameous Quantities‏‎ (09:50, 14 April 2017)
  17. 105.05 Approval of Materials Incorporated into the Work‏‎ (09:52, 14 April 2017)
  18. 105.06 Storage of Materials‏‎ (09:54, 14 April 2017)
  19. 105.08 Nonconforming Materials‏‎ (10:00, 14 April 2017)
  20. 105.09 Materials not Incorporated into the Work‏‎ (10:05, 14 April 2017)
  21. 107.02 Permits and Licenses‏‎ (08:05, 17 April 2017)
  22. 107.03 Patented Process and Materials‏‎ (08:10, 17 April 2017)
  23. 107.04 Federal Aid Participation‏‎ (08:12, 17 April 2017)
  24. 107.05 Sanitary Provisions‏‎ (08:15, 17 April 2017)
  25. 107.07 Protection and Restoration of Property‏‎ (08:20, 17 April 2017)
  26. 107.08 Land Monuments and Property Corners‏‎ (08:25, 17 April 2017)
  27. 107.10 Indemnification, Damage Liability, and Insurance‏‎ (08:38, 17 April 2017)
  28. 107.11 Contractor's Responsibility for the Work‏‎ (08:41, 17 April 2017)
  29. 107.13 Personal Liability of Public Officials‏‎ (08:49, 17 April 2017)
  30. 107.14 No Waiver of Legal Rights‏‎ (08:54, 17 April 2017)
  31. 107.16 Forest Protection‏‎ (09:00, 17 April 2017)
  32. 107.17 Use of Explosives‏‎ (09:01, 17 April 2017)
  33. 107.18 Work over Navigable Waters‏‎ (09:05, 17 April 2017)
  34. 107.20 Private Railroad Crossing for Haul Purposes‏‎ (09:09, 17 April 2017)
  35. 108.02 Limitations of Operations‏‎ (11:55, 17 April 2017)
  36. 108.03 Competence of Workers‏‎ (11:57, 17 April 2017)
  37. 108.04 Adequacy of Methods and Equipment‏‎ (11:59, 17 April 2017)
  38. 108.06 Determination of Contract Time for Work Day Contracts‏‎ (12:03, 17 April 2017)
  39. 108.11 Default of Contract‏‎ (13:26, 17 April 2017)
  40. 108.12 Termination of Contract‏‎ (13:27, 17 April 2017)
  41. 102.05 Preparation of Bid Items in the Proposal‏‎ (14:57, 18 April 2017)
  42. 109.06 Source of Supply and Carrier Rates on Materials‏‎ (18:01, 18 April 2017)
  43. Table of Contents Division 1‏‎ (11:18, 17 May 2017)
  44. Table of Contents Division 1 Supplemental‏‎ (14:34, 17 May 2017)
  45. 104.09 Lines, Grades, and Elevations‏‎ (14:43, 19 June 2017)
  46. Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects‏‎ (15:12, 19 June 2017)
  47. Hot Mix Asphalt Production Manual‏‎ (15:14, 19 June 2017)
  48. 107.21 Open to Traffic‏‎ (09:34, 23 October 2017)
  49. Projects with Incentive Provisions‏‎ (09:34, 3 January 2018)
  50. Pavement Historical Database‏‎ (09:37, 3 January 2018)
  51. Information Sharing About Construction Contractors and Consultants‏‎ (09:41, 3 January 2018)
  52. Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System‏‎ (09:42, 3 January 2018)
  53. Construction Manual Wiki Tips‏‎ (12:22, 7 May 2018)
  54. 107.19 Hauling on Local Roads and Streets‏‎ (14:50, 25 June 2019)
  55. Plans, Proposal, Input, Review and Evaluation‏‎ (11:29, 14 July 2020)
  56. 109.01 Measurement of Quantities‏‎ (15:05, 6 May 2021)
  57. 109.02 Scope of Payment‏‎ (15:06, 6 May 2021)
  58. 109.03 Payments for Increased or Decreased Quantities‏‎ (15:06, 6 May 2021)
  59. FHWA CAP Action Plans‏‎ (15:43, 6 May 2021)
  60. FPR Frequently Asked Questions‏‎ (15:46, 6 May 2021)
  61. Interim File Review‏‎ (15:47, 6 May 2021)
  62. Letter to File‏‎ (15:48, 6 May 2021)
  63. 700 - Closure of Unsafe Structures‏‎ (17:11, 6 May 2021)
  64. Division 7 Supplemental Information‏‎ (16:38, 12 May 2021)
  65. 107.01 Laws to be Observed‏‎ (17:20, 13 July 2021)
  66. 505 - Chip Seals‏‎ (18:14, 15 December 2021)
  67. 502 - HMA Crack Treatment‏‎ (18:15, 15 December 2021)
  68. 503 - Paver Placed Surface Seal‏‎ (18:16, 15 December 2021)
  69. 504 - Micro-Surfacing‏‎ (18:17, 15 December 2021)
  70. 506 - Slurry Seal‏‎ (18:17, 15 December 2021)
  71. Final Project Review Report‏‎ (08:57, 5 January 2022)
  72. 303 - Open Graded Drainage Course‏‎ (16:43, 12 January 2022)
  73. 305 - HMA Base Crushing and Shaping‏‎ (16:44, 12 January 2022)
  74. 306 - Aggregate Surface Course‏‎ (16:58, 12 January 2022)
  75. 308 - Geotextiles for Base‏‎ (16:59, 12 January 2022)
  76. 101 - Terms, Format, and Conditions‏‎ (17:23, 12 January 2022)
  77. 104.01 Authority of the Department‏‎ (17:28, 12 January 2022)
  78. 105.07 Handling and Transporting Materials‏‎ (17:32, 12 January 2022)
  79. 106 - Quality Assurance Acceptance Program‏‎ (17:34, 12 January 2022)
  80. 107.15 Compliance with Laws; Environmental Protection‏‎ (17:36, 12 January 2022)
  81. 108.01 Subcontracting of Contract Work‏‎ (17:38, 12 January 2022)
  82. 150 - Mobilization‏‎ (17:42, 12 January 2022)
  83. 402 - Storm Sewers‏‎ (17:47, 12 January 2022)
  84. 403 - Drainage Structures‏‎ (17:47, 12 January 2022)
  85. 404 - Underdrain‏‎ (17:47, 12 January 2022)
  86. 405 - Pump Station Construction‏‎ (17:47, 12 January 2022)
  87. 406 - Precast Three-Sided, Arch, and Box Culverts‏‎ (17:48, 12 January 2022)
  88. 701 - Portland Cement Concrete for Structures‏‎ (11:43, 19 January 2022)
  89. 702 - Mortar and Grout‏‎ (11:43, 19 January 2022)
  90. 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes‏‎ (11:43, 19 January 2022)
  91. 708 - Prestressed Concrete‏‎ (11:45, 19 January 2022)
  92. 711 - Bridge Railings‏‎ (11:46, 19 January 2022)
  93. 712 - Bridge Rehabilitation, Concrete‏‎ (11:46, 19 January 2022)
  94. 714 - Temporary Structures and Approaches‏‎ (11:47, 19 January 2022)
  95. 716 - Shop Cleaning and Coating Structural Steel‏‎ (11:47, 19 January 2022)
  96. 717 - Downspouts and Drains‏‎ (11:48, 19 January 2022)
  97. 719 - Earth Retaining Structures‏‎ (11:48, 19 January 2022)
  98. 801 - Concrete Driveways‏‎ (11:49, 19 January 2022)
  99. 802 - Concrete Curb, Gutter, and Dividers‏‎ (11:49, 19 January 2022)
  100. 803 - Concrete Sidewalk, Ramps, and Steps‏‎ (11:50, 19 January 2022)

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)